Update to system strength constraints in North Queensland
Refer to market notice 110677
AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland.
Due to commissioning of new feeder 8905 (H13 Ross - H39 Woree) 275kV line in Far North Queensland, the system normal system strength equations for low North Queensland demands and all Karreya stations out of service conditions have been revised.
A revision to the constraint equations will be implemented at 1400 hrs on Tuesday 20th February 2024.
The new system strength combinations have now published in a limits advice document on AEMO's website. For more information refer to the new limits advice: https://www.aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice
This advice contains all the combinations for Queensland for system normal cases.
Below constraint equations in the Q-NIL set will be modified:
- Q_NIL_STRGTH_KBWF
- Q_NIL_STRGTH_KBWF_I
- Q_NIL_STRGTH_HAUSF
- Q_NIL_STRGTH_HAUSF_I
- Q_NIL_STRGTH_MEWF
- Q_NIL_STRGTH_MEWF_I
AEMO Operations
Cancellation of Actual (LOR2) condition in the VIC region - 13/02/2024
Cancellation of Actual (LOR2) condition in the VIC region - 13/02/2024
The Actual LOR2 Condition in the VIC Region advised in AEMO Electricity Market Notice No.114589 is cancelled at 1614 hrs 13/02/2024.
Manager NEM Real Time Operations
STPASA - Suspect Lack Of Reserve Level 3 (LOR3) in the QLD Region on 01/02/2024
AEMO considers that there are suspect Forecast LOR3 conditions for the QLD region for the following periods:
1. From 0900 hrs to 1000 hrs 01/02/2024.
The maximum load (other than interruptible loads) forecast to be interrupted is 38 MW at 0930 hrs.
2. From 1130 hrs to 1200 hrs 01/02/2024.
The maximum load (other than interruptible loads) forecast to be interrupted is 62 MW at 1130 hrs.
AEMO is currently investigating these LOR3 forecast conditions to confirm whether they are valid.
AEMO Operations
Cancellation of Actual (LOR2) condition in the NSW region - 14/12/2023
Cancellation of Actual (LOR2) condition in the NSW region - 14/12/2023
The Actual LOR2 Condition in the NSW Region advised in AEMO Electricity Market Notice No.112362 is cancelled at 1810 hrs 14/12/2023.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 2 (LOR2) in the NSW region - 14/12/2023
Actual Lack Of Reserve Level 2 (LOR2) in the NSW region - 14/12/2023
An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR2 condition is not forecast in Pre Dispatch
The capacity reserve required is 690 MW
The minimum reserve available is 678 MW
AEMO is seeking an immediate market response.
An insufficient market response may require AEMO to implement a AEMO intervention event.
Manager NEM Real Time Operations
Updated Victorian system normal voltage oscillation limit
AEMO has completed a comprehensive review on voltage oscillation issue in south-west Victoria with consideration of wider asynchronous generators in the area. The voltage oscillation occurs in the south-west region when Heywood interconnector flow is higher than 500 MW from South Australia to Victoria.
The limit will manage the total MW output from Stockyard Hill, Dundonnell and Macarthur wind farms during period when flow on Heywood interconnector higher than 500 MW towards Victoria.
The new constraint equation includes asynchronous generators in south-west Victoria on the left-hand side. This limit is to replace the existing south-west Victoria voltage oscillation limit. Full details on the limits advice are to be published shortly on the AEMO website: https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice
The following changes will be implemented at 1000 hrs on Friday 3rd November 2023
? Constraint equation will be removed from constraint set V-NIL:
V_SHWF_FLT_286
? Constraint equation will be implemented and added to constraint set V-NIL:
V_SH_DD_MAC_FLT_965
For full details on the formulation, the new constraint equation has now been loaded into AEMO's pre-production systems.
For further details on this change please contact terry.liu@aemo.com.au
Terry Liu
AEMO Operations
Update to voltage stability and system strength constraints in North Queensland
Refer to market notice 102074
AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland.
Due to commissioning of new feeder 8905 (H13 Ross - H39 Woree) 275kV line in Far North Queensland, the system normal equations for system strength and voltage stability have been revised.
A revision to the constraint equations will be implemented at 1400 hrs on Thursday 2nd November 2023.
The new system strength combinations have now published in a limits advice document on AEMO's website. For more information refer to the new limits advice: https://www.aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice
This advice contains all the combinations for Queensland for system normal cases.
The constraint equations in the Q-NIL set below will be modified:
? Q_NIL_STRGTH_KBWF
? Q_NIL_STRGTH_KBWF
? Replace Q^NIL_FNQ_MEWF and Q^NIL_FNQ_WRSVC with new equation Q^NIL_FNQ_8905
AEMO Operations
Cancellation of Actual (LOR2) condition in the SA region - 27/10/2023
Cancellation of Actual (LOR2) condition in the SA region - 27/10/2023
The Actual LOR2 Condition in the SA Region advised in AEMO Electricity Market Notice No.110559 is cancelled at 2015 hrs 27/10/2023.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 2 (LOR2) in the SA region - 27/10/2023
Actual Lack Of Reserve Level 2 (LOR2) in the SA region - 27/10/2023
An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the SA region from 1930 hrs.
The Actual LOR2 condition is not forecast in Pre Dispatch
The capacity reserve required is 480 MW
The minimum reserve available is 465 MW
AEMO is seeking an immediate market response.
An insufficient market response may require AEMO to implement a AEMO intervention event.