Filter by category
Filter by Date
Lan-2-Lan VPN service outage to internet access point within AEMO QLD Datacenter
Impacts:
Lan-2-Lan VPN Participants
Participants whom have established their VPN connection/s via the AEMO QLD datacenter termination point (202.44.76.10) will be unable to establish a connection.
Remote Access VPN Participants
Participants whom have established their Remote Access VPN connection/s established via the AEMO QLD datacenter termination point (202.44.76.8) will be unable to establish a connection.
User Requirements:
Lan-2-Lan VPN participants are encouraged to failover their VPN connections to the alternate AEMO NSW datacenter termination point (202.44.78.10).
Remote Access VPN Participants are encouraged to ensure they are connecting via the AEMO NSW datacenter VPN endpoint (202.44.78.8).
Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
Enterprise Technology Services
Planned System Maintenance (Site Transfer) on Market Settlement and Transfer Solutions (MSATS) Completed
Notification issued to: Market Notice
Notification Type: Completed
Change Type: Normal
Service/ Component: Market Settlements & Transfer System
Change Title: Planned System Maintenance (Site Transfer) on Market Settlement and Transfer Solutions (MSATS)
Change Description:
Transfer completed successfully
Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
Planned System Change - EMMS Pre-Production: Generator Ramp Rate Rule Change
Notification issued to: Market Notice
Notification Type: Initial
Change Type: Normal
Service/ Component: Electricity Market Management System
Change Title: Planned System Change - EMMS Pre-Production: Generator Ramp Rate Rule Change
Change Start Date & Time: 30/05/2016 10:00:00 AEST
Change End Date & Time: 30/05/2016 12:00:00 AEST
Change Description:
This change is to support the new generator ramp rate rules starting on 1st July 2016.
As part of this change AEMO will publish data informing Participants of their Minimum Ramp Rates including Generator DUID and individual unit max capacities. (Refer to the AEMO Tech Spec 931 issued 18th March 2016 for more information.)
The new minimum Ramp Rates will become effective and be used in validation from trading day 08/06/16 in Pre-Production and from 01/07/16 in Production.
Environment: Pre-Production
Participant Impact and Requirements:
This rule change results in some DUIDs having a changed Minimum Ramp Rate used in offer validation. AEMO encourages participants to validate their own offering systems in Pre-Production before the Production implementation date.
AEMO reminds participants to ensure that any previously accepted offers are revised for compliance with the new Minimum Ramp Rate. AEMO will contact Participants if they are potentially in breach of the Minimum Ramp Rate rule requirements before the rule becomes effective.
Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
Planned System Outage - Gas Supply Hub - Moomba Trading Locations Update in Production
Notification issued to: Market Notice
Notification Type: Initial
Change Type: Normal
Service/ Component: Gas Supply Hub
Change Title: Planned System Outage - Gas Supply Hub - Moomba Trading Locations Update in Production
Change Start Date & Time: 31/05/2016 19:00:00 AEST
Change End Date & Time: 31/05/2016 22:00:00 AEST
Outage Start Date & Time: 31/05/2016 19:00:00 AEST
Outage End Date & Time: 31/05/2016 22:00:00 AEST
Change Description:
This change is implemented for Gas Supply Hub Moomba project to update 2 new trading locations and to add a Spread product between Moomba and Wallumbilla to facilitate trading between the two markets.
Environment: Production
Participant Impact and Requirements:
Awareness of this outage. Outage is expected and access will be restricted during the times mentioned in the outage section.
Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
Planned System Change - MSATS Pre-Production Mid-Year 2016 - Release 46.85
Notification issued to: Market Notice
Notification Type: Initial
Change Type: Normal
Service/ Component: MSATS - Consumer Administration and Transfer Solution
Change Title: Planned System Change - MSATS Pre-Production Mid-Year 2016 - Release 46.85
Change Start Date & Time: 01/06/2016 09:00:00 AEST
Change End Date & Time: 01/06/2016 12:00:00 AEST
Outage Start Date & Time: 01/06/2016 09:00:00 AEST
Outage End Date & Time: 01/06/2016 12:00:00 AEST
Change Description:
The MSATS Pre-Production system will be upgraded with the release 46.85 as per the change notice 930 issued on 16th March 2016.
Note: There are no schema changes associated with this release
Environment: Pre-Production
Participant Impact and Requirements:
Awareness of this Outage. MSATS Pre-Production environment will be unavailable during the outage times mentioned above.
Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
CHG0038847: Planned System Change - EMMS Production Mid 2016 Release
Notification issued to: Market Notice
Notification Type: Initial
Change Type: Normal
Service/ Component: Electricity Market Management System
Change Title: Planned System Change - EMMS Production Mid 2016 Release
Change Start Date & Time: 23/05/2016 09:00:00 AEST
Change End Date & Time: 26/05/2016 17:00:00 AEST
Change Description:
As per Change Notice 931 issued on 18/03/2016 the EMMS Mid Year 2016 release will be implemented as per the planned start and end dates mentioned above.
Environment: Production
Participant Impact and Requirements:
Awareness of this Change. There should be no noticeable impact to participants or users of the EMMS systems.
Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
Cancellation of the Reclassification of a Non-Credible Contingency Event: Farrell - John Butters 220 kV Line and the Farrell - Rosebery Tee Queenstown - Newton 110 kV Line in Tasmania due to Lightning.
Cancellation of the Reclassification of a Non-Credible Contingency Event: Farrell - John Butters 220 kV Line and the Farrell - Rosebery Tee Queenstown - Newton 110 kV Line in Tasmania due to Lightning.
Refer AEMO Electricity Market Notice 53432
There is no longer any lightning activity in the vicinity of the Farrell - John Butters 220 kV Line and the Farrell - Rosebery Tee Queenstown - Newton 110 kV Line.
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 2310 hrs.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Farrell - John Butters 220 kV Line and the Farrell - Rosebery Tee Queenstown - Newton 110 kV Line in Tasmania due to Lightning.
Reclassification of a Non-Credible Contingency Event: Farrell - John Butters 220 kV Line and the Farrell - Rosebery Tee Queenstown - Newton 110 kV Line in Tasmania due to Lightning.
Lightning is occurring near the Farrell - John Butters 220 kV Line and the Farrell - Rosebery Tee Queenstown - Newton 110 kV Line.
AEMO considers the simultaneous trip of those circuits to now be more likely.
Therefore AEMO has reclassified this as a credible contingency event from 2210 hrs 19/05/16 until further notice.
Manager NEM Real Time Operations
[EventId:201605191025_confirmed] Prices for interval 19-May-2016 10:25 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1709 hrs on 19 May 2016
PRICES ARE NOW CONFIRMED for dispatch interval 19-May-2016 10:25.
In accordance with Market Notice 53415 AEMO has reviewed this dispatch interval and determined that:
- Over-Constrained Dispatch has been resolved for this interval
Changed Prices ($/MWh)
TYPE
Region Original Adjusted
Price Price
ENERGY
TAS1 $13,800.00 $345.80
RAISE5MIN
TAS1 $13,800.00 $4.20
RAISE60SEC
TAS1 $13,800.00 $68.30
RAISE6SEC
TAS1 $13,800.00 $162.35
RAISEREG
TAS1 $13,800.00 $4.20
This is an AEMO autogenerated Market Notice.