57744RESERVE NOTICE03/03/2017 12:45:41 PM

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region - 04 and 05 March 2017

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Market Notices 57667 and 57668.

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region - 04 and 05 March 2017.

AEMO declares Forecast LOR2 conditions in the South Australia region during the planned outage of Moorabool - Mortlake No.2 500 kV line in Victoria region for the following periods:


From 0600 hrs on 04/03/2017 to 1700 hrs on 04/03/2017
From 0600 hrs on 05/03/2017 to 1700 hrs on 05/03/2017


On the occurrence of a credible contingency during these planned outage, South Australia region could separate from the rest of the NEM and is likely to result in interruptions to power supplies in South Australia.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but following the next credible contingency it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing interruptions to power supplies in South Australia.

AEMO Operations
Bhishma Chhetri
57669RESERVE NOTICE24/02/2017 02:38:58 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia Region on 01/03/2017


AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 57665 is cancelled at 1400 hrs 24/02/2017.

No LOR conditions are currently forecast in the STPASA period.

Harmohan Singh
AEMO Operations
57665RESERVE NOTICE24/02/2017 12:53:05 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region on 01/03/2017

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 57660 has been updated at 1200 hrs 24/02/2017 to the following

From 1630 hrs to 1700 hrs 01/03/2017.
The contingency capacity reserve required is 200 MW.
The minimum reserve available is 191 MW.

AEMO is seeking a market response.

AEMO will determine the latest time at which it would need to intervene through a AEMO intervention event.

Harmohan Singh
AEMO Operations
57660RESERVE NOTICE23/02/2017 08:43:27 PM

Forecast Lack Of Reserve Level 2 (LOR2) in the SA region - STPASA - 01/03/2017

AEMO ELECTRICITY MARKET NOTICE

Forecast Lack Of Reserve Level 2 (LOR2) in the SA region - STPASA - 01/03/2017

AEMO declares a Forecast LOR2 condition for the SA region.
From 1530 hrs to 1700 hrs 01/03/2017
The contingency capacity reserve required is 200 MW
The minimum reserve available is 128 MW
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through a AEMO intervention event.


Manager NEM Real Time Operations





57413RESERVE NOTICE11/02/2017 12:19:58 PM

Update - FORECAST LACK OF RESERVE LEVEL 2 (LOR2) in the New South Wales region- PD PASA.

AEMO ELECTRICITY MARKET NOTICE


Update - FORECAST LACK OF RESERVE LEVEL 2 (LOR2) in the New South Wales region- PD PASA.

Refer to AEMO Electricity Market Notice 57354, 57407


AEMO declares forecast LOR2 conditions for the NSW Region for the following period.

Saturday 11th February 2017 from 1500hrs to 1830 hrs

The minimum reserve available is 322 MW.

This calculation is based on a LOR2 trigger level of 670 MW.

AEMO is seeking a market response.

AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
57407RESERVE NOTICE10/02/2017 08:25:29 PM

Update - FORECAST LACK OF RESERVE LEVEL 2 (LOR2) in the New South Wales region- PD PASA.

AEMO ELECTRICITY MARKET NOTICE


Update - FORECAST LACK OF RESERVE LEVEL 2 (LOR2) in the New South Wales region- PD PASA.

Refer to AEMO Electricity Market Notice 57354


AEMO declares forecast LOR2 conditions for the NSW Region for the following period.

Saturday 11th February 2017 from 1500hrs to 1600 hrs

The minimum reserve available is 373 MW.

This calculation is based on a LOR2 trigger level of 700 MW.

AEMO is seeking a market response.

AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
57399MARKET INTERVENTION10/02/2017 06:12:40 PM

Cancellation - AEMO Electricity Market Direction - NSW Region

AEMO ELECTRICITY MARKET NOTICE.

Cancellation - AEMO Electricity Market Direction - NSW Region

Refer AEMO Electricity Market Notice 57397

Direction cancelled at 1801 hrs Friday, 10 February 2017


Manager NEM Real Time Operations
57397MARKET INTERVENTION10/02/2017 05:43:05 PM

AEMO Electricity Market Direction - NSW Region

AEMO ELECTRICITY MARKET NOTICE.

In accordance with Section 116 National Electricity Law and clause 4.8.9 of the National Electricity Rules AEMO has issued a direction to a participant in the NSW region.

The direction was necessary to maintain the power system in a secure operating state.

The direction was issued at 1658 hrs 10/02/17 and is expected to stay in place until 1800 hrs 10/02/17.

Manager NEM Real Time Operations
57360RESERVE NOTICE10/02/2017 01:16:07 PM

Update - FORECAST LACK OF RESERVE LEVEL 2 (LOR2) in the New South Wales region- PD PASA.

AEMO ELECTRICITY MARKET NOTICE


Update - FORECAST LACK OF RESERVE LEVEL 2 (LOR2) in the New South Wales region- PD PASA. 10/02/2017

Refer to AEMO Electricity Market Notice 57315, 57338, 57356


AEMO declares forecast LOR2 conditions for the NSW Region for the following period.

Friday 10th February 2017 from 1430hrs to 1600 hrs

The minimum reserve available is 42 MW.

Friday 10th February 2017 from 1700 hrs to 1830 hrs

The minimum reserve available is 94 MW.


This calculation is based on a LOR2 trigger level of 675 MW.

AEMO is seeking a market response.

AEMO has determined the latest time at which it would need to intervene through an AEMO intervention event as 1430 hrs 10/02/2017.