Market Notices

54672INTER-REGIONAL TRANSFER08/08/2016 10:14:53 AM

Inter-regional transfer limit variation VIC - 8/08/16

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation VIC - 8/08/16

A planned outage of Moorabool - Sydenham No. 1 500 kV Line and Sydenham - South Morang No. 1 500 kV Line in the VIC region required an update of the outage constraints.

The following constraint set was invoked at 10:00 hrs.

CA_SPS_46BA5824

This constraint set contains the following interconnectors on the LHS

T-V-MNSP1
V-S-MNSP1
VIC1-NSW1
V-SA

Refer to AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
54671INTER-REGIONAL TRANSFER08/08/2016 08:11:57 AM

Inter-Regional Transfer Limit Variation - NSW Region - Directlink - 8/08/16

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer Limit Variation - NSW Region - Directlink - 8/08/16

For the planned outage of DC3 leg of Directlink, with DC1 and DC2 legs already out of service, the following Constrant Set has been invoked.

Constraint Set N-X_MBTE_3 invoked from 08:10 hrs.

The outage constraint set contains the following interconnector on the left hand side.

N-Q-MNSP1

See AEMO Network Outage Scheduler (NOS) for details and return to service times.

Manager NEM Real Time Operations
54669INTER-REGIONAL TRANSFER06/08/2016 07:17:25 PM

Inter-regional transfer limit variation SA - 06 August 2016

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation SA - 06 August 2016

A short notice outage of North West Bend 132 kV 6024 Circuit Breaker in the SA region commenced at 1830 hrs.

The following constraints are invoked for this outage

S-NW_CB6024

The outage constraints contain the following interconnectors on the LHS

V-S-MNSP1

Refer to AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
54667INTER-REGIONAL TRANSFER05/08/2016 05:08:42 PM

Inter-regional transfer limit variation QLD - 05 August 2016

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation QLD - 05 August 2016

The joining of the 275 kV lines in the QLD region, 809 South Pine - Rocklea and 838 South Pine - Blackwall have been re-energised and bypassed South Pine at 1700 hrs.

The outage is estimated to be completed in January 2017.

The following constraints are invoked for this outage

Q-NIL_TR_BYPASS_SP

The following constraints have been revoked for this outage

Q-X_BKSP_RLSP
Q-RLSP_809
Q-BKSP

The outage constraints contain the following interconnectors on the LHS

N-Q-MNSP1
NSW1-QLD1

Refer to AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
54666INTER-REGIONAL TRANSFER05/08/2016 10:36:34 AM

Update Inter-Regional Transfer Limit Variation - Heywood Interconnector

AEMO ELECTRICITY MARKET NOTICE

Update Inter-Regional Transfer Limit Variation - Heywood Interconnector

Refer to Market Notice 54162

On advice from the Inter-Network test group and the AEMO Test Coordinator, the Black Range series capacitors are expected to be available for full service at 1200 hrs on 5 August 2016. On the same day, AEMO plans to commence Inter-Network tests at the stage two hold point two. For details, please refer the Inter-Network test program located on AEMO website (http://www.aemo.com.au/Stakeholder-Consultation/Consultations/Heywood-interconnector-upgrade---program-for-inter-network-tests)

The following transfer limits shall be applicable at this hold point:

Vic to SA via HYTS IC <= 600 MW
Vic to SA via HYTS plus Murraylink <= 820 MW

SA to Vic via HYTS IC <= 500 MW
SA to Vic via HYTS plus Murraylink <= 650 MW

In addition to the above hold point transfer limits, constraints applicable to normal service of the series capacitors will apply.
The above limits supersede the limits specified for this hold point in the Inter-Network test program.

All revisions to inter-regional transfer limits at various hold points of the Inter-Network tests will be advised in advance.

Ben Blake
AEMO Operations
54665INTER-REGIONAL TRANSFER04/08/2016 08:01:25 PM

Cancellation - Inter-Regional Transfer Limit Variation - Terranora Interconnector - Thursday, 4 August 2016

AEMO MARKET NOTICE

Cancellation - Inter-Regional Transfer Limit Variation - Terranora Interconnector - Thursday, 4 August 2016

Refer AEMO Electricity Market Notice 54664

AEMO has applied a constraint to the Terranora Interconnector to manage oscillations due to constraint action for the outage of Armidale - Coffs Harbour 96C 132 kV transmission line.

Constraint Set #N-Q-MNSP1_E revoked from 2000 hrs

This constraint is set to 100 MW in the direction Queensland to New South Wales and is expected to remain invoked until 2000 hrs

This constraint set contains an equation with the following interconnector on the LHS.

N-Q-MNSP1


Manager NEM Real Time Operations



54664INTER-REGIONAL TRANSFER04/08/2016 07:35:53 PM

Inter-Regional Transfer Limit Variation - Terranora Interconnector - Thursday, 4 August 2016

AEMO MARKET NOTICE

Inter-Regional Transfer Limit Variation - Terranora Interconnector - Thursday, 4 August 2016

AEMO has applied a constraint to the Terranora Interconnector to manage oscillations due to constraint action for the outage of Armidale - Coffs Harbour 96C 132 kV transmission line.

Constraint Set #N-Q-MNSP1_E invoked from 1915 hrs

This constraint is set to 100 MW in the direction Queensland to New South Wales and is expected to remain invoked until 2000 hrs

This constraint set contains an equation with the following interconnector on the LHS.

N-Q-MNSP1


Manager NEM Real Time Operations


54663INTER-REGIONAL TRANSFER04/08/2016 12:52:56 AM

Inter regional transfer limit variation Armidale - Coffs Habour (96C) 132kV Line (NSW)

AEMO ELECTRICITY MARKET NOTICE

Inter regional transfer limit variation Armidale - Coffs Habour (96C) 132kV Line (NSW)
Unplanned outage of the Armidale - Coffs Habour (96C) 132kV Line.
The following constraint set was invoked at 0045 hrs 4/8/16 until futher notice.
N-ARCH_96C
The constraint set contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
NSW1-QLD1
Manager NEM Real Time Operations
54647INTER-REGIONAL TRANSFER01/08/2016 04:59:01 PM

Inter regional transfer limit variation - Basslink in the direction Tasmania to Victoria

AEMO ELECTRICITY MARKET NOTICE
Refer Market notice No 54641
Inter regional transfer limit variation - Basslink in the direction Tasmania to Victoria
The following constraint set was revoked at 1700 hrs 1/8/16
I-TV_500

The constraints contain the following interconnectors on the LHS
T-V-MNSP1

Manager NEM Real Time Operations
X