Filter by category
Filter by Date
[EventId:201607131000_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 13 July 2016 10:00
Issued by Australian Energy Market Operator Ltd at 1000 hrs on 13 July 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 13 July 2016.
Refer to market notice: 54466
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.
The negative residue constraint NRM_SA1_VIC1 ceased operating at 1000 hrs on 13 July 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201607130900_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 13 July 2016 09:00
Issued by Australian Energy Market Operator Ltd at 0900 hrs on 13 July 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 13 July 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.
The negative residue constraint set NRM_SA1_VIC1 commenced operating from 0900 hrs on 13 July 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Cancellation of Actual (LOR1) condition in the South Australia region - Tuesday, 12 July 2016
AEMO ELECTRICITY MARKET NOTICE
Cancellation of Actual (LOR1) condition in the South Australia region - Tuesday, 12 July 2016
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No 54458 is cancelled at 1930 hrs Tuesday, 12 July 2016.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. Tuesday, 12 July 2016.
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. Tuesday, 12 July 2016.
An Actual LOR1 condition has been declared for the South Australia Region.
From 1830 hrs to 1930 hrs Tuesday, 12 July 2016
The contingency capacity reserve required is 400 MW
The minimum reserve available is 224 MW
Manager NEM Real Time Operations
[EventId:201607121900_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 12 July 2016 19:00
Issued by Australian Energy Market Operator Ltd at 1900 hrs on 12 July 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 12 July 2016.
Refer to market notice: 54455
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.
The negative residue constraint NRM_SA1_VIC1 ceased operating at 1900 hrs on 12 July 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201607121800_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 12 July 2016 18:00
Issued by Australian Energy Market Operator Ltd at 1800 hrs on 12 July 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 12 July 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.
The negative residue constraint set NRM_SA1_VIC1 commenced operating from 1800 hrs on 12 July 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:201607121630_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 12 July 2016 16:30
Issued by Australian Energy Market Operator Ltd at 1630 hrs on 12 July 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 12 July 2016.
Refer to market notice: 54442
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.
The negative residue constraint NRM_SA1_VIC1 ceased operating at 1630 hrs on 12 July 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201607121505_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 12 July 2016 15:05
Issued by Australian Energy Market Operator Ltd at 1505 hrs on 12 July 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 12 July 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.
The negative residue constraint set NRM_SA1_VIC1 commenced operating from 1505 hrs on 12 July 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) condition in the South Australia region - STPASA
The Forecast LOR2 conditions in the South Australia region advised in AEMO Electricity Market Notice No. 54410 are cancelled at 1200 hrs 12/07/2016.
Ashley Dunn
Operations Planning