54232RESERVE NOTICE06/07/2016 12:56:37 PM

Forecast Lack of Reserve Level 2 (LOR2) in the SA region - PDPASA - 07 July 2016

AEMO ELECTRICITY MARKET NOTICE

Forecast Lack of Reserve Level 2 (LOR2) in the SA region - PDPASA - 07 July 2016

AEMO declares a Forecast LOR2 condition for the SA region.

From 1830 hrs to 1930 hrs 07 July 2016

The contingency capacity reserve required is 220 MW

The minimum reserve available is 198 MW

AEMO is seeking a market response.

AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
54200RESERVE NOTICE02/07/2016 10:22:23 AM

Cancellation of the Forecast (LOR2) condition in the South Australia Region - STPASA

AEMO ELECTRICITY MARKET NOTICE

Cancellation of the Forecast (LOR2) condition in the SA Region - STPASA - 07/07/2016
The Forecast LOR2 condition in the SA Region advised in AEMO Electricity Market Notice No 54191 is cancelled at 1015 hrs 02/07/2016.

Manager NEM Real Time Operations
54191RESERVE NOTICE02/07/2016 06:08:54 AM

FORECAST LACK OF RESERVE LEVEL 2 (LOR2) in the South Australia region (ST PASA).

AEMO ELECTRICITY MARKET NOTICE


FORECAST LACK OF RESERVE LEVEL 2 (LOR2) in the South Australia region (ST PASA).

AEMO declares a forecast LOR2 condition for the South Australia region for the following period.

Thursday 7th July 2016 from 1830 hrs to 1900 hrs

The minimum reserve available is 196 MW.


This calculation is based on a LOR2 trigger level of 200 MW.

AEMO is seeking a market response.


Manager NEM Real Time Operations
54178RESERVE NOTICE29/06/2016 10:18:57 PM

Cancellation of the Forecast (LOR2) condition in the SA Region - STPASA - 04/07/2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation of the Forecast (LOR2) condition in the SA Region - STPASA - 04/07/2016

The Forecast LOR2 condition in the SA Region advised in AEMO Electricity Market Notice No54176 is cancelled at 2200 hrs 29/06/2016.


Manager NEM Real Time Operations





54176RESERVE NOTICE29/06/2016 05:21:13 PM

Update: Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016

AEMO ELECTRICITY MARKET NOTICE

RE: AEMO Electricity Market Notice No. 54172 & 54173.

NOTICE OF UPDATE
AEMO declares forecast LOR2 conditions for the South Australia region for the following period:

From 04/07/2016 1800 hrs to 2000 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 136 MW

AEMO is seeking a market response.

AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.

Harmohan Singh
Operations Planning
54172RESERVE NOTICE29/06/2016 03:15:13 PM

Update: Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016

AEMO ELECTRICITY MARKET NOTICE

RE: AEMO Electricity Market Notice No. 54157 & 54160.

NOTICE OF UPDATE
AEMO declares forecast LOR2 conditions for the South Australia region for the following period:

From 04/07/2016 1830 hrs to 1930 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 166 MW

AEMO is seeking a market response.

AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.

Harmohan Singh
Operations Planning
54160RESERVE NOTICE28/06/2016 03:06:23 PM

Update: Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016

AEMO ELECTRICITY MARKET NOTICE

RE: AEMO Electricity Market Notice No. 54157.

NOTICE OF UPDATE
AEMO declares forecast LOR2 conditions for the South Australia region for the following periods:

From 04/07/2016 1800 hrs to 2000 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 110 MW

AEMO is seeking a market response.

AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.

Harmohan Singh
Operations Planning
54157RESERVE NOTICE28/06/2016 11:01:52 AM

Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition for the South Australia region for the following period:

From 04/07/2016 1800 hrs to 1900 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 165 MW

AEMO is seeking a market response.

AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.

Operations Planning
53981POWER SYSTEM EVENTS16/06/2016 11:31:54 AM

Non-credible contingency event - Vic region - 16/06/16

AEMO ELECTRICITY MARKET NOTICE

Non-credible contingency event - Vic region - 16/06/16

At 1106 hrs the following plant tripped.
Loy Yang No. 1 and No. 3 500 kV Bus
Hazelwood - Loy Yang No. 2 500 kV Line
Loy Yang No. 1 500/220 kV Transformer
Loy Yang A1 generating unit

AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

AEMO will not reclassify this event as a credible contingency event.

Manager NEM Real Time Operations