Update - Non-credible contingency event - NSW Region - 15 Apr 2017
Update - Non-credible contingency event - NSW Region - 15 Apr 2017
Refer Market Notice 58390
At 1644 hrs the Broken Hill No 2 220/22 kV Transformer and No 2 Section 22 kV Bus tripped. This equipment has been returned to service.
The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Non-credible contingency event - NSW Region - 15 Apr 2017
Non-credible contingency event - NSW Region - 15 Apr 2017
At 1644 hrs the Broken Hill No 2 220/22 kV Transformer and No 2 Section 22 kV Bus tripped.
(Also subsequent loss of Broken Hill Solar Farm)
AEMO did not instruct load shedding.
AEMO has been advised of disconnection of 14 MW of bulk electrical load.
The cause of this non credible contingency event is not known at this stage and is still under investigation.
The Bus and Transformer are still out of service
Manager NEM Real Time Operations
Update- Non-credible contingency event - Qld Region - 04/04/2017
Update- Non-credible contingency event - Qld Region - 04/04/2017
Refer Market Notice 58331
At 0307 hrs trip of the Murarrie No.1 110 kV Bus coincident with trip of 7270 Murarrie - Lytton Bulk Supply 110 kV Line.
The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Non-credible contingency event - Qld Region - 04/04/2017
Non-credible contingency event - Qld Region - 04/04/2017
At 0307 hrs trip of the Murarrie No.1 110 kV Bus coincident with trip of 7270 Murarrie - Lytton Bulk Supply 110 kV Line.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Update - Non-credible contingency event - Qld region - 29/03/17
Refer AEMO Electricity Market Notice 58285
At 0840 hrs 29/03/17 the Mudgeeraba No. 2 and No. 4 110 kV Bus tripped.
The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Non-credible contingency event - Qld region - 29/03/17
Non-credible contingency event - Qld region - 29/03/17
At 0840 hrs 29/03/17 the Mudgeeraba No. 2 and No. 4 110 kV Bus tripped. This bus trip also tripped Mudgeeraba - Terranora No. 758 110 kV Line which interrupted supply to Terranora substation.
Note: Mudgeeraba - Terranora No. 757 110 kV Line was out of service (planned outage)
AEMO did not instruct load shedding.
The interruption to supply at Terranora substation resulted in approximately 35 MW of load lost.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event intervention price dispatch intervals - 29/03/17
Cancellation - AEMO Intervention Event intervention price dispatch intervals - 29/03/17
Refer AEMO Electricity Market Notice No. 58275
The AEMO Intervention Event was cancelled from the 0405 hrs dispatch interval 29/03/17
Manager NEM Real Time Operations
Cancellation of Direction - QLD region 29/03/17
Cancellation of Direction - QLD region 29/03/17
Refer to AEMO Electricity Market Notice 58276
The direction issued to a participant in the Qld Region was cancelled at 0400 hrs 29/03/17.
Manager NEM Real Time Operations
Update - Direction - QLD region 28/03/17
Update - Direction - QLD region
Refer to Electricity Market Notice 58266
In accordance with clause 4.8.9 of the National Electricity Rules AEMO has issued a direction to a participant in the Qld region.
The direction was necessary to maintain the power system in a secure operating state.
The direction was issued at 1440 hrs and is expected to stay in place until 0700 hrs 29/03/17.
Manager NEM Real Time Operations