107563PRICE ADJUSTMENT24/04/2023 02:51:01 PM

[EventId:202304221620_confirmed] Prices for interval 22-Apr-2023 16:20 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1451 hrs on 24 April 2023

PRICES ARE NOW CONFIRMED for trading interval 22-Apr-2023 16:20.

In accordance with Market Notice AEMO has reviewed this trading interval and determined that:

Changed Prices ($/MWh)

TYPE
Region Original Adjusted
Price Price
ENERGY
SA1 $92.11 $45.06
VIC1 $94.42 $44.94
LOWER5MIN
VIC1 $0.39 $2.38
LOWER60SEC
VIC1 $0.38 $4.24
LOWER6SEC
VIC1 $0.38 $0.53
LOWERREG
VIC1 $25.13 $13.67
RAISE5MIN
VIC1 $0.39 $0.37
RAISE60SEC
VIC1 $2.25 $1.00
RAISE6SEC
VIC1 $2.96 $1.28
RAISEREG
VIC1 $60.00 $33.61


This is an AEMO autogenerated Market Notice.
107205CONSTRAINTS03/04/2023 01:42:00 PM

Tasmanian Regulation FCAS changes - Wednesday 5th April 2023

AEMO ELECTRICITY MARKET NOTICE

AEMO are changing the procurement of Regulation FCAS for the TAS region.

This change is based on advice received from TasNetworks, following a review of operation of the TAS region with the end of the reclassification of Basslink.

Refer to AEMO Electricity market notice 105443.

Following this change Regulation FCAS requirements for the TAS region will only be procured from within TAS.

This change will be implemented from 1000 on Wed 5th April.

Ben Blake
Manager Congestion & Grid Modelling
106855CONSTRAINTS21/03/2023 08:14:08 AM

Update to Victorian system normal constraint equations ID

AEMO ELECTRICITY MARKET NOTICE

AEMO has been conducting major review of thermal constraint equations for preparation of completion of VNI East project. As part of the review, AEMO is going to update the constraint equations IDs to use the new standard format of below (this is the same standard now used in NSW):

V>>[OUTAGE]_[MONITORING ELEMENT]_[CONTINGENCY ELEMENT]

This is to improve the simplicity and readability of a thermal constraint equation ID.

Constraint equations ID in sets V-NIL and V-NIL_BATS_BETS_15M will be updated to the new format on Thursday 23rd March 2023 at 1000 hrs. The previous used constraint equations ID will be included in the Modification field of the constraint equation for reference.

The changes have now been implemented into AEMO's pre-production system.

Terry Liu
AEMO Operations
106842PRICE ADJUSTMENT20/03/2023 11:45:58 AM

[EventId:202303172015_confirmed] Prices for interval 17-Mar-2023 20:15 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1145 hrs on 20 March 2023

PRICES ARE NOW CONFIRMED for trading interval 17-Mar-2023 20:15.

In accordance with Market Notice AEMO has reviewed this trading interval and determined that:

Changed Prices ($/MWh)

TYPE
Region Original Adjusted
Price Price
ENERGY
NSW1 $254.92 $119.81
QLD1 $270.00 $128.22
VIC1 $222.69 $113.45
LOWER5MIN
NSW1 $0.39 $0.50
LOWER60SEC
NSW1 $0.39 $0.80
LOWER6SEC
NSW1 $0.19 $0.38
LOWERREG
NSW1 $3.98 $4.14
RAISE5MIN
NSW1 $0.69 $0.62
RAISE60SEC
NSW1 $39.00 $2.36
RAISE6SEC
NSW1 $127.88 $4.90
RAISEREG
NSW1 $167.27 $14.74


This is an AEMO autogenerated Market Notice.
106658PRICE ADJUSTMENT15/03/2023 03:07:21 PM

[EventId:202303141455_confirmed] Prices for interval 14-Mar-2023 14:55 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1507 hrs on 15 March 2023

PRICES ARE NOW CONFIRMED for trading interval 14-Mar-2023 14:55.

In accordance with Market Notice 106608 AEMO has reviewed this trading interval and determined that:
- Over-Constrained Dispatch has been resolved for this interval

Changed Prices ($/MWh)

TYPE
Region Original Adjusted
Price Price
RAISEREG
TAS1 $5.68 $42.74


This is an AEMO autogenerated Market Notice.
106643CONSTRAINTS15/03/2023 12:39:32 PM

Updated NSW system normal voltage stability limit

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 105936?

The Murraylink Very Fast Runback (VFRB) scheme was modified to increase the capacity of the network due to the increase in generation in the area. The scheme was changed so Murraylink VFRB could be activated / de-activated depending on the time of day on the monitored 220kV lines in north-west Victoria.?

Transgrid has advised AEMO on a revision to the X5 voltage collapse limit with this change to VFRB. This will now be managed by two limits.?

The following constraint equation changes will be implemented at 0900 hrs on Thursday 16th March 2023:
N^^N_NIL_X5_BEKG (replaces N^^N_NIL_3)
N^^N_NIL_X5_BESH (new)?

For full details on the factors on constraint equations and all the constraint equation changes - these have now been loaded into AEMO's pre-production systems.?

Ben Blake
AEMO Operations

106175CONSTRAINTS01/03/2023 11:54:17 AM

Update to system strength requirements in North Queensland

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 102074

AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland.
Due to commissioning of Kaban wind farm in Far North Queensland, the system normal equations have been revised to include following combinations.

-If Stanwell >=2, Stanwell + Calllide >=3, Gladstone >= 1, Stanwell + Callide + Gladstone >= 7, Kareeya >=0, Haughton Syncon status = ON/OFF, North Queensland load >=250 MW,
Ross+FNQ load >=100 MW, limit Kaban Windfarm to 100% (with Haughton Syncon ON), 0% (with Haughton Syncon Syncon OFF) and no limit to other NQLD Plants.

A revision to the constraint equations will be implemented at 1400 hrs on Wednesday 1st March 2023.

The new combinations have now published in a limits advice document on AEMO's website. For more information refer to the new limits advice: https://www.aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice

This advice contains all the combinations for Queensland for system normal cases. Additional information has been included in the limit advice to clarify the requirement to disconnect all inverters/turbines under certain system conditions.

The constraint equation in the Q-NIL set of the form below will be modified:

Q_NIL_STRGTH_XXXX
Q_NIL_STRGTH_XXXX_I


AEMO Operations
105936CONSTRAINTS17/02/2023 05:07:05 PM

Changes to Murraylink Very Fast Runback and constraints in Victoria

AEMO ELECTRICITY MARKET NOTICE

The Murraylink Very Fast Runback (VFRB) scheme is being modified to increase the capacity of the network due to the increase in generation in the area. The scheme will be changed so Murraylink VFRB can be activated / de-activated depending on the time of day on the monitored 220kV lines in north-west Victoria.

The changes to the scheme will be activated and constraint equaiton modified at 1200hrs Monday 20th February 2023. The following system normal constraint equations will be modified:
V^^V_NIL_KGTS
V^^V_NIL_KGTS_2
V>>SML_NIL_7A
V>>SML_NIL_7B
V>>SML_NIL_7C
V>>V_NIL_13
V>>V_NIL_14
V>>V_NIL_20
V>>V_NIL_21
V>>V_NIL_22
V>>V_NIL_23
V>>V_NIL_24
V>>V_NIL_25
V>>V_NIL_26
V>>V_NIL_26_1
V>>V_NIL_26A
V>>V_NIL_26A_1

For full details on the factors on constraint equations and all the constrint equation changes - these have now been loaded into AEMO's pre-production systems.

Ben Blake
AEMO Operations
103964ADMINISTERED PRICE CAP26/11/2022 03:55:00 AM

[EventId:196] AP ENDED for market ancillary services in SA1 at 26 November 2022 03:55

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0355 hrs on 25 November 2022

ADMINISTERED PRICE PERIOD ENDS in SA1 region.

In accordance with Clause 3.14.2(b) of the National Electricity Rules, AEMO is notifying market participants that the administered price period declared for the SA1 region in market notice 103934 will end at 0400 hrs on 26 November 2022.