Load Restoration Direction Cancellation in the Vic Region
Cancellation - Load Restoration Direction in the Vic Region - 13/02/2024
Refer to AEMO Electricity Market Notice ID 114607
Load restoration as directed is complete. Direction cancelled from 1510 hrs 13/02/2024.
Manager NEM Real Time Operations
Load Restoration Direction in the Vic Region
Load Restoration Direction in the Vic Region
AEMO has directed load restoration commencing at 1450 hrs 13/02/2024 in the Victoria region
The direction was issued under section 116 of the NEL, and was a clause 4.8.9 instruction under the NER.
Manager NEM Real Time Operations
System Reconfiguration - QLD Region - 20/11/2020
System Reconfiguration - QLD Region - 20/11/2020
The following transmission equipment in the Queensland region has been returned to service at 275 kV - 20/11/2020
H13 Ross - H39 Woree No. 8966 275 kV Transmission line - previously operated as 132 kV feeders 7327, 7132 and 7301
The following transmission equipment in the Queensland region has been taken out of service - 20/11/2020
H32 Chalumbin - H39 Woree No. 877 275 kV Transmission line - due to risk of cable failure
The following transmission equipment in the Queensland region has been deenergised - 20/11/2020
H13 Ross - H32 Chalumbin No. 857 275 kV Transmission line - to free up a bay at H13 Ross for the 8966 275 kV line