58483RESERVE NOTICE04/05/2017 08:20:39 PM

Forecast Lack Of Reserve Level 3 (LOR3) in the Vic Region - STPASA

AEMO ELECTRICITY MARKET NOTICE

Forecast Lack Of Reserve Level 3 (LOR3) in the Vic Region - STPASA

Under the NER Cl 4.8.4(d), AEMO considers that Customer load would be interrupted in order to maintain or restore the security of the power system in Vic Region, for the following period,

AEMO declares a Forecast LOR3 condition for the Vic Region.
From 1730 hrs to 1800 hrs 11/05/2017

The maximum load forecast to be interrupted is 37 MW at 1730 hrs 11/05/2017

AEMO is seeking a market response.

AEMO will determine the latest time at which it would need to intervene through a AEMO intervention event.

Manager NEM Real Time Operations
58467POWER SYSTEM EVENTS03/05/2017 02:25:10 PM

Update - Non-credible contingency event - NSW region - 3 May 2017

AEMO ELECTRICITY MARKET NOTICE

Update - Non-credible contingency event - NSW region - 3 May 2017

Update to Market Notice 58465.

At 1349 hrs the Capital Windfarm 330kV A Bus was returned to service.

The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

AEMO will not reclassify this event as a credible contingency event.


Manager NEM Real Time Operations
58465POWER SYSTEM EVENTS03/05/2017 01:21:13 PM

Non-credible contingency event - NSW region - 3 May 2017

AEMO ELECTRICITY MARKET NOTICE

Non-credible contingency event - NSW region - 3 May 2017

At 1241 hrs the Capital Windfarm 330kV A Bus tripped.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations

58398POWER SYSTEM EVENTS18/04/2017 05:45:58 PM

Cancellation - Non-credible contingency event - Vic region - 18/04/17

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Non-credible contingency event - Vic region - 18/04/17

Update to AEMO Electricity Market Notice 58395

AEMO has received further information regarding this event. The protection that tripped the Moorabool - Mortlake 500 kV Line at the Moorabool end only operated as per design. Hence, AEMO no longer considers this to be a non-credible contingency event.

The Moorabool - Mortlake 500 kV Line remains out of service. Refer to AEMO Network Outage Scheduler (NOS) for further details.


Manager NEM Real Time Operations
58395POWER SYSTEM EVENTS18/04/2017 12:43:07 PM

Non-credible contingency event - Vic region - 18/04/17

AEMO ELECTRICITY MARKET NOTICE

Non-credible contingency event - Vic region - 18/04/17

Update to AEMO Electricity Market Notice 58394

At 1107 hrs the Moorabool - Mortlake 500 kV Line tripped at the Moorabool end only.
At 1110 hrs the Moorabool - Mortlake 500 kV Line was manually de-energised by opening at the Mortlake end.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.

Manager NEM Real Time Operations
58391POWER SYSTEM EVENTS15/04/2017 08:10:36 PM

Update - Non-credible contingency event - NSW Region - 15 Apr 2017

AEMO ELECTRICITY MARKET NOTICE


Update - Non-credible contingency event - NSW Region - 15 Apr 2017

Refer Market Notice 58390

At 1644 hrs the Broken Hill No 2 220/22 kV Transformer and No 2 Section 22 kV Bus tripped. This equipment has been returned to service.

The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

AEMO will not reclassify this event as a credible contingency event.


Manager NEM Real Time Operations
58390POWER SYSTEM EVENTS15/04/2017 05:59:50 PM

Non-credible contingency event - NSW Region - 15 Apr 2017

AEMO ELECTRICITY MARKET NOTICE

Non-credible contingency event - NSW Region - 15 Apr 2017

At 1644 hrs the Broken Hill No 2 220/22 kV Transformer and No 2 Section 22 kV Bus tripped.

(Also subsequent loss of Broken Hill Solar Farm)

AEMO did not instruct load shedding.

AEMO has been advised of disconnection of 14 MW of bulk electrical load.


The cause of this non credible contingency event is not known at this stage and is still under investigation.

The Bus and Transformer are still out of service


Manager NEM Real Time Operations
58335POWER SYSTEM EVENTS04/04/2017 03:35:48 PM

Update- Non-credible contingency event - Qld Region - 04/04/2017

AEMO ELECTRICITY MARKET NOTICE


Update- Non-credible contingency event - Qld Region - 04/04/2017

Refer Market Notice 58331

At 0307 hrs trip of the Murarrie No.1 110 kV Bus coincident with trip of 7270 Murarrie - Lytton Bulk Supply 110 kV Line.

The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

AEMO will not reclassify this event as a credible contingency event.


Manager NEM Real Time Operations

58331POWER SYSTEM EVENTS04/04/2017 04:50:37 AM

Non-credible contingency event - Qld Region - 04/04/2017

AEMO ELECTRICITY MARKET NOTICE


Non-credible contingency event - Qld Region - 04/04/2017

At 0307 hrs trip of the Murarrie No.1 110 kV Bus coincident with trip of 7270 Murarrie - Lytton Bulk Supply 110 kV Line.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations