Market Notices

54507RESERVE NOTICE14/07/2016 05:46:03 PM

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 14/07/16

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 14/07/16.

An Actual LOR1 condition has been declared for the SA Region from 1745 hrs.

The Actual LOR1 condition is forecast to exist until 2030 hrs

The contingency capacity reserve required is 440 MW

The minimum reserve available is 342 MW


Manager NEM Real Time Operations
54506INTER-REGIONAL TRANSFER14/07/2016 05:41:28 PM

Inter-regional transfer limit variation SA region - 14 July 2016

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation SA region - 14/07/16

The return to service of the Tailem Bend 275 kV West Bus and the Tailem Bend - South East No. 1 275 kV Line has been delayed to 2030 hrs.

The following constraint set is invoked for these outages

S-TB_275KV_W_BUS

The constraint set contains equations the following interconnectors on the LHS

NSW1-QLD1
V-S-MNSP1
V-SA

Refer to AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
54480RESERVE NOTICE13/07/2016 09:09:28 PM

Cancellation of Actual (LOR1) condition in the South Australia region - 13/07/16

AEMO ELECTRICITY MARKET NOTICE
Cancellation of Actual (LOR1) condition in the South Australia region - 13/07/16
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice 544785 is cancelled at 2100 hrs 13/07/16

Manager NEM Real Time Operations
54478RESERVE NOTICE13/07/2016 06:04:37 PM

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 13/07/16

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 13/07/16.

An Actual LOR1 condition has been declared for the SA Region from 1800 hrs.

The Actual LOR1 condition is forecast to exist until 2100 hrs

The contingency capacity reserve required is 400 MW

The minimum reserve available is 281 MW


Manager NEM Real Time Operations
54460RESERVE NOTICE12/07/2016 07:44:57 PM

Cancellation of Actual (LOR1) condition in the South Australia region - Tuesday, 12 July 2016

Manager NEM Real Time Operations

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the South Australia region - Tuesday, 12 July 2016

The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No 54458 is cancelled at 1930 hrs Tuesday, 12 July 2016.


Manager NEM Real Time Operations

54458RESERVE NOTICE12/07/2016 07:04:33 PM

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. Tuesday, 12 July 2016.

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. Tuesday, 12 July 2016.

An Actual LOR1 condition has been declared for the South Australia Region.

From 1830 hrs to 1930 hrs Tuesday, 12 July 2016

The contingency capacity reserve required is 400 MW

The minimum reserve available is 224 MW


Manager NEM Real Time Operations


54450INTER-REGIONAL TRANSFER12/07/2016 03:55:32 PM

Inter regional transfer limit variation SA - 12 July 2016

AEMO ELECTRICITY MARKET NOTICE

Inter regional transfer limit variation SA - 12 July 2016

Due to continuing bad weather in the SA region a number of SA outages have been impacted.

The outages have been extended by approximately 24 hrs

The following constraint set is invoked for these outages

S-TB_275KV_W_BUS

The outage constraints contain the following interconnectors on the LHS

NSW1-QLD1
V-S-MNSP1
V-SA

Refer to AEMO Network Outage Scheduler (NOS) for updated times.

Manager NEM Real Time Operations
54399INTER-REGIONAL TRANSFER11/07/2016 05:33:37 PM

Inter regional transfer limit variation SA - 11 July 2016

AEMO ELECTRICITY MARKET NOTICE

Inter regional transfer limit variation SA - 11 July 2016

Due to high winds in the SA region a number of SA outages have been impacted.

The outages have been extended by approximately 27 hrs

The following constraint set is invoked for these outage

S-TB_275KV_W_BUS

The outage constraints contain the following interconnectors on the LHS

NSW1-QLD1
V-S-MNSP1
V-SA

Refer to AEMO Network Outage Scheduler (NOS) for updated times.

Manager NEM Real Time Operations
54394INTER-REGIONAL TRANSFER11/07/2016 07:17:55 AM

Inter-regional transfer limit variation VIC - 11 July 2016

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation VIC - 11 July 2016

An outage of Moorabool - South Morang 500 kV Line in the VIC region required an update of the outage constraints.

The following constraint set is invoked for this outage

CA_SPS_46954420

The outage constraints contain the following interconnectors on the LHS

V-S-MNSP1
VIC1-NSW1
T-V-MNSP1
V-SA

Refer to AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
X