STPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 29/06/2022
The Forecast LOR3 Condition in the SA Region advised in AEMO Electricity Market Notice No.98820 has been updated at 1600 hrs 22/06/2022 to the following:
From 1730 hrs 29/06/2022 to 1830 hrs 29/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 258 MW at 1800 hrs.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 29/06/2022
AEMO declares a Forecast LOR3 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:
From 1700 hrs 29/06/2022 to 1830 hrs 29/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 401 MW at 1800 hrs.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 3 (LOR3) in the QLD Region on 22/06/2022
The Forecast LOR3 condition in the QLD region advised in AEMO Electricity Market Notice No. 98735 is cancelled at 1400 hrs 22/06/2022
AEMO Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 22/06/2022
The Forecast LOR3 condition in the SA region advised in AEMO Electricity Market Notice No. 98732 is cancelled at 1400 hrs 22/06/2022
AEMO Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 3 (LOR3) in the Vic Region on 22/06/2022
The Forecast LOR3 condition in the Vic region advised in AEMO Electricity Market Notice No. 98736 is cancelled at 1400 hrs 22/06/2022
AEMO Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region beginning on 22/06/2022
The Forecast LOR3 condition in the NSW region advised in AEMO Electricity Market Notice No. 98733 is cancelled at 1400 hrs 22/06/2022
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the Vic Region on 22/06/2022
The Forecast LOR3 condition in the Vic region advised in AEMO Electricity Market Notice No. 98726 has been updated at 1330 hrs to the following:
[1.] From 0900 hrs 22/06/2022 to 0930 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 63 MW at 0900 hrs.
[2.] From 1700 hrs 22/06/2022 to 1930 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 903 MW at 1730 hrs.
[3.] From 2000 hrs 22/06/2022 to 2200 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1003 MW at 2000 hrs.
AEMO is seeking a market response.
AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0830 hrs on 22/06/2022.
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the QLD Region on 22/06/2022
The Forecast LOR3 condition in the QLD region advised in AEMO Electricity Market Notice No. 98725 has been updated at 1330 hrs to the following:
[1.] From 1730 hrs 22/06/2022 to 1930 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 411 MW at 1800 hrs.
[2.] From 2000 hrs 22/06/2022 to 2200 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 412 MW at 2000 hrs.
AEMO is seeking a market response.
AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1700 hrs on 22/06/2022.
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region beginning on 22/06/2022
The Forecast LOR3 condition in the NSW region advised in AEMO Electricity Market Notice No. 98724 has been updated at 1330 hrs to the following:
[1.] From 0900 hrs 22/06/2022 to 0930 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 63 MW at 0900 hrs.
[2.] From 1730 hrs 22/06/2022 to 1930 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 411 MW at 1800 hrs.
[3.] From 2000 hrs 22/06/2022 to 2200 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1003 MW at 2000 hrs.
[4.] From 0130 hrs 23/06/2022 to 0230 hrs 23/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 196 MW at 0130 hrs.
AEMO is seeking a market response.
AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0830 hrs on 22/06/2022.
AEMO Operations