General Power System Risk Review

In accordance with rule 5.20A of the National Electricity Rules (NER), AEMO is required to undertake a General Power System Risk Review (GPSRR) and prepare a GPSRR report for the National Electricity Market (NEM) at least annually. From 2023, the GPSRR replaces and expands on the scope of the previous Power System Frequency Risk Review (PSFRR).

View previous PSFRRs

The GPSRR is an integrated, annual review of major power system risks in the National Electricity Market (NEM). The purpose of the GPSRR is to review:

  • A prioritised set of risks comprising contingency events and other events and conditions that could lead to cascading outages or major supply disruptions.
  • The current arrangements for managing the identified priority risks and options for their future management.
  • The arrangements for management of existing protected events and consideration of any changes or revocation.
  • The performance of existing emergency frequency control schemes and the need for any modifications.

Current status

AEMO is currently seeking feedback on the draft 2025 GPSRR report. The feedback period on the draft report is between 10 June 2025 and 1 July 2025. AEMO plans to publish the final GPSRR report by 31 July 2025.

Draft 2025 GPSRR report consultation 

AEMO invites all Registered Participants and interested parties to an industry question and answer session on the draft 2025 GPSRR report. The question and answer session will take place on 20 June 2025 at 1.00 pm (AEST). If you would like to attend the Q&A session, or if you have any questions about the GPSRR, please contact gpsrr@aemo.com.au

2025 GPSRR

2025 GPSRR approach