Market Notices

54474RESERVE NOTICE13/07/2016 01:30:17 PM

Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region - PDPASA - 14 July 2016

AEMO ELECTRICITY MARKET NOTICE

Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region - PDPASA - 14 July 2016

AEMO declares a Forecast LOR1 condition for the SA Region.

From 1730 hrs to 1830 hrs 14 July 2016

The contingency capacity reserve required is 400 MW

The minimum reserve available is 221 MW


Manager NEM Real Time Operations
54472SETTLEMENTS RESIDUE13/07/2016 11:30:15 AM

[EventId:201607131130_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 13 July 2016 11:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1130 hrs on 13 July 2016

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 13 July 2016.

Refer to market notice: 54468

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.

The negative residue constraint NRM_SA1_VIC1 ceased operating at 1130 hrs on 13 July 2016.

This is an AEMO autogenerated Market Notice.
54468SETTLEMENTS RESIDUE13/07/2016 10:30:24 AM

[EventId:201607131030_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 13 July 2016 10:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1030 hrs on 13 July 2016

ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 13 July 2016.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.

The negative residue constraint set NRM_SA1_VIC1 commenced operating from 1030 hrs on 13 July 2016.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
54467SETTLEMENTS RESIDUE13/07/2016 10:00:19 AM

[EventId:201607131000_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 13 July 2016 10:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1000 hrs on 13 July 2016

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 13 July 2016.

Refer to market notice: 54466

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.

The negative residue constraint NRM_SA1_VIC1 ceased operating at 1000 hrs on 13 July 2016.

This is an AEMO autogenerated Market Notice.
54466SETTLEMENTS RESIDUE13/07/2016 09:00:28 AM

[EventId:201607130900_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 13 July 2016 09:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0900 hrs on 13 July 2016

ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 13 July 2016.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.

The negative residue constraint set NRM_SA1_VIC1 commenced operating from 0900 hrs on 13 July 2016.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
54457SETTLEMENTS RESIDUE12/07/2016 07:00:23 PM

[EventId:201607121900_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 12 July 2016 19:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1900 hrs on 12 July 2016

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 12 July 2016.

Refer to market notice: 54455

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.

The negative residue constraint NRM_SA1_VIC1 ceased operating at 1900 hrs on 12 July 2016.

This is an AEMO autogenerated Market Notice.
54455SETTLEMENTS RESIDUE12/07/2016 06:00:29 PM

[EventId:201607121800_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 12 July 2016 18:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1800 hrs on 12 July 2016

ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 12 July 2016.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.

The negative residue constraint set NRM_SA1_VIC1 commenced operating from 1800 hrs on 12 July 2016.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
54452SETTLEMENTS RESIDUE12/07/2016 04:30:19 PM

[EventId:201607121630_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 12 July 2016 16:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1630 hrs on 12 July 2016

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 12 July 2016.

Refer to market notice: 54442

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.

The negative residue constraint NRM_SA1_VIC1 ceased operating at 1630 hrs on 12 July 2016.

This is an AEMO autogenerated Market Notice.
54451RESERVE NOTICE12/07/2016 04:31:49 PM

Update - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region - PDPASA - 13 July 2016

AEMO ELECTRICITY MARKET NOTICE

Update Forecast Lack of Reserve Level 1 (LOR1) in the SA Region - PDPASA - 13 July 2016

See MN - 54449

AEMO declares the Forecast LOR1 condition for the SA Region.

From 1800 hrs to 2100 hrs 13 July 2016

The contingency capacity reserve required is 400 MW

The minimum reserve available is 225 MW

Manager NEM Real Time Operations