118433RESERVE NOTICE24/09/2024 11:13:14 PM

Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 24/09/2024

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 24/09/2024

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the SA region from 2300 hrs.
The Actual LOR1 condition is forecast to exist until 0200 hrs

The capacity reserve requirement is 600 MW
The minimum capacity reserve available is 520 MW

Manager NEM Real Time Operations
     
118422RECLASSIFY CONTINGENCY24/09/2024 02:53:49 PM

Cancellation - Reclassification of a Non Credible Contingency Event: Trip of Golden Plains No. 1 220 kV bus - Vic region - 20/08/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Reclassification of a Non Credible Contingency Event: Trip of Golden Plains No. 1 220 kV bus - Vic region - 20/08/2024

Refer to MN 117734

Based on advice from the asset owner, AEMO no longer considers the trip of Golden Plains No. 1 220 kV bus as a credible contingency event.


Therefore AEMO cancels the reclassification as a credible contingency event from 1450 hrs 24/09/2024.

Constraint Set revoked: NIL

Manager NEM Real Time Operations
     
118421MINIMUM SYSTEM LOAD24/09/2024 02:54:54 PM

Minimum System Load 1 (MSL1) in the VIC Region on 28/09/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the Victorian region from 1100 hrs to 1400 hrs 28/09/2024.
Minimum regional demand is forecast to be 1638 MW at 1300 hrs, and the advisory threshold is:
- MSL1 - 1865 MW
- MSL2 - 1365 MW
- MSL3 - 865 MW

MSL events are forecast when forecast regional demand is less than the relevant MSL threshold. The forecast regional demand is below the MSL1 threshold.

Refer to NEM Data Dashboard to monitor demand levels: https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/data-dashboard-nem

AEMO is seeking a market response.

An insufficient market response may require AEMO to take action or intervene to maintain power system security in Victoria. This may result in actions such as recalling network outages, the direction of scheduled production units, curtailment of non-scheduled production units, and/or a direction to maintain regional demand above required MSL threshold, in both Victoria and South Australia.

AEMO Operations
     
118398RECLASSIFY CONTINGENCY23/09/2024 12:53:03 PM

Cancellation - Reclassification of a Non-Credible Contingency Event: Eraring Power Station in NSW Region 23/09/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Reclassification of a Non-Credible Contingency Event: Eraring Power Station in NSW Region 23/09/2024

Refer to MN 118393

Based on advice from the asset owner, AEMO no longer considers the simultaneous trip of Eraring Power Station Units 2 and 4 as a credible contingency event.


Therefore AEMO cancels the reclassification as a credible contingency event from 1250 hrs 23/09/2024.

Constraint set N-ERARING_N-2 revoked from 1250 hrs 23/09/2024

Manager NEM Real Time Operations
     
118393RECLASSIFY CONTINGENCY23/09/2024 09:50:10 AM

Reclassification of a Non-Credible Contingency Event: Eraring Power Station in NSW Region 23/09/2024

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event: Eraring Power Station in NSW Region 23/09/2024

Based on advice from the asset owner, AEMO has declared the simultaneous trip of Eraring Power Station Units 2 and 4 as a credible contingency event.

AEMO considers the simultaneous trip of those generators to now be more likely.

AEMO has reclassified this as a credible contingency event from 1000 hrs 23/09/2024.

To manage power system security constraint set N-ERARING_N-2 invoked from 1000 hrs 23/09/2024 until further notice.

Manager NEM Real Time Operations
     
118351RECLASSIFY CONTINGENCY21/09/2024 12:14:30 AM

Cancellation of a Non-Credible Contingency Event: Farrell-John Butters line and Farrell-Rosebery-Newton-Queenstown line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: TAS1

Lines: Farrell-John Butters and Farrell-Rosebery-Newton-Queenstown

Cancellation time: 21/09/2024 00:14

Constraint set(s) revoked:
NONE

Refer AEMO Electricity Market Notice 118345

Auto-generated on behalf of Manager NEM Real Time Operations
     
118350RECLASSIFY CONTINGENCY21/09/2024 12:21:56 AM

Cancellation of Reclassification of a Non-Credible Contingency Event: Gordon - Chapel Street No.1 and No.2 220 kV lines in TAS1 due to Lightning

AEMO ELECTRICITY MARKET NOTICE.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning.

AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: TAS

Lines: Gordon - Chapel Street No.1 and No.2 220 kV lines

Cancellation time: 0020 hrs 21/09/2024

Constraint sets revoked: F-T-CSGO and T-CSGO_N-2

Manager NEM Real Time Operations
     
118349RECLASSIFY CONTINGENCY21/09/2024 12:09:32 AM

Cancellation of a Non-Credible Contingency Event: Farrell - Reece No.1 220 kV line and Farrell - Reece No.2 220 kV line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: TAS1

Lines: Farrell - Reece No.1 220 kV and Farrell - Reece No.2 220 kV

Cancellation time: 21/09/2024 00:09

Constraint set(s) revoked:
F-T-FARE_N-2 Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1


Refer AEMO Electricity Market Notice 118347

Auto-generated on behalf of Manager NEM Real Time Operations
     
118347RECLASSIFY CONTINGENCY20/09/2024 07:07:03 PM

Reclassification of a Non-Credible Contingency Event: Farrell - Reece No.1 220 kV line and Farrell - Reece No.2 220 kV line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: TAS1

Lines: Farrell - Reece No.1 220 kV and Farrell - Reece No.2 220 kV

Duration: 20/09/2024 19:06 until further notice

Constraint set(s) invoked:
F-T-FARE_N-2 Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1


Auto-generated on behalf of Manager NEM Real Time Operations
     