58487RESERVE NOTICE05/05/2017 05:33:18 AM

Cancellation of the Forecast (LOR3) condition in the Vic region - STPASA

AEMO ELECTRICITY MARKET NOTICE

Cancellation of the Forecast (LOR3) condition in the Vic region - STPASA

The Forecast LOR3 condition in the Vic Region advised in AEMO Electricity Market Notice No.58483 is cancelled at 0530 hrs 05/05/2017.


Manager NEM Real Time Operations
58484RESERVE NOTICE04/05/2017 08:20:55 PM

Forecast Lack Of Reserve Level 3 (LOR3) in the SA region - STPASA

AEMO ELECTRICITY MARKET NOTICE

Forecast Lack Of Reserve Level 3 (LOR3) in the SA region - STPASA

Under the NER Cl 4.8.4(d), AEMO considers that Customer load would be interrupted in order to maintain or restore the security of the power system in SA Region, for the following period,

AEMO declares a Forecast LOR3 condition for the SA Region.
From 1730 hrs to 1800 hrs 11/05/2017

The maximum load forecast to be interrupted is 37 MW at 1730 hrs 11/05/2017

AEMO is seeking a market response.

AEMO will determine the latest time at which it would need to intervene through a AEMO intervention event.

Manager NEM Real Time Operations
58483RESERVE NOTICE04/05/2017 08:20:39 PM

Forecast Lack Of Reserve Level 3 (LOR3) in the Vic Region - STPASA

AEMO ELECTRICITY MARKET NOTICE

Forecast Lack Of Reserve Level 3 (LOR3) in the Vic Region - STPASA

Under the NER Cl 4.8.4(d), AEMO considers that Customer load would be interrupted in order to maintain or restore the security of the power system in Vic Region, for the following period,

AEMO declares a Forecast LOR3 condition for the Vic Region.
From 1730 hrs to 1800 hrs 11/05/2017

The maximum load forecast to be interrupted is 37 MW at 1730 hrs 11/05/2017

AEMO is seeking a market response.

AEMO will determine the latest time at which it would need to intervene through a AEMO intervention event.

Manager NEM Real Time Operations
58480RESERVE NOTICE04/05/2017 05:06:02 PM

STPASA - Update of the Forecast Lack of Reserve Level 2 (LOR2) in the Victoria Region on 10 and 11 May 2017

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the Vic region advised in AEMO Electricity Market Notice No. 58475 has been updated at 1600 hrs 04/05/2017 to the following:

1. From 1730 hrs to 1900 hrs on 10/05/2017.
The contingency capacity reserve required is 594 MW.
The minimum reserve available is 519 MW.

2. From 0700 hrs to 1030 hrs on 11/05/2017.
The contingency capacity reserve required is 594 MW.
The minimum reserve available is 311 MW.

3. From 1330 hrs to 2030 hrs on 11/05/2017.
The contingency capacity reserve required is 594 MW.
The minimum reserve available is 0 MW.

AEMO is seeking a market response.

AEMO will determine the latest time at which they would need to intervene through an AEMO intervention event.

Daniel Ghantous
AEMO Operations
58479RESERVE NOTICE04/05/2017 05:05:45 PM

STPASA - Update of the Forecast Lack of Reserve Level 2 (LOR2) in the SA Region on 11/05/2017

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 58476 has been updated at 1600 hrs 04/05/2017 to the following:

1. From 0800 hrs to 0830 hrs on 11/05/2017.
The contingency capacity reserve required is 350 MW.
The minimum reserve available is 311 MW.

2. From 1730 hrs to 1800 hrs on 11/05/2017.
The contingency capacity reserve required is 350 MW.
The minimum reserve available is 2 MW.

AEMO is seeking a market response.

AEMO will determine the latest time at which they would need to intervene through an AEMO intervention event.

Daniel Ghantous
AEMO Operations
58476RESERVE NOTICE04/05/2017 03:18:15 PM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 11/05/2017

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(c) of the National Electricity Rules for the SA region for the following period:

From 1730 hrs to 1800 hrs on 11/05/2017.
The contingency capacity reserve required is 350 MW.
The minimum reserve available is 111 MW.

AEMO is seeking a market response.

AEMO will determine the latest time at which they would need to intervene through an AEMO intervention event.

Daniel Ghantous
AEMO Operations
58475RESERVE NOTICE04/05/2017 03:17:58 PM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the Victoria Region on 10 and 11 May 2017

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(c) of the National Electricity Rules for the VIC region for the following periods:

1. From 1730 hrs to 1900 hrs on 10/05/2017.
The contingency capacity reserve required is 594 MW.
The minimum reserve available is 506 MW.

2. From 0700 hrs to 1030 hrs on 11/05/2017.
The contingency capacity reserve required is 594 MW.
The minimum reserve available is 357 MW.

3. From 1400 hrs to 1600 hrs on 11/05/2017.
The contingency capacity reserve required is 594 MW.
The minimum reserve available is 512 MW.

4. From 1630 hrs to 2000 hrs on 11/05/2017.
The contingency capacity reserve required is 594 MW.
The minimum reserve available is 0 MW.

AEMO is seeking a market response.

AEMO will determine the latest time at which they would need to intervene through an AEMO intervention event.

Daniel Ghantous
AEMO Operations
58382RESERVE NOTICE13/04/2017 12:13:55 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia Region on 18/04/2017

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 58381 is cancelled at 1200 hrs 13/04/2017.

No LOR2 condition is currently forecast in the STPASA period.

Daniel Ghantous
AEMO Operations
58381RESERVE NOTICE13/04/2017 10:51:27 AM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia Region on 18/04/2017

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(c) of the National Electricity Rules for the South Australia region for the following period:

From 1800 hrs to 1930 hrs on 18/04/2017.
The contingency capacity reserve required is 220 MW.
The minimum reserve available is 191 MW.

Daniel Ghantous