Cancellation of the Forecast (LOR3) condition in the Vic region - STPASA
Cancellation of the Forecast (LOR3) condition in the Vic region - STPASA
The Forecast LOR3 condition in the Vic Region advised in AEMO Electricity Market Notice No.58483 is cancelled at 0530 hrs 05/05/2017.
Manager NEM Real Time Operations
Forecast Lack Of Reserve Level 3 (LOR3) in the SA region - STPASA
Forecast Lack Of Reserve Level 3 (LOR3) in the SA region - STPASA
Under the NER Cl 4.8.4(d), AEMO considers that Customer load would be interrupted in order to maintain or restore the security of the power system in SA Region, for the following period,
AEMO declares a Forecast LOR3 condition for the SA Region.
From 1730 hrs to 1800 hrs 11/05/2017
The maximum load forecast to be interrupted is 37 MW at 1730 hrs 11/05/2017
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through a AEMO intervention event.
Manager NEM Real Time Operations
Forecast Lack Of Reserve Level 3 (LOR3) in the Vic Region - STPASA
Forecast Lack Of Reserve Level 3 (LOR3) in the Vic Region - STPASA
Under the NER Cl 4.8.4(d), AEMO considers that Customer load would be interrupted in order to maintain or restore the security of the power system in Vic Region, for the following period,
AEMO declares a Forecast LOR3 condition for the Vic Region.
From 1730 hrs to 1800 hrs 11/05/2017
The maximum load forecast to be interrupted is 37 MW at 1730 hrs 11/05/2017
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through a AEMO intervention event.
Manager NEM Real Time Operations
Update Actual Lack Of Reserve Level 2 (LOR2) in the SA Region - 03/03/17
Update Actual Lack Of Reserve Level 2 (LOR2) in the SA Region - 03/03/17
An Actual LOR2 condition has been declared for the SA region from 1503 hrs.
The Actual LOR2 condition is forecast to exist until 1800 hrs.
The contingency capacity reserve required is 250 MW
The minimum reserve available is 210 MW
AEMO is seeking a market response.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 2 (LOR2) in the SA Region - 03/03/17
Actual Lack Of Reserve Level 2 (LOR2) in the SA Region - 03/03/17
An Actual LOR2 condition has been declared for the SA region from 1503 hrs.
The Actual LOR2 condition is forecast to exist until 1700 hrs.
The contingency capacity reserve required is 250 MW
The minimum reserve available is 160 MW
AEMO is seeking a market response.
Manager NEM Real Time Operations
Cancellation - Actual LOR2 South Australia Region - Monday, 27 February 2017
Cancellation - Actual LOR2 South Australia Region - Monday, 27 February 2017
Refer AEMO Electricity Market Notices 57709 57714 and 57715
The Actual LOR2 condition has been cancelled for the South Australia region from 0609 hrs. The APD - Heywood - Mortlake No.2 500k V Line in Victoria has been returned to service.
Manager NEM Real Time Operations
Actual LOR2 South Australia Region - 23/1/2017
Actual LOR2 South Australia Region - Mon 27 Feb 2017
Refer AEMO Electricity Market Notice 57709
An actual LOR2 condition has been declared for the South Australia region from 0445 hrs due to an unplanned outage of the APD - Heywood - Mortlake No.2 500k V Line in Victoria
If a credible contingency event occurs in this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.
There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.
Manager NEM Real Time Operations
Cancellation Actual Lack Of Reserve Level 2 (LOR2) in the Qld Region - 12/02/17
Cancellation Actual Lack Of Reserve Level 2 (LOR2) in the Qld Region - 12/02/17
Refer Electricity Market Notice 57473
The Actual LOR2 condition declared for the Qld region is cancelled at 1930 hrs 12/02/2017.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 2 (LOR2) in the Qld Region - 12/02/17
Actual Lack Of Reserve Level 2 (LOR2) in the Qld Region - 12/02/17
An Actual LOR2 condition has been declared for the Qld region from 1700 hrs.
The Actual LOR2 condition is forecast to exist until 1800 hrs
The contingency capacity reserve required is 680 MW
The minimum reserve available is 548 MW
AEMO is seeking a market response.
Manager NEM Real Time Operations