Cancellation of Actual (LOR2) condition in the South Australia region - 03/03/2017
Cancellation of Actual (LOR2) condition in the South Australia region - 03/03/2017
The Actual LOR2 Condition in the South Australia Region advised in AEMO Electricity Market Notice No. 57818 & 57819 is cancelled at 1730 hrs 03/03/2017
An Actual LOR1 condition exists and is forecast to exist until 1830 hrs.
The contingency capacity reserve required is 450 MW
The minimum reserve available is 281 MW
AEMO is seeking a market response.
Manager NEM Real Time Operations
Update Actual Lack Of Reserve Level 2 (LOR2) in the SA Region - 03/03/17
Update Actual Lack Of Reserve Level 2 (LOR2) in the SA Region - 03/03/17
An Actual LOR2 condition has been declared for the SA region from 1503 hrs.
The Actual LOR2 condition is forecast to exist until 1800 hrs.
The contingency capacity reserve required is 250 MW
The minimum reserve available is 210 MW
AEMO is seeking a market response.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 2 (LOR2) in the SA Region - 03/03/17
Actual Lack Of Reserve Level 2 (LOR2) in the SA Region - 03/03/17
An Actual LOR2 condition has been declared for the SA region from 1503 hrs.
The Actual LOR2 condition is forecast to exist until 1700 hrs.
The contingency capacity reserve required is 250 MW
The minimum reserve available is 160 MW
AEMO is seeking a market response.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the South Australia region - 01/03/2017
Cancellation of Actual (LOR1) condition in the South Australia region - 01/03/2017
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No. 57769 is cancelled at 1825 hrs 01/03/2017
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region.- 01/03/17
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region.- 01/03/17
An Actual LOR1 condition has been declared for the South Australia Region from 1530 hrs.
The Actual LOR1 condition is forecast to exist until 1830 hrs.
The contingency capacity reserve required is 570 MW
The minimum reserve available is 456 MW
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the South Australia region.
Cancellation of Actual (LOR1) condition in the South Australia region.
Refer to AEMO Electricity Market Notice No. 57752
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No. 57752 is cancelled at 1900 hrs Tuesday, 28 February 2017.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region.- 28/02/17
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region.- 28/02/17
An Actual LOR1 condition has been declared for the South Australia Region from 1530 hrs.
The Actual LOR1 condition is forecast to exist until 1900 hrs.
The contingency capacity reserve required is 570 MW
The minimum reserve available is 412 MW
Manager NEM Real Time Operations
Cancellation - Actual LOR2 South Australia Region - Monday, 27 February 2017
Cancellation - Actual LOR2 South Australia Region - Monday, 27 February 2017
Refer AEMO Electricity Market Notices 57709 57714 and 57715
The Actual LOR2 condition has been cancelled for the South Australia region from 0609 hrs. The APD - Heywood - Mortlake No.2 500k V Line in Victoria has been returned to service.
Manager NEM Real Time Operations
Actual LOR2 South Australia Region - 23/1/2017
Actual LOR2 South Australia Region - Mon 27 Feb 2017
Refer AEMO Electricity Market Notice 57709
An actual LOR2 condition has been declared for the South Australia region from 0445 hrs due to an unplanned outage of the APD - Heywood - Mortlake No.2 500k V Line in Victoria
If a credible contingency event occurs in this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.
There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.
Manager NEM Real Time Operations