106323RESERVE NOTICE06/03/2023 08:00:23 PM

Cancellation of Actual (LOR1) condition in the NSW region - 06/03/2023

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the NSW region - 06/03/2023

The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.106308 is cancelled at 2000 hrs 06/03/2023.

Manager NEM Real Time Operations
106308RESERVE NOTICE06/03/2023 04:23:20 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 06/03/2023

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 06/03/2023

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1600 hrs.

The Actual LOR1 condition [is forecast to exist until 1900 hrs.

The forecast capacity reserve requirement is 1365 MW.
The minimum capacity reserve available is 794 MW.

Manager NEM Real Time Operations
106175CONSTRAINTS01/03/2023 11:54:17 AM

Update to system strength requirements in North Queensland

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 102074

AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland.
Due to commissioning of Kaban wind farm in Far North Queensland, the system normal equations have been revised to include following combinations.

-If Stanwell >=2, Stanwell + Calllide >=3, Gladstone >= 1, Stanwell + Callide + Gladstone >= 7, Kareeya >=0, Haughton Syncon status = ON/OFF, North Queensland load >=250 MW,
Ross+FNQ load >=100 MW, limit Kaban Windfarm to 100% (with Haughton Syncon ON), 0% (with Haughton Syncon Syncon OFF) and no limit to other NQLD Plants.

A revision to the constraint equations will be implemented at 1400 hrs on Wednesday 1st March 2023.

The new combinations have now published in a limits advice document on AEMO's website. For more information refer to the new limits advice: https://www.aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice

This advice contains all the combinations for Queensland for system normal cases. Additional information has been included in the limit advice to clarify the requirement to disconnect all inverters/turbines under certain system conditions.

The constraint equation in the Q-NIL set of the form below will be modified:

Q_NIL_STRGTH_XXXX
Q_NIL_STRGTH_XXXX_I


AEMO Operations
106089RESERVE NOTICE23/02/2023 07:43:08 PM

Cancellation of Actual (LOR1) condition in the SA region - 23/02/2023

AEMO ELECTRICITY MARKET NOTICE

The Actual LOR1 Condition in the SA Region advised in AEMO Electricity Market Notice No.106087 is cancelled at 1942 hrs 23/02/2023

Manager NEM Real Time Operations
106087RESERVE NOTICE23/02/2023 06:49:17 PM

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region on 23/02/2023

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 23/02/2023

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the SA region from 1830 hrs.

The Actual LOR1 condition is forecast to exist until 1930 hrs.

The forecast capacity reserve requirement is 587 MW.
The minimum capacity reserve available is 474 MW.


Manager NEM Real Time Operations
105936CONSTRAINTS17/02/2023 05:07:05 PM

Changes to Murraylink Very Fast Runback and constraints in Victoria

AEMO ELECTRICITY MARKET NOTICE

The Murraylink Very Fast Runback (VFRB) scheme is being modified to increase the capacity of the network due to the increase in generation in the area. The scheme will be changed so Murraylink VFRB can be activated / de-activated depending on the time of day on the monitored 220kV lines in north-west Victoria.

The changes to the scheme will be activated and constraint equaiton modified at 1200hrs Monday 20th February 2023. The following system normal constraint equations will be modified:
V^^V_NIL_KGTS
V^^V_NIL_KGTS_2
V>>SML_NIL_7A
V>>SML_NIL_7B
V>>SML_NIL_7C
V>>V_NIL_13
V>>V_NIL_14
V>>V_NIL_20
V>>V_NIL_21
V>>V_NIL_22
V>>V_NIL_23
V>>V_NIL_24
V>>V_NIL_25
V>>V_NIL_26
V>>V_NIL_26_1
V>>V_NIL_26A
V>>V_NIL_26A_1

For full details on the factors on constraint equations and all the constrint equation changes - these have now been loaded into AEMO's pre-production systems.

Ben Blake
AEMO Operations
105908RESERVE NOTICE16/02/2023 07:49:47 PM

Cancellation of Actual (LOR1) condition in the SA region - 16/02/2023

AEMO ELECTRICITY MARKET NOTICE

The Actual LOR1 Condition in the SA Region advised in AEMO Electricity Market Notice No.105907 is cancelled at 1945 hrs 16/02/2023

Manager NEM Real Time Operations
105907RESERVE NOTICE16/02/2023 07:20:12 PM

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region on 16/02/2023

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 16/02/2023

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the SA region from 1900 hrs.

The Actual LOR1 condition is forecast to exist until 1930 hrs.

The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 591 MW.


Manager NEM Real Time Operations
105906RESERVE NOTICE16/02/2023 06:55:25 PM

Cancellation of Actual (LOR1) condition in the VIC region - 16/02/2023

AEMO ELECTRICITY MARKET NOTICE

The Actual LOR1 Condition in the VIC Region advised in AEMO Electricity Market Notice No.105905 is cancelled at 1855 hrs 16/02/2023

Manager NEM Real Time Operations