74966RESERVE NOTICE17/03/2020 09:34:03 AM

RESERVE NOTICE MT PASA PUBLICATION 17 March 2020

The MTPASA result published on 17 March 2020 identifies no Low Reserve Conditions.

Please note that MTPASA informs the market of potential reliability issues to allow the market to respond in the first instance, potentially avoiding the need for any market intervention or direction from AEMO.

For further information, please refer to:
https://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Data/Market-Management-System-MMS/Projected-Assessment-of-System-Adequacy

This notice supersedes Market Notice 74862 published on 10 March 2020.

Background
As part of a broader process of implementing the reliability standard, AEMO runs the Medium Term Projected Assessment of System Adequacy (MTPASA) process weekly to forecast expected unserved energy levels over a two year period. If the expected annual unserved energy exceeds the maximum level specified by the Reliability Standard, a Low Reserve Condition is identified.

For more information about how AEMO implements the reliability standard, please view the Reliability Standard Implementation Guidelines (RSIG) available on AEMO's website at
https://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Planning-and-forecasting/Reliability-Standard-Implementation-Guidelines

Forecasting
AEMO
74965MARKET INTERVENTION16/03/2020 04:06:10 PM

Direction - SA Region - 16/03/2020

AEMO ELECTRICITY MARKET NOTICE.

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).

The direction was necessary to maintain the power system in a secure operating state.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

The issue of the direction commences an AEMO intervention event.

AEMO declares all dispatch intervals during the event to be intervention dispatch intervals, commencing from the interval ending 1610 hrs on 16/03/2020.

Intervention pricing does not apply to this AEMO intervention event.


Manager NEM Real Time Operations
74963MARKET INTERVENTION16/03/2020 01:05:24 PM

Cancellation - AEMO Intervention Event - Intervention price dispatch intervals - Direction SA region 12/03/2020

AEMO ELECTRICITY MARKET NOTICE

Refer Market Notices 74885

The AEMO Intervention Event and all associated directions are cancelled from 1300 hrs 16/03/2020.

Manager NEM Real Time Operations
74961MARKET INTERVENTION16/03/2020 10:48:46 AM

Update - Possible intervention to manage power system security in South Australia (SA) Region

AEMO ELECTRICITY MARKET NOTICE

Possible intervention to manage power system security in South Australia (SA) Region

The synchronous generating units expected to be synchronised in SA from 0400 hrs 17 Mar 2020 to 1230 hrs 17 Mar 2020 in Pre-dispatch published at 1030 hrs 16 Mar 2020 are inadequate to maintain sufficient system strength in SA and hence a secure operating state.

AEMO currently estimates that, in the absence of sufficient market response by 1700 hrs 16 Mar 2020, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operations
74960MARKET SYSTEMS16/03/2020 10:45:44 AM

CHG0058447: Maintenance activity - STTM PreProduction System

Notification issued to: Market Notice

Notification Type: Initial

Change Type: Normal

Service/ Component: Short Term Trading Market

Change Title: Maintenance activity - STTM PreProduction Systems

Change Start Date & Time: 18/03/2020 09:00:00 AEST

Change End Date & Time: 18/03/2020 17:00:00 AEST

Outage Start Date & Time: 18/03/2020 09:00:00 AEST

Outage End Date & Time: 18/03/2020 17:00:00 AEST

Change Description:

Maintenance activities to be performed on the pre-production Short Term Trading Market Systems.

Environment: Pre-Production

Participant Impact and Requirements:

All access to the pre-production Short Term Trading Market systems will be unavailable.

Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
74959MARKET INTERVENTION16/03/2020 07:46:59 AM

Possible intervention to manage power system security in South Australia (SA) Region

AEMO ELECTRICITY MARKET NOTICE

Possible intervention to manage power system security in South Australia (SA) Region

The synchronous generating units expected to be synchronised in SA from 2200 hrs 16 Mar 2020 to 1230 hrs 17 Mar 2020 in Pre-dispatch published at 0730 hrs 16 Mar 2020 are inadequate to maintain sufficient system strength in SA and hence a secure operating state.

AEMO currently estimates that, in the absence of sufficient market response by 1700 hrs 16 Mar 2020, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operations
74956INTER-REGIONAL TRANSFER16/03/2020 05:19:29 AM

Cancellation - Inter-regional transfer limit variation: Hazelwood - South Morang No.1 500 kV Line (Vic) - Voltage Control

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Inter-regional transfer limit variation: Hazelwood - South Morang No.1 500 kV Line (Vic) - Voltage Control

Refer AEMO Electricity Market Notice 74898

The Hazelwood - South Morang No.1 500 kV Line has been returned to service.

The following constraint set was revoked at 0520 hrs 16/03/2020
V-HWSM

The constraint set contains equations with the following interconnectors on the LHS.

T-V-MNSP1
V-S-MNSP1
V-SA
VIC1-NSW1

Manager NEM Real Time Operations
74953NON-CONFORMANCE15/03/2020 10:10:15 AM

NON-CONFORMANCE Region NSW1 Sunday, 15 March 2020

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE NSW1 Region Sunday, 15 March 2020

AEMO declared a schedule generating unit non-conforming

Unit: VP5
Duration: 15/03/2020 10:05 to 15/03/2020 10:10
Amount: 36 MW
Constraint: NC-N_VP5

Auto-generated on behalf of Manager NEM Real Time Operations
74951PRICES UNCHANGED14/03/2020 03:47:22 PM

[EventId:202003141525_confirmed] Prices for interval 14-Mar-2020 15:25 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1545 hrs on 14 March 2020

PRICES ARE NOW CONFIRMED for dispatch interval 14-Mar-2020 15:25.

In accordance with Market Notice 74938 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.