Inter-regional transfer limit variation VIC - 8/08/16
Inter-regional transfer limit variation VIC - 8/08/16
A planned outage of Moorabool - Sydenham No. 1 500 kV Line and Sydenham - South Morang No. 1 500 kV Line in the VIC region required an update of the outage constraints.
The following constraint set was invoked at 10:00 hrs.
CA_SPS_46BA5824
This constraint set contains the following interconnectors on the LHS
T-V-MNSP1
V-S-MNSP1
VIC1-NSW1
V-SA
Refer to AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
Inter-Regional Transfer Limit Variation - NSW Region - Directlink - 8/08/16
Inter-Regional Transfer Limit Variation - NSW Region - Directlink - 8/08/16
For the planned outage of DC3 leg of Directlink, with DC1 and DC2 legs already out of service, the following Constrant Set has been invoked.
Constraint Set N-X_MBTE_3 invoked from 08:10 hrs.
The outage constraint set contains the following interconnector on the left hand side.
N-Q-MNSP1
See AEMO Network Outage Scheduler (NOS) for details and return to service times.
Manager NEM Real Time Operations
Inter-regional transfer limit variation SA - 06 August 2016
Inter-regional transfer limit variation SA - 06 August 2016
A short notice outage of North West Bend 132 kV 6024 Circuit Breaker in the SA region commenced at 1830 hrs.
The following constraints are invoked for this outage
S-NW_CB6024
The outage constraints contain the following interconnectors on the LHS
V-S-MNSP1
Refer to AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
Inter-regional transfer limit variation QLD - 05 August 2016
Inter-regional transfer limit variation QLD - 05 August 2016
The joining of the 275 kV lines in the QLD region, 809 South Pine - Rocklea and 838 South Pine - Blackwall have been re-energised and bypassed South Pine at 1700 hrs.
The outage is estimated to be completed in January 2017.
The following constraints are invoked for this outage
Q-NIL_TR_BYPASS_SP
The following constraints have been revoked for this outage
Q-X_BKSP_RLSP
Q-RLSP_809
Q-BKSP
The outage constraints contain the following interconnectors on the LHS
N-Q-MNSP1
NSW1-QLD1
Refer to AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
Update Inter-Regional Transfer Limit Variation - Heywood Interconnector
Update Inter-Regional Transfer Limit Variation - Heywood Interconnector
Refer to Market Notice 54162
On advice from the Inter-Network test group and the AEMO Test Coordinator, the Black Range series capacitors are expected to be available for full service at 1200 hrs on 5 August 2016. On the same day, AEMO plans to commence Inter-Network tests at the stage two hold point two. For details, please refer the Inter-Network test program located on AEMO website (http://www.aemo.com.au/Stakeholder-Consultation/Consultations/Heywood-interconnector-upgrade---program-for-inter-network-tests)
The following transfer limits shall be applicable at this hold point:
Vic to SA via HYTS IC <= 600 MW
Vic to SA via HYTS plus Murraylink <= 820 MW
SA to Vic via HYTS IC <= 500 MW
SA to Vic via HYTS plus Murraylink <= 650 MW
In addition to the above hold point transfer limits, constraints applicable to normal service of the series capacitors will apply.
The above limits supersede the limits specified for this hold point in the Inter-Network test program.
All revisions to inter-regional transfer limits at various hold points of the Inter-Network tests will be advised in advance.
Ben Blake
AEMO Operations
Cancellation - Inter-Regional Transfer Limit Variation - Terranora Interconnector - Thursday, 4 August 2016
Cancellation - Inter-Regional Transfer Limit Variation - Terranora Interconnector - Thursday, 4 August 2016
Refer AEMO Electricity Market Notice 54664
AEMO has applied a constraint to the Terranora Interconnector to manage oscillations due to constraint action for the outage of Armidale - Coffs Harbour 96C 132 kV transmission line.
Constraint Set #N-Q-MNSP1_E revoked from 2000 hrs
This constraint is set to 100 MW in the direction Queensland to New South Wales and is expected to remain invoked until 2000 hrs
This constraint set contains an equation with the following interconnector on the LHS.
N-Q-MNSP1
Manager NEM Real Time Operations
Inter-Regional Transfer Limit Variation - Terranora Interconnector - Thursday, 4 August 2016
Inter-Regional Transfer Limit Variation - Terranora Interconnector - Thursday, 4 August 2016
AEMO has applied a constraint to the Terranora Interconnector to manage oscillations due to constraint action for the outage of Armidale - Coffs Harbour 96C 132 kV transmission line.
Constraint Set #N-Q-MNSP1_E invoked from 1915 hrs
This constraint is set to 100 MW in the direction Queensland to New South Wales and is expected to remain invoked until 2000 hrs
This constraint set contains an equation with the following interconnector on the LHS.
N-Q-MNSP1
Manager NEM Real Time Operations
Inter regional transfer limit variation Armidale - Coffs Habour (96C) 132kV Line (NSW)
Inter regional transfer limit variation Armidale - Coffs Habour (96C) 132kV Line (NSW)
Unplanned outage of the Armidale - Coffs Habour (96C) 132kV Line.
The following constraint set was invoked at 0045 hrs 4/8/16 until futher notice.
N-ARCH_96C
The constraint set contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
NSW1-QLD1
Manager NEM Real Time Operations
Inter regional transfer limit variation - Basslink in the direction Tasmania to Victoria
Refer Market notice No 54641
Inter regional transfer limit variation - Basslink in the direction Tasmania to Victoria
The following constraint set was revoked at 1700 hrs 1/8/16
I-TV_500
The constraints contain the following interconnectors on the LHS
T-V-MNSP1
Manager NEM Real Time Operations