Market Notices

53566POWER SYSTEM EVENTS30/05/2016 02:38:40 PM

Cancellation - Non-credible contingency event - Victoria region - Monday, 30 May 2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation Non-credible contingency event - Victoria region - Monday, 30 May 2016

Jeeralang No 2 220 kV Busbar tripped at 1339 hrs in the Victoria region.

Jeeralang No 2 220 kV Busbar returned to service at 1425 hrs.

The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

The following constraint sets have been revoked at 1430 hrs

V-JL_BUS 2 and CA_SPS_465E4858


Manager NEM Real Time Operations

53565POWER SYSTEM EVENTS30/05/2016 02:13:54 PM

Non-credible contingency event - Victoria region - Monday, 30 May 2016

AEMO ELECTRICITY MARKET NOTICE

Non-credible contingency event - Victoria region - Monday, 30 May 2016

Jeeralang No 2 220 kV Busbar tripped at 1339 hrs in the Victoria region.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.

To manage power system security for this event the following constraint sets have been invoked.

V-JL_BUS 2 and CA_SPS_465E4858


Manager NEM Real Time Operations
53548MARKET SYSTEMS27/05/2016 03:44:16 PM

Lan-2-Lan VPN service restored to internet access point within AEMO QLD Datacenter

AEMO Telstra service outage to our internet access point within the AEMO QLD datacentre is now restored.

Impacts:
Participants connected to the AEMO QLD datacentre internet access point may have experienced issues as a result of the outage.
This issue has been resolved and the service is now available for use.

User Requirements:
Participants are reminded that service is restored to the QLD datacentre.
Both NSW and QLD datacentres are available for use and Participants can remain connected to their current internet access point.

Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.

Enterprise Technology Services
53546MARKET SYSTEMS27/05/2016 09:19:16 AM

Lan-2-Lan VPN service outage to internet access point within AEMO QLD Datacenter

AEMO is currently experiencing a Telstra service outage to our internet access point within the AEMO QLD datacenter

Impacts:
Lan-2-Lan VPN Participants
Participants whom have established their VPN connection/s via the AEMO QLD datacenter termination point (202.44.76.10) will be unable to establish a connection.

Remote Access VPN Participants
Participants whom have established their Remote Access VPN connection/s established via the AEMO QLD datacenter termination point (202.44.76.8) will be unable to establish a connection.

User Requirements:
Lan-2-Lan VPN participants are encouraged to failover their VPN connections to the alternate AEMO NSW datacenter termination point (202.44.78.10).
Remote Access VPN Participants are encouraged to ensure they are connecting via the AEMO NSW datacenter VPN endpoint (202.44.78.8).

Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.

Enterprise Technology Services
53528POWER SYSTEM EVENTS26/05/2016 04:39:17 PM

Update - Non-credible contingency event - SA region - 26/05/2016

AEMO ELECTRICITY MARKET NOTICE

Update - Non-credible contingency event - SA region - 26/05/2016

Update to Market Notice 53526

At 0851 hrs the South East - Tailem Bend No. 1 275 kV Line and the South East No. 1 275 kV SVC tripped.

At 0930 hrs the South East - Tailem Bend No. 1 275 kV Line was returned to service
At 1617 hrs the South East No. 1 275 kV SVC was returned to service

The following Constraint Sets were revoked at 1630 hrs.

S-SE_VC_1
V-2RP

See the AEMO Network Outage Scheduler (NOS) for further information

The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.

Manager NEM Real Time Operations
53526POWER SYSTEM EVENTS26/05/2016 09:14:35 AM

Non-credible contingency event - SA region - 26/05/2016

AEMO ELECTRICITY MARKET NOTICE

Non-credible contingency event - SA region - 26/05/2016

At 0851 hrs the South East Tailem Bend No. 1 275 kV Line and the South East No. 1 275 kV SVC tripped.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.


The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
53523MARKET SYSTEMS25/05/2016 07:18:16 PM

Planned System Maintenance (Site Transfer) on Market Settlement and Transfer Solutions (MSATS) Completed

Change Number: CHG0038481

Notification issued to: Market Notice


Notification Type: Completed

Change Type: Normal

Service/ Component: Market Settlements & Transfer System

Change Title: Planned System Maintenance (Site Transfer) on Market Settlement and Transfer Solutions (MSATS)

Change Description:
Transfer completed successfully

Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
53520MARKET SYSTEMS25/05/2016 02:22:23 PM

Planned System Change - EMMS Pre-Production: Generator Ramp Rate Rule Change

Change Number: CHG0039229

Notification issued to: Market Notice

Notification Type: Initial

Change Type: Normal

Service/ Component: Electricity Market Management System

Change Title: Planned System Change - EMMS Pre-Production: Generator Ramp Rate Rule Change

Change Start Date & Time: 30/05/2016 10:00:00 AEST

Change End Date & Time: 30/05/2016 12:00:00 AEST


Change Description:

This change is to support the new generator ramp rate rules starting on 1st July 2016.

As part of this change AEMO will publish data informing Participants of their Minimum Ramp Rates including Generator DUID and individual unit max capacities. (Refer to the AEMO Tech Spec 931 issued 18th March 2016 for more information.)

The new minimum Ramp Rates will become effective and be used in validation from trading day 08/06/16 in Pre-Production and from 01/07/16 in Production.

Environment: Pre-Production

Participant Impact and Requirements:

This rule change results in some DUIDs having a changed Minimum Ramp Rate used in offer validation. AEMO encourages participants to validate their own offering systems in Pre-Production before the Production implementation date.

AEMO reminds participants to ensure that any previously accepted offers are revised for compliance with the new Minimum Ramp Rate. AEMO will contact Participants if they are potentially in breach of the Minimum Ramp Rate rule requirements before the rule becomes effective.

Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
53519MARKET SYSTEMS25/05/2016 02:15:35 PM

Planned System Outage - Gas Supply Hub - Moomba Trading Locations Update in Production

Change Number: CHG0038899

Notification issued to: Market Notice

Notification Type: Initial

Change Type: Normal

Service/ Component: Gas Supply Hub

Change Title: Planned System Outage - Gas Supply Hub - Moomba Trading Locations Update in Production

Change Start Date & Time: 31/05/2016 19:00:00 AEST

Change End Date & Time: 31/05/2016 22:00:00 AEST


Outage Start Date & Time: 31/05/2016 19:00:00 AEST

Outage End Date & Time: 31/05/2016 22:00:00 AEST


Change Description:

This change is implemented for Gas Supply Hub Moomba project to update 2 new trading locations and to add a Spread product between Moomba and Wallumbilla to facilitate trading between the two markets.

Environment: Production

Participant Impact and Requirements:

Awareness of this outage. Outage is expected and access will be restricted during the times mentioned in the outage section.

Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm