74998MARKET INTERVENTION21/03/2020 05:02:12 PM

Direction - SA region - 21/03/2020

AEMO ELECTRICITY MARKET NOTICE.

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).

The direction was necessary to maintain the power system in a secure operating state.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

The issue of the direction commences an AEMO intervention event. AEMO declares all dispatch intervals during the event to be intervention dispatch intervals, commencing from the interval ending 02:35 on 22/03/2020.

Intervention pricing does not apply to this AEMO intervention event.

Manager NEM Real Time Operations
74996MARKET INTERVENTION21/03/2020 01:51:23 PM

Possible intervention to manage power system security in South Australia (SA) Region

AEMO ELECTRICITY MARKET NOTICE

Possible intervention to manage power system security in South Australia (SA) Region

The synchronous generating units expected to be synchronised in SA from 0230 hrs 22/03/2020 to 0400 hrs 23/03/2020 in Pre-dispatch published at 1330 hrs 21/03/2020 are inadequate to maintain sufficient system strength in SA and hence a secure operating state.

AEMO currently estimates that, in the absence of sufficient market response by 1700 hrs 21/03/2020, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operations
74995NON-CONFORMANCE21/03/2020 05:40:14 AM

NON-CONFORMANCE Region NSW1 Saturday, 21 March 2020

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE NSW1 Region Saturday, 21 March 2020

AEMO declared a schedule generating unit non-conforming

Unit: BW04
Duration: 21/03/2020 05:30 to 21/03/2020 05:40
Amount: -21 MW
Constraint: NC-N_BW04

Auto-generated on behalf of Manager NEM Real Time Operations
74994NON-CONFORMANCE20/03/2020 10:40:15 AM

NON-CONFORMANCE Region TAS1 Friday, 20 March 2020

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE TAS1 Region Friday, 20 March 2020

AEMO declared a schedule generating unit non-conforming

Unit: MUSSELR1
Duration: 20/03/2020 10:35 to 20/03/2020 10:40
Amount: 58 MW
Constraint: NC-T_MUSSELR1

Auto-generated on behalf of Manager NEM Real Time Operations
74993RECLASSIFY CONTINGENCY20/03/2020 02:44:10 AM

Cancellation of a Non-Credible Contingency Event: Farrell-Sheffield No.1 220 kV line and Farrell-Sheffield No.2 220 kV line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: TAS1

Lines: Farrell-Sheffield No.1 220 kV and Farrell-Sheffield No.2 220 kV

Cancellation time: 20/03/2020 02:44

Constraint set(s) revoked:
F-T-FASH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1
T-FASH_N-2_CP4_S3 Constraint set contains the following interconnector(s) on the left hand side:
NONE


Refer AEMO Electricity Market Notice 74992

Auto-generated on behalf of Manager NEM Real Time Operations
74992RECLASSIFY CONTINGENCY20/03/2020 01:41:40 AM

Reclassification of a Non-Credible Contingency Event: Farrell-Sheffield No.1 220 kV line and Farrell-Sheffield No.2 220 kV line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: TAS1

Lines: Farrell-Sheffield No.1 220 kV and Farrell-Sheffield No.2 220 kV

Duration: 20/03/2020 01:41 until further notice

Constraint set(s) invoked:
F-T-FASH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1
T-FASH_N-2_CP4_S3 Constraint set contains the following interconnector(s) on the left hand side:
NONE


Auto-generated on behalf of Manager NEM Real Time Operations
74991RECLASSIFY CONTINGENCY19/03/2020 10:04:10 PM

Cancellation of a Non-Credible Contingency Event: Hazelwood - Rowville No.1 220kV line and Hazelwood - Rowville No.2 220kV line in VIC1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: VIC1

Lines: Hazelwood - Rowville No.1 220kV and Hazelwood - Rowville No.2 220kV

Cancellation time: 19/03/2020 22:04

Constraint set(s) revoked:
V-HWRO_R_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE


Refer AEMO Electricity Market Notice 74990

Auto-generated on behalf of Manager NEM Real Time Operations
74990RECLASSIFY CONTINGENCY19/03/2020 09:00:50 PM

Reclassification of a Non-Credible Contingency Event: Hazelwood - Rowville No.1 220kV line and Hazelwood - Rowville No.2 220kV line in VIC1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: VIC1

Lines: Hazelwood - Rowville No.1 220kV and Hazelwood - Rowville No.2 220kV

Duration: 19/03/2020 21:00 until further notice

Constraint set(s) invoked:
V-HWRO_R_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE


Auto-generated on behalf of Manager NEM Real Time Operations
74989MARKET INTERVENTION19/03/2020 04:45:26 PM

Cancellation - AEMO Intervention Event - Intervention price dispatch intervals - Direction SA region 18/03/2020

AEMO ELECTRICITY MARKET NOTICE

Refer Market Notices 74974

The AEMO Intervention Event and all associated directions are cancelled from 1600 hrs 19/03/2020.

Manager NEM Real Time Operations