Market Notices

127343RECLASSIFY CONTINGENCY31/05/2025 05:02:27 PM

Reclassification of non-credible contingency event due to existence of widespread abnormal conditions - All NEM regions.

AEMO ELECTRICITY MARKET NOTICE.

AEMO has identified that a non-credible contingency event impacting the power system is more likely to occur and is considered reasonably possible because of the existence of widespread abnormal conditions namely Severe Space Weather Watch in all NEM regions.

AEMO has therefore reclassified the occurrence of a non-credible contingency event involving multiple plant due to these abnormal conditions as credible.

Need for further measures is being monitored and further measures may be implemented in line with the Power System Security Guidelines (SO_OP_3715).

Manager NEM Real Time Operations
     
127342RESERVE NOTICE31/05/2025 04:03:56 PM

STPASA - Update - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 02/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition advised in AEMO Electricity Market Notice No. 127338 for the NSW region has been updated at 1600 hrs 31/05/2025 to the following:

From 1800 hrs to 1830 hrs 02/06/2025.
The forecast capacity reserve requirement is 1829 MW.
The minimum capacity reserve available is 1805 MW.


AEMO Operations
     
127339RESERVE NOTICE30/05/2025 03:23:56 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 30/05/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 127336 is cancelled at 1500 hrs 30/05/2025.

Manager NEM Real Time Operations
     
127338RESERVE NOTICE30/05/2025 03:14:59 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 02/06/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:

From 1730 hrs to 1900 hrs 02/06/2025.
The forecast capacity reserve requirement is 1859 MW.
The minimum capacity reserve available is 1684 MW.


AEMO Operations

     
127336RESERVE NOTICE29/05/2025 09:51:59 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 30/05/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:


[1.] From 1730 hrs 30/05/2025 to 1800 hrs 30/05/2025.
The forecast capacity reserve requirement is 1738 MW.
The minimum capacity reserve available is 1669 MW.

Manager NEM Real Time Operations
     
127333RECLASSIFY CONTINGENCY29/05/2025 04:58:51 PM

Cancellation of the Reclassification of a Non-Credible Contingency Event: Loss of the Sheffield - Burnie No. 1 220kV Line, Sheffield - Burnie No. 2 110kV Line and the Ulverstone - Emu Bay 110kV Line in TAS1 due to lightning

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event .

Based on advice received from the asset owner, AEMO no longer considers the trip of the Sheffield - Burnie No. 1 220kV Line, Sheffield - Burnie No. 2 110kV Line and the Ulverstone - Emu Bay 110kV Line in TAS1 due to lightning as a credible contingency when there is lightning activity in the vicinity.

Accordingly the reclassification as a credible contingency is cancelled .


Region: TAS1

Element: Sheffield - Burnie No. 1 220kV Line, Sheffield - Burnie No. 2 110kV Line and the Ulverstone - Emu Bay 110kV Line

Cancellation time: 29/05/2025 1600 hrs

Constraint set(s) revoked: NONE

Refer AEMO Electricity Market Notices 125566

Manager NEM Real Time Operations
     
127303RECLASSIFY CONTINGENCY27/05/2025 11:55:36 AM

Cancellation of the reclassification of a Non-Credible Contingency Event: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines in SA due to severe weather warning .

AEMO ELECTRICITY MARKET NOTICE.

Cancellation of the reclassification of a non-credible contingency event as a credible contingency event due to severe weather warning.
AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any severe weather warning in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: SA
Lines: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines
Cancellation time: 1150 hrs 27/05/2025
Constraint set(s) revoked: Nil
Refer AEMO Electricity Market Notice 127230

Manager NEM Real Time Operations
     
127300RECLASSIFY CONTINGENCY27/05/2025 12:33:55 AM

Cancellation of a Non-Credible Contingency Event: Bayswater - Mt Piper No.5A3 500kV line and Wollar - Mt Piper No.5A5 500kV line in NSW1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: NSW1

Lines: Bayswater - Mt Piper No.5A3 500kV and Wollar - Mt Piper No.5A5 500kV

Cancellation time: 27/05/2025 00:33

Constraint set(s) revoked:
NONE

Refer AEMO Electricity Market Notice 127295

Auto-generated on behalf of Manager NEM Real Time Operations
     
127299RECLASSIFY CONTINGENCY27/05/2025 12:12:40 AM

Cancellation of a Non-Credible Contingency Event: Burnie - Port Latta - Smithton 1 110kV line and Burnie - Port Latta - Smithton 2 110kV line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: TAS1

Lines: Burnie - Port Latta - Smithton 1 110kV and Burnie - Port Latta - Smithton 2 110kV

Cancellation time: 27/05/2025 00:12

Constraint set(s) revoked:
NONE

Refer AEMO Electricity Market Notice 127286

Auto-generated on behalf of Manager NEM Real Time Operations
     