Filter by category
Filter by Date
Update: Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016
RE: AEMO Electricity Market Notice No. 54157 & 54160.
NOTICE OF UPDATE
AEMO declares forecast LOR2 conditions for the South Australia region for the following period:
From 04/07/2016 1830 hrs to 1930 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 166 MW
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.
Harmohan Singh
Operations Planning
Planned outage of Tailem Bend 275kV - South East 275kV No.1 line from 04/07/2016 0745 hrs to 12/07/2016 1730hrs
Planned outage of Tailem Bend 275kV - South East 275kV No.1 line from 04/07/2016 0745 hrs to 12/07/2016 1730hrs
During these outage, South Australia region will remain connected to the NEM. However, there is a risk of South Australia region separating from the rest of the NEM following the next credible contingency (trip Tailem Bend 275kV - South East 275kV No.2 line).
AEMO will take all necessary steps as outlined in Section 6.1 of SO-OP-3715 Power System Security Guideline to manage the orderly separation of SA from the NEM following the next credible contingency.
Prior to the orderly separation of SA, the following FCAS regulation constraints will be invoked to manage security of South Australia power system.
F-S_LREG_0035
F-S_RREG_0035
Refer to AEMO Network Outage Schedule (NOS) for further details
Operations Planning
Network Augmentation Commissioned - Vic Region 29 June 2016
Network Augmentation Commissioned in the Victoria Region
The Ararat Terminal Station (ARTS) was commissioned at 0203 hrs 29 June 2016. The ARTS substation has been cut into the former Horsham - Waubra 220kV Line to form two new transmission lines namely, Ararat - Horsham 220kV Line and Ararat - Waubra 220kV Line
Manager NEM Real Time Operations
Update - Raise Regulation FCAS Increased - 28/06/16
Update - Variation to FCAS regulation requirements: NEM Global - 28/06/16.
FCAS Raise regulation requirements were increased to manage time error to within standards.
The following constraints wasinvoked to manage raise regulation requirements.
F-MAIN_RREG_0400 invoked from 1715 hrs to 1745 hrs
Manager NEM Real Time Operations
Update - Raise Regulation FCAS Increased - 28/06/16
Update - Variation to FCAS regulation requirements: NEM Global - 28/06/16.
FCAS Raise regulation requirements have been increased to manage time error to within standards.
The following constraints have been invoked to manage raise regulation requirements.
F-MAIN_RREG_0400invoked from 1715 hrs until further notice.
Manager NEM Real Time Operations
Raise Regulation FCAS Increased - 28/06/16
Variation to FCAS regulation requirements: NEM Global - 28/06/16.
FCAS Raise regulation requirements have been increased to manage time error to within standards.
The following constraints have been invoked to manage raise regulation requirements.
F-MAIN_RREG_0350 invoked from 1630 hrs until further notice.
Manager NEM Real Time Operations
Update: Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016
RE: AEMO Electricity Market Notice No. 54157.
NOTICE OF UPDATE
AEMO declares forecast LOR2 conditions for the South Australia region for the following periods:
From 04/07/2016 1800 hrs to 2000 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 110 MW
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.
Harmohan Singh
Operations Planning
Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016
AEMO declares a Forecast LOR2 condition for the South Australia region for the following period:
From 04/07/2016 1800 hrs to 1900 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 165 MW
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.
Operations Planning
Update - Raise Regulation FCAS Increased - 27/06/16
Update - Variation to FCAS regulation requirements: NEM Global - 27/06/16.
Refer to MN 54151
FCAS Raise regulation requirements were increased to manage time error to within standards.
The following constraints were invoked to manage raise regulation requirements.
F-MAIN_RREG_0350 invoked from 1650 hrs to 1735 hrs
Manager NEM Real Time Operations