Cancellation of a Non-Credible Contingency Event: Eildon PS - Mt Beauty No.1 220 kV line and Eildon PS - Mt Beauty No.2 220 kV line in VIC1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: VIC1
Lines: Eildon PS - Mt Beauty No.1 220 kV and Eildon PS - Mt Beauty No.2 220 kV
Cancellation time: 25/01/2019 22:04
Constraint set(s) revoked:
NONE
Refer AEMO Electricity Market Notice 66831
Auto-generated on behalf of Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Hazelwood - Rowville No.1 220kV line and Hazelwood - Rowville No.2 220kV line in VIC1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: VIC1
Lines: Hazelwood - Rowville No.1 220kV and Hazelwood - Rowville No.2 220kV
Duration: 25/01/2019 21:50 until further notice
Constraint set(s) invoked:
V-HWRO_R_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No.1 220 kV line and Dederang - Glenrowan No.3 220 kV line in VIC1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: VIC1
Lines: Dederang - Glenrowan No.1 220 kV and Dederang - Glenrowan No.3 220 kV
Duration: 25/01/2019 20:26 until further notice
Constraint set(s) invoked:
V-DDGN_N-2 Constraint set contains the following interconnector(s) on the left hand side:
V-S-MNSP1
V-SA
VIC1-NSW1
Auto-generated on behalf of Manager NEM Real Time Operations
Update -Inter-regional transfer limit reduction Tasmania region - Basslink - 25/01/2019
Update -Inter-regional transfer limit reduction Tasmania region - Basslink - 25/01/2019
Refer AEMO Electricity Market Notice 66833
Due to Bushfires in the Tasmania region the FCSPs and NCSPS control schemes have been made non-auto. The Tasmania TNSP has advised an updated limit on the power transfers for Basslink.
Basslink MW transfer TAS to VIC limit 150 MW
Basslink MW transfer VIC to TAS limit 0 MW
The following Constraint sets have been invoked at 2000 hrs until further notice.
I-TV_150
I-VT_000
The constraints have the following interconnectors on the LHS
T-V_MNSP1
Manager NEM Real Time Operations
Cancellation of a Non-Credible Contingency Event: Dederang - Glenrowan No.1 220 kV line and Dederang - Glenrowan No.3 220 kV line in VIC1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: VIC1
Lines: Dederang - Glenrowan No.1 220 kV and Dederang - Glenrowan No.3 220 kV
Cancellation time: 25/01/2019 19:49
Constraint set(s) revoked:
V-DDGN_N-2 Constraint set contains the following interconnector(s) on the left hand side:
V-S-MNSP1
V-SA
VIC1-NSW1
Refer AEMO Electricity Market Notice 66834
Auto-generated on behalf of Manager NEM Real Time Operations
Cancellation of a Non-Credible Contingency Event: Hazelwood - Rowville No.1 220kV line and Hazelwood - Rowville No.2 220kV line in VIC1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: VIC1
Lines: Hazelwood - Rowville No.1 220kV and Hazelwood - Rowville No.2 220kV
Cancellation time: 25/01/2019 19:39
Constraint set(s) revoked:
V-HWRO_R_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE
Refer AEMO Electricity Market Notice 66818
Auto-generated on behalf of Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No.1 220 kV line and Dederang - Glenrowan No.3 220 kV line in VIC1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: VIC1
Lines: Dederang - Glenrowan No.1 220 kV and Dederang - Glenrowan No.3 220 kV
Duration: 25/01/2019 18:48 until further notice
Constraint set(s) invoked:
V-DDGN_N-2 Constraint set contains the following interconnector(s) on the left hand side:
V-S-MNSP1
V-SA
VIC1-NSW1
Auto-generated on behalf of Manager NEM Real Time Operations
Inter-regional transfer limit reduction Tasmania region - Basslink - 25/01/2019
Inter-regional transfer limit reduction Tasmania region - Basslink - 25/01/2019
Due to Bushfires in the Tasmania region the FCSPs and NCSPS control schemes have been made non-auto. The Tasmania TNSP has advised a limit on transfers for Basslink.
Basslink MW transfer TAS to VIC limit 150 MW
Basslink MW transfer VIC to TAS limit 150 MW
The following Constraint sets have been invoked at 1820 hrs until further notice.
I-TV_150
I-VT_150
The constraints have the following interconnectors on the LHS
T-V_MNSP1
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the Vic region - 25/01/2019
Cancellation of Actual (LOR1) condition in the Vic region - 25/01/2019
The Actual LOR1 Condition in the Vic Region advised in AEMO Electricity Market Notice No.66746 is cancelled at 1800 hrs 25/01/2019.
Manager NEM Real Time Operations