Update - Possible intervention to manage power system security in SA Region
Update - Possible intervention to manage power system security in SA Region
Refer to MN 88341
The synchronous generating units currently expected to be synchronised in SA from 2200 hrs 19/07/2021 to 1630 hrs 20/07/2021 will be inadequate to maintain sufficient system strength in SA and hence a secure operating state.
AEMO estimates that, in the absence of sufficient market response by 1630 hrs 19/07/2021, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 19/07/2021
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
From 1800 hrs 19/07/2021 to 1900 hrs 19/07/2021
The forecast capacity reserve requirement is 1102 MW.
The minimum capacity reserve available is 1052 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 19/07/2021
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No 88402 is cancelled at 1010 hrs 19/07/2021.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region beginning on 20/07/2021
The Forecast LOR2 conditions in the NSW region advised in AEMO Electricity Market Notice No. 88348 have been updated at 1000 hrs 19/07/2021 to the following:
[1.] From 1800 hrs 21/07/2021 to 1900 hrs 21/07/2021.
The forecast capacity reserve requirement is 1498 MW.
The minimum capacity reserve available is 1192 MW.
[2.] From 0730 hrs 22/07/2021 to 0800 hrs 22/07/2021.
The forecast capacity reserve requirement is 1240 MW.
The minimum capacity reserve available is 1128 MW.
The Forecast LOR2 condition on 20/07/2021 in the NSW region advised in AEMO Electricity Market Notice No. 88348 is cancelled.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region beginning on 20/07/2021
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 88338 and 88347 are cancelled at 1000 hrs 19/07/2021.
AEMO Operations
Correction - PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 19/07/2021
This is a correction to MN 88393.
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 88362 is cancelled at 0820 hrs 19/07/2021.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the NSW region - 19/07/2021
Cancellation of Actual (LOR1) condition in the NSW region - 19/07/2021
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.88386 is cancelled at 0940hrs 19/07/2021
Manager NEM Real Time Operations
INC0072513 : Marketnet VPN at Norwest having intermittent issues - Resolved
INC0072513 - Marketnet VPN at Norwest having intermittent issues - Resolved
Participants should now be able to connect to the Norwest site-site VPN
For further enquiries please contact the AEMO Support Hub
Phone: 1300 236 600
Email: supporthub@aemo.com.au
AEMO IT Duty Manager
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 19/07/2021
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 88395 has been updated at 0850 hrs to the following:
From 1800 hrs 19/07/2021 to 1830 hrs 19/07/2021
The forecast capacity reserve requirement is 1088 MW.
The minimum capacity reserve available is 1076 MW.
Manager NEM Real Time Operations