Filter by category
Filter by Date
Cancellation of the Forecast (LOR2) condition in the SA Region - STPASA - 04/07/2016
Cancellation of the Forecast (LOR2) condition in the SA Region - STPASA - 04/07/2016
The Forecast LOR2 condition in the SA Region advised in AEMO Electricity Market Notice No54176 is cancelled at 2200 hrs 29/06/2016.
Manager NEM Real Time Operations
Update: Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016
RE: AEMO Electricity Market Notice No. 54172 & 54173.
NOTICE OF UPDATE
AEMO declares forecast LOR2 conditions for the South Australia region for the following period:
From 04/07/2016 1800 hrs to 2000 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 136 MW
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.
Harmohan Singh
Operations Planning
Update: Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016
RE: AEMO Electricity Market Notice No. 54157 & 54160.
NOTICE OF UPDATE
AEMO declares forecast LOR2 conditions for the South Australia region for the following period:
From 04/07/2016 1830 hrs to 1930 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 166 MW
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.
Harmohan Singh
Operations Planning
Update: Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016
RE: AEMO Electricity Market Notice No. 54157.
NOTICE OF UPDATE
AEMO declares forecast LOR2 conditions for the South Australia region for the following periods:
From 04/07/2016 1800 hrs to 2000 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 110 MW
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.
Harmohan Singh
Operations Planning
Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016
AEMO declares a Forecast LOR2 condition for the South Australia region for the following period:
From 04/07/2016 1800 hrs to 1900 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 165 MW
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.
Operations Planning
[EventId:201605190100_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 19 May 2016 01:00
Issued by Australian Energy Market Operator Ltd at 0100 hrs on 19 May 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 19 May 2016.
Refer to market notice: 53406
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.
The negative residue constraint NRM_SA1_VIC1 ceased operating at 0100 hrs on 19 May 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201605182340_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 18 May 2016 23:40
Issued by Australian Energy Market Operator Ltd at 2340 hrs on 18 May 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 18 May 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.
The negative residue constraint set NRM_SA1_VIC1 commenced operating from 2340 hrs on 18 May 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.