PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region on 14/06/2022
The Forecast LOR3 condition in the NSW region advised in AEMO Electricity Market Notice No. 97103 has been updated at 2300 hrs to the following:
[1.] From 1730 hrs 14/06/2022 to 2030 hrs 14/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 546 MW at 1900 hrs.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which they would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 3 (LOR3) in the QLD Region on 13/06/2022
The Forecast LOR3 condition in the QLD region advised in AEMO Electricity Market Notice No. 97115 is cancelled at 1800 hrs 13/06/2022.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the QLD Region on 14/06/2022
The Forecast LOR3 condition in the QLD region advised in AEMO Electricity Market Notice No. 97067 has been updated at 1647 hrs to the following:
[1.] From 0630 hrs 14/06/2022 to 0800 hrs 14/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 712 MW at 0700 hrs.
[2.] From 1700 hrs 14/06/2022 to 2230 hrs 14/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 935 MW at 1830 hrs.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which they would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the QLD Region on 13/06/2022
The Forecast LOR3 condition in the QLD region advised in AEMO Electricity Market Notice No. 97109 has been updated at 1600 hrs to the following:
[1.] From 1730 hrs 13/06/2022 to 1930 hrs 13/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 165 MW at 1800 hrs.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the QLD Region on 13/06/2022
The Forecast LOR3 condition in the QLD region advised in AEMO Electricity Market Notice No. 97099 has been updated at 1547 hrs to the following:
[1.] From 1700 hrs 13/06/2022 to 2300 hrs 13/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 982 MW at 1800 hrs.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region on 14/06/2022
The Forecast LOR3 condition in the NSW region advised in AEMO Electricity Market Notice No. 97069 has been updated at 1447 hrs to the following:
[1.] From 2000 hrs 14/06/2022 to 2030 hrs 14/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 50 MW at 2000 hrs.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which they would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the QLD Region on 13/06/2022
The Forecast LOR3 condition in the QLD region advised in AEMO Electricity Market Notice No. 97082 has been updated at 1447 hrs to the following:
[1.] From 1700 hrs 13/06/2022 to 2300 hrs 13/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1147 MW at 1730 hrs.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the QLD Region on 13/06/2022
The Forecast LOR3 condition in the QLD region advised in AEMO Electricity Market Notice No. 97061 has been updated at 1346 hrs to the following:
[1.] From 1700 hrs 13/06/2022 to 2030 hrs 13/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 809 MW at 1730 hrs.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region on 14/06/2022
AEMO declares a Forecast LOR3 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 1800 hrs to 2030 hrs 14/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 409 MW at 1900 hrs.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.