54176RESERVE NOTICE29/06/2016 05:21:13 PM

Update: Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016

AEMO ELECTRICITY MARKET NOTICE

RE: AEMO Electricity Market Notice No. 54172 & 54173.

NOTICE OF UPDATE
AEMO declares forecast LOR2 conditions for the South Australia region for the following period:

From 04/07/2016 1800 hrs to 2000 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 136 MW

AEMO is seeking a market response.

AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.

Harmohan Singh
Operations Planning
54172RESERVE NOTICE29/06/2016 03:15:13 PM

Update: Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016

AEMO ELECTRICITY MARKET NOTICE

RE: AEMO Electricity Market Notice No. 54157 & 54160.

NOTICE OF UPDATE
AEMO declares forecast LOR2 conditions for the South Australia region for the following period:

From 04/07/2016 1830 hrs to 1930 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 166 MW

AEMO is seeking a market response.

AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.

Harmohan Singh
Operations Planning
54160RESERVE NOTICE28/06/2016 03:06:23 PM

Update: Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016

AEMO ELECTRICITY MARKET NOTICE

RE: AEMO Electricity Market Notice No. 54157.

NOTICE OF UPDATE
AEMO declares forecast LOR2 conditions for the South Australia region for the following periods:

From 04/07/2016 1800 hrs to 2000 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 110 MW

AEMO is seeking a market response.

AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.

Harmohan Singh
Operations Planning
54157RESERVE NOTICE28/06/2016 11:01:52 AM

Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition for the South Australia region for the following period:

From 04/07/2016 1800 hrs to 1900 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 165 MW

AEMO is seeking a market response.

AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.

Operations Planning
53981POWER SYSTEM EVENTS16/06/2016 11:31:54 AM

Non-credible contingency event - Vic region - 16/06/16

AEMO ELECTRICITY MARKET NOTICE

Non-credible contingency event - Vic region - 16/06/16

At 1106 hrs the following plant tripped.
Loy Yang No. 1 and No. 3 500 kV Bus
Hazelwood - Loy Yang No. 2 500 kV Line
Loy Yang No. 1 500/220 kV Transformer
Loy Yang A1 generating unit

AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

AEMO will not reclassify this event as a credible contingency event.

Manager NEM Real Time Operations
53874POWER SYSTEM EVENTS11/06/2016 10:32:06 AM

Non-credible contingency event - NSW region - 11 June 2016

AEMO ELECTRICITY MARKET NOTICE

Non-credible contingency event - NSW region - 11 June 2016

At 0950 hrs the Wagga substation 132kV B bus, the No2 and the No3 330/132kV transformers tripped.

AEMO did not observe any reduction in electrical demand
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.

Manager NEM Real Time Operations

53705POWER SYSTEM EVENTS08/06/2016 02:45:06 AM

Update - Non-Credible Contingency Event - Vic Region - 8 June 2016

AEMO ELECTRICITY MARKET NOTICE

Update - Non-credible contingency event - Victoria region - 8 June 2016

Update to MN 53704

At 0219 hrs the Yallourn No. 2 220 kV bus was returned to service.

The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

AEMO will not reclassify this event as a credible contingency event.

Manager NEM Real Time Operations
53704POWER SYSTEM EVENTS08/06/2016 01:41:50 AM

Non-Credible Contingency Event - Vic Region - 8 June 2016

AEMO ELECTRICITY MARKET NOTICE

Non-credible contingency event - Victoria region - 8 June 2016

At 0129 hrs the Yallourn No. 2 220 kV bus tripped.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
53677POWER SYSTEM EVENTS07/06/2016 04:39:07 PM

Non-Credible Contingency Event - Vic Region - Tues 7th Jun 2016

AEMO ELECTRICITY MARKET NOTICE

Non-Credible Contingency Event - Vic Region - Tues 7th Jun 2016

At 1610 hrs the Richmond No 2 and No 4 220 kV Buses tripped in the Victoria region.

(Coincident with a planned outage Rowville - Richmond No 1 220 kV Line )

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is known


Manager NEM Real Time Operations