Correction - Non-credible contingency event - Silverton - NSW region - 28/09/2021
Correction to Market Notice 91277
At 2233 hrs the Broken Hill - Silverton X6 220 kV Line, the Silverton 220kV/33kV Transformer (which disconnected Silverton Wind Farm) and the Broken Hill Solar Farm tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Refer to AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
Non-credible contingency event - Silverton - NSW region - 28/09/2021
Non-credible contingency event - Silverton - NSW region - 28/09/2021
At 2233 hrs the Broken Hill - Silverton X6 220 kV Line, the Silverton 220kV/33kV Transformer (which disconnected Silverton Wind Farm) and the Silverton Solar Farm tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Refer to AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
Non-credible contingency event - SA region - 28/09/2021
Non-credible contingency event - SA region - 28/09/2021
At 1555 hrs the Davenport West 275 kV Bus, Davenport to Mt Lock 275 kV Line and Davenport No2 Synchronous Condenser tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
The following constraint set was invoked at 1605 hrs
S-DVLK_BC-2CP
The constraint sets contain equations with the following interconnector on the LHS:
V-S-MNSP1
V-SA
Refer to AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
Update - Non-credible contingency event - Torrens Island 66 kV East Bus - SA region - 22/09/2021
Update - Non-credible contingency event - Torrens Island 66 kV East Bus - SA region - 22/09/2021
At 1740 hrs the Torrens Island 66 kV East bus tripped. The bus was returned to service at 1846 hrs.
The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Refer AEMO Electricity Market Notice 90963
Manager NEM Real Time Operations
Non-credible contingency event - SA region - 22/09/2021
Non-credible contingency event - SA region - 22/09/2021
At 1740 hrs the Torrens Island 66 kV East busbar tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Update - Non-credible contingency event - VIC region - 22/09/2021
Update - Non-credible contingency event - VIC region - 22/09/2021
At 0916 hrs the Springvale No. 1 220 kV busbar tripped.
Refer AEMO ELECTRICITY MARKET NOTICE MN90937 and MN90939
At 0925 hrs the Springvale No. 1 220 kV busbar was returned to service.
Further investigation has identified that this was a credible contingency event.
Manager NEM Real Time Operations
Non-credible contingency event - SA region - 22/09/2021
Non-credible contingency event - SA region - 22/09/2021
At 1134 hrs the No. 1 and No. 2 275 kV Static Var Compensator (SVC) at South East Substation tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
The following constraint set was invoked at 1145 hrs
S-X_SEVC2+PAVC
The constraint sets contain equations with the following interconnector on the LHS:
V-S-MNSP1
V-SA
Refer to AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
Update - Non-credible contingency event - VIC region - 22/09/2021
Update - Non-credible contingency event - VIC region - 22/09/2021
At 0916 hrs the Springvale No. 1 220 kV busbar tripped.
Refer AEMO ELECTRICITY MARKET NOTICE MN90937
At 0925 hrs the Springvale No. 1 220 kV busbar was returned to service.
The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Non-credible contingency event - VIC region - 22/09/2021
Non-credible contingency event - VIC region - 22/09/2021
At 0916 hrs the Springvale No. 1 220 kV busbar tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations