Planned outage of Moorabool to Tarrone 500kV line in Victoria region from 20/08/2016 0630 hrs to 20/08/2016 1800 hrs
This market notice is FOR INFORMATION ONLY.
The Moorabool to Tarrone 500kV line in Victoria Region is planned out of service from 0630 hrs on 20 August 2016 to 1800 hrs on 20 August 2016.
During this outage, a credible contingency can separate South Australia region from the rest of the NEM.
Under these circumstances, 35 MW of Raise and Lower regulation FCAS will be sourced from South Australia for the duration of this outage. In addition, consistent with AEMO existing procedures, adequate contingency FCAS lower requirements will also be sourced from South Australia at times when power transfer is from South Australia to Victoria.
The following constraint sets have been invoked for this outage:
F-V_MLTR (includes F-S_LREG_0035 and F-S_RREG_0035)
S-BOTH_BLKRG_C_OS
V-MLTR
V-MACARTHUR_ZERO
Refer AEMO Network Outage Schedule (NOS) for further details.
AEMO will continue monitoring this proposed outage and will update the Market accordingly.
Operations Planning
Update - Vulnerable Lines in Tasmania Region
Update - Vulnerable Lines in Tasmania Region
Refer to Market Notice 54639
At 0602 hrs the Farrell - Reece No 1 and the Farrell - Reece No 2 220 kV Lines tripped.
The cause of the trip was identified as due to Lightning.
In accordance with SO_OP_3715 section 11, AEMO now considers the Farrell - Reece No 1 and the Farrell - Reece No 2 220 kV Lines to be vulnerable with a category of probable due to Lightning.
Manager NEM Real Time Operations
Network Augmentation De-commissioned - QLD Region - 28 July 2016
Network Augmentation De-commissioned - QLD Region - 28 July 2016
The following transmission equipment in the Queensland region has been de-commissioned from 0928 hrs ;
Mackay - Proserpine 7126/2 132 kV Line.
Manager NEM Real Time Operations
Planned outage of Heywood No.1 500kV Bus in Victoria region from 10/08/2016 0700 hrs to 12/08/2016 1700 hrs
This market notice is FOR INFORMATION ONLY.
The Heywood No.1 500 kV busbar in Victoria Region is planned out of service from 0700 hrs on 10 August 2016 to 1700 hrs on 12 August 2016. During this outage, Heywood 500/275 kV M1 transformer will be off-loaded and Heywood - Tarrone - Alcoa Portland No.1 500 kV line will be open at Heywood.
During this outage, a credible contingency can separate South Australia region from the rest of the NEM.
Under these circumstances, 35 MW of Raise and Lower regulation FCAS will be sourced from South Australia for the duration of this outage. In addition, consistent with AEMO existing procedures, adequate contingency FCAS lower requirements will also be sourced from South Australia at times when power transfer is from South Australia to Victoria.
The following constraint sets have been invoked for this outage:
F-I_HYSE (includes F-S_LREG_0035 and F-S_RREG_0035)
S-BOTH_BLKRG_C_OS
V-HYTX_M12
V-HY_500BUS
Refer AEMO Network Outage Schedule (NOS) for further details.
AEMO will continue monitoring this proposed outage and will update the Market accordingly.
Operations Planning
Update - AEMO Brisbane Control Room evacuated - Saturday, 16 July 16
Refer to AEMO Electricity Market Notice no. 54522
AEMO advises all participants that as of 1435 hrs 16 July 2016, the AEMO Brisbane Control Centre site is now occupied.
All operational communications will now revert back to normal
Manager NEM Real Time Operations
AEMO Brisbane control room evacuated - Saturday, 16 July 2016
AEMO Brisbane control room evacuated - Saturday, 16 July 2016
AEMO advises all participants that as of 1416 hrs Saturday, 16 July 2016 the AEMO Brisbane site has been evacuated.
Until further notice all operational matters will be handled by the Sydney Control Centre
Manager NEM Real Time Operations
Network Augmentation De-commissioned - QLD Region - 15/07/16
Network Augmentation De-commissioned - QLD Region - 15/07/16
The following transmission equipment in the Queensland region has been de-commissioned.
Mackay - Proserpine 7215/2 132 kV Line.
Manager NEM Real Time Operations
Network Augmentation De-commissioned - South Australia Region - 15/07/16
Network Augmentation De-commissioned - South Australia Region - 15/07/16
The following transmission equipment in the South Australia region has been de-commissioned.
Keith - Tailem Bend No. 1 132 kV Line
Keith - Snuggery 132 kV Line
Manager NEM Real Time Operations
Planned outage of Tailem Bend 275kV - South East 275kV No.2 line from 16/07/2016 0745 hrs to 24/07/2016 1730hrs
?
During this outage, South Australia (SA) will remain connected to the NEM via the Tailem Bend - South East No.1 275kV line and the 132kV network.
?
A trip of the Tailem Bend - South East No. 1 275kV line will sever the 275 kV connections between the NEM and SA. SA will remain connected to the NEM via the 132kV network, which if it remains in service will pose a system security issue.
?
In the event of a trip of the Tailem Bend - South East No. 1 275kV line, AEMO will invoke FCAS regulation constraint sets F-S_LREG_0035 and F-S_RREG_0035
?
In addition,? AEMO will take all necessary steps as outlined in Section 6.1 of SO-OP-3715 Power System Security Guideline to separate the 132kV network and therefore manage an orderly separation of SA from the NEM.?
?
?
Operations Planning