Actual LOR2 South Australia Region - 09 Sept 2016
Actual LOR2 South Australia Region - 09 Sept 2016
Refer AEMO Electricity Market Notice 54686
An Actual LOR2 condition is declared for the South Australia region from 0710 hrs until further notice due to the planned outage of the Heywood No.2 500 kV busbar.
If a credible contingency event occurs during this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.
There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.
Manager NEM Real Time Operations
Cancellation of the Actual (LOR2) condition in the South Australia region 09 Sept 2016
Cancellation of the Actual (LOR2) condition in the South Australia region 09 Sept 2016
Refer to AEMO Electricity Market Notice No. 54861
The Actual LOR2 condition in the South Australia Region is cancelled at 0535 hrs 09 September 2016
Manager NEM Real Time Operations
Actual LOR2 South Australia Region - 08 Sept 2016
Actual LOR2 South Australia Region - 08 Sept 2016
Refer AEMO Electricity Market Notice 54686
An Actual LOR2 condition is declared for the South Australia region from 0220 hrs until further notice due to the planned outage of the Heywood No.2 500 kV busbar.
If a credible contingency event occurs during this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.
There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.
Manager NEM Real Time Operations
Cancellation of the Actual (LOR2) condition in the South Australia region 07 Sept 2016
Cancellation of the Actual (LOR2) condition in the South Australia region 07 Sept 2016
Refer to AEMO Electricity Market Notice No. 54853
The Actual LOR2 condition in the South Australia Region is cancelled at 2300 hrs 07 September 2016
Manager NEM Real Time Operations
Actual LOR2 South Australia Region - 06 Sept 2016
Actual LOR2 South Australia Region - 06 Sept 2016
Refer AEMO Electricity Market Notice 54686
An Actual LOR2 condition is declared for the South Australia region from 0710 hrs until further notice due to the planned outage of the Heywood No.2 500 kV busbar.
If a credible contingency event occurs during this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.
There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) condition in the South Australia Region for 06/09/2016
The Forecast LOR1 condition in the South Australia region for 06/09/2016 advised in AEMO Electricity Market Notice No. 54845 is cancelled at 1400 hrs 05/09/2016.
No LOR1 condition is currently forecast in the STPASA period.
Tien Foong
Operations Planning
Forecast Lack Of Reserve Level 1 (LOR1) in the South Australian Region - STPASA - 06 Sept 2016
Forecast Lack Of Reserve Level 1 (LOR1) in the South Australian Region - STPASA - 06 Sept 2016
AEMO declares a Forecast LOR1 condition for the South Australian Region.
From 0800 hrs to 0900 hrs 06/09/2016
The contingency capacity reserve required is 400 MW
The minimum reserve available is 351 MW
Manager NEM Real Time Operations
Forecast Lack Of Reserve Level 1 (LOR1) in the South Australian Region - STPASA - 06 Sept 2016
Forecast Lack Of Reserve Level 1 (LOR1) in the South Australian Region - STPASA - 06 Sept 2016
AEMO declares a Forecast LOR1 condition for the South Australian Region.
From 0800 hrs to 0900 hrs 06/09/2016
The contingency capacity reserve required is 400 MW
The minimum reserve available is 335 MW
Manager NEM Real Time Operations
Cancellation - Actual LOR2 South Australia Region - 02 Sept 2016
Cancellation - Actual LOR2 South Australia Region - 02 Sept 2016
Refer AEMO Electricity Market Notice 54833
An Actual LOR2 condition was declared for the South Australia region from 0710 hrs to 1605 hrs due to the planned outage of the Morrabool Terminal Station- Tarrone Terminal Station 500kV Line.
Manager NEM Real Time Operations