55621ADMINISTERED PRICE CAP10/11/2016 03:55:26 AM

[EventId:94] AP STARTED for market ancillary services in SA at 10 November 2016 04:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0355 hrs on 10 November 2016

ADMINISTERED PRICE PERIOD DECLARED in SA region.

AEMO has determined that the rolling sum of the uncapped market ancillary Lower Reg, Raise Reg services(s) prices for the SA region over the previous 2016 dispatch intervals has exceeded 6 times the cumulative price threshold (CPT) of $210,100.00.

In accordance with Clause 3.14 of the National Electricity Rules, AEMO has determined that an administered price period will commence at the dispatch interval starting 0400 hrs on 10 Nov 2016 and will continue through to the end of that trading day.

An administered price cap (APC) of 300 $/MWh will apply to all dispatch intervals during this administered price period. This APC will apply to all market ancillary service prices in the SA region.

An administered floor price (AFP) of 0 $/MWh AFP will apply to all market ancillary service prices.

AEMO will continue to monitor the rolling sum of the uncapped market ancillary service prices and issue further market notices as required.


This is an AEMO autogenerated Market Notice.
55620ADMINISTERED PRICE CAP10/11/2016 03:55:07 AM

[EventId:93] AP ENDED for market ancillary services in SA at 10 November 2016 04:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0355 hrs on 10 November 2016

ADMINISTERED PRICE PERIOD ENDS in SA region.

In accordance with Clause 3.14.2(b) of the National Electricity Rules, AEMO is notifying market particpants that the administered price period declared for the SA region in market notice 55612 will end at 0400 hrs on 10 November 2016.


This is an AEMO autogenerated Market Notice.
55612ADMINISTERED PRICE CAP09/11/2016 06:30:10 PM

[EventId:93] AP STARTED for market ancillary services in SA at 09 November 2016 18:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1830 hrs on 9 November 2016

ADMINISTERED PRICE PERIOD DECLARED in SA region.

AEMO has determined that the rolling sum of the uncapped market ancillary Raise Reg services(s) prices for the SA region over the previous 2016 dispatch intervals has exceeded 6 times the cumulative price threshold (CPT) of $210,100.00.

In accordance with Clause 3.14 of the National Electricity Rules, AEMO has determined that an administered price period will commence at the dispatch interval starting 1835 hrs on 9 Nov 2016 and will continue through to the end of that trading day.

An administered price cap (APC) of 300 $/MWh will apply to all dispatch intervals during this administered price period. This APC will apply to all market ancillary service prices in the SA region.

An administered floor price (AFP) of 0 $/MWh AFP will apply to all market ancillary service prices.

AEMO will continue to monitor the rolling sum of the uncapped market ancillary service prices and issue further market notices as required.


This is an AEMO autogenerated Market Notice.
55573RESERVE NOTICE07/11/2016 01:22:04 PM

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region - 8 to 9 Nov 2016

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Market Notice 55368

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region - from 0600 hrs on 08/11/2016 to 1600 hrs on 09/11/2016.

AEMO declares Forecast LOR2 conditions for the South Australia region during the planned outages in Victoria detailed below:
[1] Heywood No.2 500 kV busbar from 0600 hrs on 08/11/2016 to 1600 hrs on 09/11/2016.
[2] Heywood to Mortlake 500 kV transmission line from 0600 hrs to 1600 hrs daily on 08/11/2016 and 09/11/2016.

On the occurrence of a credible contingency during these planned outage, South Australia region could separate from the rest of the NEM and is likely to result in interruptions to power supplies in South Australia.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but following the next credible contingency it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing interruptions to power supplies in South Australia.

Operations Planning
Harmohan Singh
55389RESERVE NOTICE14/10/2016 02:51:42 PM

Forecast Lack of Reserve Level 2 (LOR2) in South Australia from 18 Oct 2016 to 22 Oct 2016

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Market Notices: 55353 and 54934.

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region starting from 0700hrs 18/10/2016 to 1700hrs 22/10/2016.

AEMO declares Forecast LOR2 conditions in the South Australia region for the above period. During this period, an outage is scheduled for Heywood to South East No.2 275 kV transmission line between Victoria and South Australia.

On the occurrence of a credible contingency during this outage, South Australia region could separate from the rest of the NEM and is likely to result in interruptions to power supply in South Australia.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but following the next credible contingency it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing interruptions to power supplies in South Australia.

Kin Onn Wong
AEMO Operations
55345MARKET INTERVENTION11/10/2016 07:31:20 PM

Cancellation - Direction - South Australia region 11/10/16

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Direction - South Australia region 11/10/16

Refer AEMO Electricity Market Notice 55339

The direction to a participant in the South Australia region was cancelled at 1906 hrs 11/10/16

Manager NEM Real Time Operations
55339MARKET INTERVENTION11/10/2016 05:05:04 PM

Direction - South Australia region 11/10/16

AEMO ELECTRICITY MARKET NOTICE.

Direction - South Australia region 11/10/16

In accordance with clause 4.8.9 of the National Electricity Rules AEMO has issued a direction to a participant in the South Australia region.

The direction was necessary to maintain the power system in a secure operating state.

The direction was issued at 1616 hrs 11/10/16 and is expected to stay in place until 0700 hrs 12/10/16.

Manager NEM Real Time Operations
55337MARKET INTERVENTION11/10/2016 04:12:03 PM

Forecast Intervention Event - South Australia region 11 and 12 October 2016

AEMO ELECTRICITY MARKET NOTICE

Forecast Intervention Event - South Australia region 11 and 12 October 2016

Predispatch is indicating a power system security violation in the South Australia region between 2100 hrs 11/10/16 and 1400hrs 12/10/16.

AEMO is seeking a market response from synchronous generating units in the South Australia region with an installed capacity of greater than 100 MW.

AEMO will determine the latest time at which it would need to intervene through a AEMO intervention event.

Manager NEM Real Time Operations
55334MARKET INTERVENTION11/10/2016 01:05:05 PM

Forecast Intervention Event - South Australia region 12/10/16

AEMO ELECTRICITY MARKET NOTICE

Forecast Intervention Event - South Australia region 12/10/16

Predispatch is indicating a power system security violation in the South Australia region between 0000 hrs and 1400hrs Wednesday 12 October 2016.

AEMO is seeking a market response from synchronous generating units in the South Australia region with an installed capacity of greater than 100 MW.

AEMO will determine the latest time at which it would need to intervene through a AEMO intervention event.

Manager NEM Real Time Operations