66834RECLASSIFY CONTINGENCY25/01/2019 06:48:13 PM

Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No.1 220 kV line and Dederang - Glenrowan No.3 220 kV line in VIC1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: VIC1

Lines: Dederang - Glenrowan No.1 220 kV and Dederang - Glenrowan No.3 220 kV

Duration: 25/01/2019 18:48 until further notice

Constraint set(s) invoked:
V-DDGN_N-2 Constraint set contains the following interconnector(s) on the left hand side:
V-S-MNSP1
V-SA
VIC1-NSW1


Auto-generated on behalf of Manager NEM Real Time Operations
66833INTER-REGIONAL TRANSFER25/01/2019 06:52:05 PM

Inter-regional transfer limit reduction Tasmania region - Basslink - 25/01/2019

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit reduction Tasmania region - Basslink - 25/01/2019

Due to Bushfires in the Tasmania region the FCSPs and NCSPS control schemes have been made non-auto. The Tasmania TNSP has advised a limit on transfers for Basslink.

Basslink MW transfer TAS to VIC limit 150 MW

Basslink MW transfer VIC to TAS limit 150 MW

The following Constraint sets have been invoked at 1820 hrs until further notice.

I-TV_150
I-VT_150
The constraints have the following interconnectors on the LHS

T-V_MNSP1

Manager NEM Real Time Operations
66832RESERVE NOTICE25/01/2019 06:05:57 PM

Cancellation of Actual (LOR1) condition in the Vic region - 25/01/2019

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the Vic region - 25/01/2019

The Actual LOR1 Condition in the Vic Region advised in AEMO Electricity Market Notice No.66746 is cancelled at 1800 hrs 25/01/2019.

Manager NEM Real Time Operations
66831RECLASSIFY CONTINGENCY25/01/2019 05:02:05 PM

Reclassification of a Non-Credible Contingency Event: Eildon PS - Mt Beauty No.1 220 kV line and Eildon PS - Mt Beauty No.2 220 kV line in VIC1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: VIC1

Lines: Eildon PS - Mt Beauty No.1 220 kV and Eildon PS - Mt Beauty No.2 220 kV

Duration: 25/01/2019 17:02 until further notice

Constraint set(s) invoked:
NONE

Auto-generated on behalf of Manager NEM Real Time Operations
66830PRICES UNCHANGED25/01/2019 04:09:31 PM

[EventId:201901241750_confirmed] Prices for interval 24-Jan-2019 17:50 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1609 hrs on 25 January 2019

PRICES ARE NOW CONFIRMED for dispatch interval 24-Jan-2019 17:50.

In accordance with Market Notice 66658 AEMO has reviewed this dispatch interval and determined that:
- Over-Constrained Dispatch has been resolved for this interval

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
66829RECLASSIFY CONTINGENCY25/01/2019 04:12:36 PM

Reclassification of a Non-Credible Contingency Event:Palmerston - Liapootah - Waddamana - Palmerston No. 1 and No. 2 220 kV Lines and the Palmerston - Waddamana 110kV line in Tasmania due to bushfire

AEMO ELECTRICITY MARKET NOTICE.

Reclassification of a Non-Credible Contingency Event: Liapootah - Waddaman - Palmerston No. 1 and No. 2 220 kV Lines in Tasmania due to bushfire.

AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: TAS

Lines: Liapootah - Waddamana - Palmerston No. 1 and No. 2 220 kV Lines and the Palmerston - Waddamana 110kV line

Duration: 25/01/2019 1610 hrs until further notice
Constraint set(s) invoked: T-LIPM_PMWA_N-3

Manager NEM Real Time Operations
66828RESERVE NOTICE25/01/2019 04:01:03 PM

Cancellation of Actual (LOR2) condition in the Vic region - 25/01/2019

AEMO ELECTRICITY MARKET NOTICE

The Actual LOR2 Condition in the Vic Region advised in AEMO Electricity Market Notice No.66751 is cancelled at 1600 hrs 25/01/2019.

Manager NEM Real Time Operations
66827MARKET INTERVENTION25/01/2019 04:30:43 PM

Cancellation - AEMO Intervention Event -Intervention price dispatch intervals

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - Intervention price dispatch intervals
Refer Market Notice 66822.
The AEMO Intervention Event, the dispatch of Reliability and Emergency Reserve Trader (RERT) has ended at 1630 hrs 25/01/2019. Activation of reserve contract(s) for RERT dispatch in VIC1 has ended.

Manager NEM Real Time Operations
66826PRICE ADJUSTMENT25/01/2019 03:30:16 PM

[EventId:201901241700_confirmed] Prices for interval 24-Jan-2019 17:00 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1530 hrs on 25 January 2019

PRICES ARE NOW CONFIRMED for dispatch interval 24-Jan-2019 17:00.

In accordance with Market Notice 66636 AEMO has reviewed this dispatch interval and determined that:
- Over-Constrained Dispatch has been resolved for this interval

Changed Prices ($/MWh)

TYPE
Region Original Adjusted
Price Price
ENERGY
SA1 $9,666.67 $13,654.72


This is an AEMO autogenerated Market Notice.