62214RESERVE NOTICE10/04/2018 05:55:58 PM

Correction - Actual Lack Of Reserve Level 1 (LOR1) in the SA Region.- 10/04/2018

AEMO ELECTRICITY MARKET NOTICE

Correction - Actual Lack Of Reserve Level 1 (LOR1) in the SA Region.- 10/04/2018

Refer AEMO Electricity Market Notice 61181

An Actual LOR1 condition has been declared for the SA Region from 1735 hrs.

The Actual LOR1 condition is forecast to exist until 2000 hrs

The contingency capacity reserve required is 600 MW

The minimum reserve available is 376 MW


Manager NEM Real Time Operations
62213RESERVE NOTICE10/04/2018 05:48:29 PM

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region.- 10/04/2018

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region.- 10/04/2018

Refer AEMO Electricity Market Notice 61181

An Actual LOR1 condition has been declared for the SA Region from 1735 hrs.

The Actual LOR1 condition is forecast to exist until 1700 hrs

The contingency capacity reserve required is 600 MW

The minimum reserve available is 376 MW


Manager NEM Real Time Operations
62120CONSTRAINTS04/04/2018 03:02:22 PM

Updated generator combinations for SA system strength

AEMO MARKET NOTICE

Updated generator combinations for SA system strength

AEMO is continuing to investigate system strength requirements in South Australia.

Through this work, AEMO has identified one additional generator combination which meet minimum system strength requirements in South Australia.

This new combination is:
LOW_5B - 2 x Torrens Island A units + 3 x Torrens Island B units

Note: LOW_5 (3 x Torrens Island A units + 2 x Torrens Island B units) has been relabelled as LOW_5A

For more information refer to the updated limits advice:
https://www.aemo.com.au/-/media/Files/Electricity/NEM/Security_and_Reliability/Congestion-Information/2018/Transfer-Limit-Advice---South-Australian-System-Strength.pdf

A further update to this advice is planned by early May 2018.

Ben Blake
AEMO Operations
61662CONSTRAINTS06/03/2018 04:12:38 PM

Updated generator combinations for SA system strength

AEMO MARKET NOTICE

Updated generator combinations for SA system strength

AEMO is continuing to investigate system strength requirements in South Australia.

Through this work, AEMO has identified three additional generator combinations which meet minimum system strength requirements in South Australia.

These new combinations are:
LOW_14 - 2 x Torrens Island A units + 1 x Torrens Island B units + 1 x Pelican Point GT/ST units
LOW_15 - 1 x Torrens Island A units + 1 x Torrens Island B units + 1 x Pelican Point GT/ST units + Quarantine 5 / 3 x Dry Creek units
LOW_16 - 3 x Torrens Island A units + 1 x Pelican Point GT/ST units + Osborne GT/ST

Note: LOW_14 replaces LOW_12.

For more information refer to the updated limits advice:
https://www.aemo.com.au/-/media/Files/Electricity/NEM/Security_and_Reliability/Congestion-Information/2017/Transfer-Limit-Advice---South-Australian-System-Strength.pdf

A further update to this advice is planned by late April/May 2018.

Ben Blake
AEMO Operations
61272RESERVE NOTICE14/02/2018 07:32:45 PM

Cancellation of Actual (LOR1) condition in the Qld region - 14/02/2018

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the Qld region - 14/02/2018

The Actual LOR1 Condition in the Qld Region advised in AEMO Electricity Market Notice No.61252 is cancelled at 1930 hrs 14/02/2018.


Manager NEM Real Time Operations
61252RESERVE NOTICE14/02/2018 04:07:39 PM

Actual Lack Of Reserve Level 1 (LOR1) in the QLD Region.- 14/02/2018

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD Region.- 14/02/2018

Refer AEMO Electricity Market Notice 61251

An Actual LOR1 condition has been declared for the QLD Region from 1600 hrs.

The Actual LOR1 condition is forecast to exist until 1700 hrs

The contingency capacity reserve required is 1260 MW

The minimum reserve available is 1064 MW


Manager NEM Real Time Operations
61151RESERVE NOTICE07/02/2018 08:03:53 PM

Cancellation of Actual (LOR1) condition in the SA region - 07/02/2018

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the SA region - 07/02/2018

The Actual LOR1 Condition in the SA Region advised in AEMO Electricity Market Notice No.61147 is cancelled at 2000 hrs 07/02/2018.


Manager NEM Real Time Operations
61149RESERVE NOTICE07/02/2018 07:04:33 PM

Cancellation of Actual (LOR1) condition in the Vic region - 07/02/2018

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the Vic region - 07/02/2018

The Actual LOR1 Condition in the Vic Region advised in AEMO Electricity Market Notice No.61146 is cancelled at 1900 hrs 07/02/2018.


Manager NEM Real Time Operations
61147RESERVE NOTICE07/02/2018 05:16:42 PM

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region.- 7/02/2018

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region.- 7/02/2018

An Actual LOR1 condition has been declared for the SA Region from 1700 hrs.

The Actual LOR1 condition is forecast to exist until 1730 hrs
The contingency capacity reserve required is 600 MW
The minimum reserve available is 580 MW