55078SETTLEMENTS RESIDUE30/09/2016 11:05:15 PM

[EventId:201609302305_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 30 September 2016 23:05

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2305 hrs on 30 September 2016

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 30 September 2016.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.

The negative residue constraint set NRM_VIC1_SA1 commenced operating from 2305 hrs on 30 September 2016.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
55072MARKET SUSPENSION30/09/2016 06:34:39 PM

AEMO Operational Strategy for Generation Dispatch During the SA Market Suspension - 30 Sept 2016

AEMO Operational Strategy for Generation Dispatch During the SA Market Suspension -- 30 Sept 2016

AEMO has published the operational strategy for generation dispatch during the SA Market Suspension.

The document can be viewed on AEMO's website using the following URL ;

http://www.aemo.com.au/Media-Centre/Operational-Strategy-for-generation-dispatch-during-South-Australian-market-suspension

Manager NEM Real Time Operations
55071MARKET SUSPENSION30/09/2016 04:26:33 PM

Review of spot prices in other NEM regions that have had actual flow towards South Australia

For the duration of the current market suspension in South Australia, AEMO continues to review prices in other regions as required by the National Electricity Rules.

Spot prices in other NEM regions that have had actual flow towards South Australia must be capped in accordance with clause 3.14.5(m).

AEMO has completed the review for suspended periods on 29/09/2016 and outlined the results below:

Dispatch Interval Region Original RRP Revised RRP
29/09/2016 04:15 VIC1 22.07528 19.86357
29/09/2016 04:20 VIC1 22.55528 19.8593
29/09/2016 04:25 VIC1 22.06972 19.85721
29/09/2016 04:30 VIC1 25.01016 19.8642
29/09/2016 04:40 VIC1 25.78393 25.55377
29/09/2016 04:50 VIC1 25.80266 25.54782
29/09/2016 04:55 VIC1 26.02693 25.5563
29/09/2016 08:50 VIC1 85.01 74.74211
29/09/2016 09:05 VIC1 173.60567 69.92559
29/09/2016 14:35 VIC1 42.77446 39.06352
29/09/2016 14:45 VIC1 46.07409 39.07527
29/09/2016 15:00 VIC1 42.99797 39.0938
29/09/2016 18:30 VIC1 85.01 84.28485
29/09/2016 22:10 VIC1 90.22211 63.99291
29/09/2016 22:15 VIC1 89.98661 63.97584
29/09/2016 22:35 VIC1 56.53871 45.70182
29/09/2016 22:40 VIC1 54.23015 45.67795
29/09/2016 22:45 VIC1 52.3472 45.67681
29/09/2016 22:50 VIC1 48.2758 45.64702
29/09/2016 22:55 VIC1 46.33742 45.64706
29/09/2016 23:05 VIC1 52.48626 30.5676
29/09/2016 23:10 VIC1 53.9509 30.5535
29/09/2016 23:15 VIC1 55.32627 30.54523
29/09/2016 23:20 VIC1 51.11882 30.53524
29/09/2016 23:25 VIC1 49.43074 30.53322
29/09/2016 23:30 VIC1 38.53342 30.54726

These prices will be updated in the Market and Settlement Systems as soon as practicable.

Manager Market Monitoring and Change
55070SETTLEMENTS RESIDUE30/09/2016 02:45:23 PM

[EventId:201609301445_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 30 September 2016 14:45

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1445 hrs on 30 September 2016

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 30 September 2016.

Refer to market notice: 55069

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.

The negative residue constraint NRM_VIC1_SA1 ceased operating at 1445 hrs on 30 September 2016.

This is an AEMO autogenerated Market Notice.
55069SETTLEMENTS RESIDUE30/09/2016 01:45:15 PM

[EventId:201609301345_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 30 September 2016 13:45

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1345 hrs on 30 September 2016

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 30 September 2016.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.

The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1345 hrs on 30 September 2016.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
55066SETTLEMENTS RESIDUE30/09/2016 06:00:20 AM

[EventId:201609300600_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 30 September 2016 06:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0600 hrs on 30 September 2016

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 30 September 2016.

Refer to market notice: 55064

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.

The negative residue constraint NRM_VIC1_SA1 ceased operating at 0600 hrs on 30 September 2016.

This is an AEMO autogenerated Market Notice.
55064SETTLEMENTS RESIDUE30/09/2016 05:35:17 AM

[EventId:201609300535_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 30 September 2016 05:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0535 hrs on 30 September 2016

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 30 September 2016.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.

The negative residue constraint set NRM_VIC1_SA1 commenced operating from 0535 hrs on 30 September 2016.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
55063SETTLEMENTS RESIDUE30/09/2016 05:15:19 AM

[EventId:201609300515_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 30 September 2016 05:15

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0515 hrs on 30 September 2016

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 30 September 2016.

Refer to market notice: 55062

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.

The negative residue constraint NRM_VIC1_SA1 ceased operating at 0515 hrs on 30 September 2016.

This is an AEMO autogenerated Market Notice.
55062SETTLEMENTS RESIDUE30/09/2016 04:10:19 AM

[EventId:201609300410_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 30 September 2016 04:10

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0410 hrs on 30 September 2016

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 30 September 2016.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.

The negative residue constraint set NRM_VIC1_SA1 commenced operating from 0410 hrs on 30 September 2016.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.