Market Notices

126953MARKET INTERVENTION08/05/2025 02:59:29 PM

Cancellation - AEMO Intervention Event - SA region 07/05/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - SA region 07/05/2025

Refer to Market Notice 126936

The AEMO Intervention Event and all associated directions are cancelled from 1500 hrs on 08/05/2025.


Manager NEM Real Time Operations
     
126952MARKET INTERVENTION08/05/2025 02:59:29 PM

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 126937

Direction is cancelled from: 1500 hrs 08/05/2025

Manager NEM Real Time Operations
     
126951MARKET INTERVENTION08/05/2025 02:33:05 PM

Update - Foreseeable AEMO intervention in SA region

AEMO ELECTRICITY MARKET NOTICE

Update - Foreseeable AEMO intervention in SA region

Refer AEMO Electricity Market Notice 126950

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0830 hrs 09/05/2025.

The foreseeable circumstance requiring the need for intervention is Voltage.

AEMO estimates that, in the absence of sufficient market response by 1600 hrs 08/05/2025, AEMO may need to intervene by issuing a direction.

Manager NEM Real Time Operations
     
126950MARKET INTERVENTION08/05/2025 01:00:21 PM

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0830 hrs 09/05/2025.

The foreseeable circumstance requiring the need for intervention is Voltage.

Manager NEM Real Time Operations
     
126946MARKET INTERVENTION08/05/2025 04:00:05 AM

Cancellation - AEMO Intervention Event - SA region 02/05/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - SA region 02/05/2025

Refer to Market Notice 126848

The AEMO Intervention Event and all associated directions are cancelled from 0400 hrs on 08/05/2025.


Manager NEM Real Time Operations
     
126944MARKET INTERVENTION08/05/2025 03:56:36 AM

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 126904

Direction is cancelled from: 0400 hrs 08/05/2025

Manager NEM Real Time Operations
     
126943MARKET INTERVENTION08/05/2025 03:56:36 AM

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

Refer to Market Notice 126907

Direction is cancelled from: 0400 hrs 08/05/2025

Manager NEM Real Time Operations
     
126941SETTLEMENTS RESIDUE07/05/2025 07:30:31 PM

[EventId:202505071930_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 07 May 2025 19:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1930 hrs on 7 May 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 7 May 2025.

Refer to market notice: 126940

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1930 hrs on 7 May 2025.

This is an AEMO autogenerated Market Notice.
     
126940SETTLEMENTS RESIDUE07/05/2025 05:35:32 PM

[EventId:202505071735_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 07 May 2025 17:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1735 hrs on 7 May 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 7 May 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1735 hrs on 7 May 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.