[EventId:79] AP STARTED for market ancillary services in SA at 13 August 2016 04:00
Issued by Australian Energy Market Operator Ltd at 0355 hrs on 13 August 2016
ADMINISTERED PRICE PERIOD DECLARED in SA region.
AEMO has determined that the rolling sum of the uncapped market ancillary Lower Reg, Raise Reg services(s) prices for the SA region over the previous 2016 dispatch intervals has exceeded 6 times the cumulative price threshold (CPT) of $210,100.00.
In accordance with Clause 3.14 of the National Electricity Rules, AEMO has determined that an administered price period will commence at the dispatch interval starting 0400 hrs on 13 Aug 2016 and will continue through to the end of that trading day.
An administered price cap (APC) of 300 $/MWh will apply to all dispatch intervals during this administered price period. This APC will apply to all market ancillary service prices in the SA region.
An administered floor price (AFP) of 0 $/MWh AFP will apply to all market ancillary service prices.
AEMO will continue to monitor the rolling sum of the uncapped market ancillary service prices and issue further market notices as required.
This is an AEMO autogenerated Market Notice.
[EventId:78] AP ENDED for market ancillary services in SA at 13 August 2016 04:00
Issued by Australian Energy Market Operator Ltd at 0355 hrs on 13 August 2016
ADMINISTERED PRICE PERIOD ENDS in SA region.
In accordance with Clause 3.14.2(b) of the National Electricity Rules, AEMO is notifying market particpants that the administered price period declared for the SA region in market notice 54706 will end at 0400 hrs on 13 August 2016.
This is an AEMO autogenerated Market Notice.
Cancellation of the Actual (LOR2) condition in the South Australia region.
Cancellation of the Actual (LOR2) condition in the South Australia region.
Refer to AEMO Electricity Market Notice No. 54693
The Actual LOR2 condition in the South Australia Region is cancelled at 1130 hrs Friday, 12 August 2016
Manager NEM Real Time Operations
[EventId:78] AP STARTED for market ancillary services in SA at 12 August 2016 04:00
Issued by Australian Energy Market Operator Ltd at 0355 hrs on 12 August 2016
ADMINISTERED PRICE PERIOD DECLARED in SA region.
AEMO has determined that the rolling sum of the uncapped market ancillary Lower Reg, Raise Reg services(s) prices for the SA region over the previous 2016 dispatch intervals has exceeded 6 times the cumulative price threshold (CPT) of $210,100.00.
In accordance with Clause 3.14 of the National Electricity Rules, AEMO has determined that an administered price period will commence at the dispatch interval starting 0400 hrs on 12 Aug 2016 and will continue through to the end of that trading day.
An administered price cap (APC) of 300 $/MWh will apply to all dispatch intervals during this administered price period. This APC will apply to all market ancillary service prices in the SA region.
An administered floor price (AFP) of 0 $/MWh AFP will apply to all market ancillary service prices.
AEMO will continue to monitor the rolling sum of the uncapped market ancillary service prices and issue further market notices as required.
This is an AEMO autogenerated Market Notice.
[EventId:77] AP ENDED for market ancillary services in SA at 12 August 2016 04:00
Issued by Australian Energy Market Operator Ltd at 0355 hrs on 12 August 2016
ADMINISTERED PRICE PERIOD ENDS in SA region.
In accordance with Clause 3.14.2(b) of the National Electricity Rules, AEMO is notifying market particpants that the administered price period declared for the SA region in market notice 54699 will end at 0400 hrs on 12 August 2016.
This is an AEMO autogenerated Market Notice.
[EventId:77] AP STARTED for market ancillary services in SA at 11 August 2016 19:25
Issued by Australian Energy Market Operator Ltd at 1920 hrs on 11 August 2016
ADMINISTERED PRICE PERIOD DECLARED in SA region.
AEMO has determined that the rolling sum of the uncapped market ancillary Lower Reg services(s) prices for the SA region over the previous 2016 dispatch intervals has exceeded 6 times the cumulative price threshold (CPT) of $210,100.00.
In accordance with Clause 3.14 of the National Electricity Rules, AEMO has determined that an administered price period will commence at the dispatch interval starting 1925 hrs on 11 Aug 2016 and will continue through to the end of that trading day.
An administered price cap (APC) of 300 $/MWh will apply to all dispatch intervals during this administered price period. This APC will apply to all market ancillary service prices in the SA region.
An administered floor price (AFP) of 0 $/MWh AFP will apply to all market ancillary service prices.
AEMO will continue to monitor the rolling sum of the uncapped market ancillary service prices and issue further market notices as required.
This is an AEMO autogenerated Market Notice.
Actual LOR2 South Australia Region
Actual LOR2 South Australia Region
Refer AEMO Electricity Market Notice 54624
An actual LOR2 condition has been declared for the South Australia region from 1630 hrs until further notice during a planned outage of Heywood No1 500 kV bus in the Victoria region
If a credible contingency event occurs in this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.
There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.
Manager NEM Real Time Operations
Cancellation of the Actual (LOR2) condition in the South Australia region
Cancellation of the Actual (LOR2) condition in the South Australia region
Refer to AEMO Electricity Market Notice No. 54687
The Actual LOR2 condition in the South Australia Region is cancelled at 1135 hrs 10/8/16
Manager NEM Real Time Operations
Actual LOR2 South Australia Region
Actual LOR2 South Australia Region
Refer AEMO Electricity Market Notice 54624
An actual LOR2 condition has been declared for the South Australia region from 0745 hrs until further notice during a planned outage of Heywood No1 500 kV bus in the Victoria region
If a credible contingency event occurs in this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.
There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.
Manager NEM Real Time Operations