Cancellation of the Reclassification of a Non-Credible Contingency Event: Farrell - Sheffield No. 1 and No. 2 220 kV Lines in Tasmania due to Lightning.
Cancellation of the Reclassification of a Non-Credible Contingency Event: Farrell - Sheffield No. 1 and No. 2 220 kV Lines in Tasmania due to Lightning.
Refer AEMO Electricity Market Notice 53412
There is no longer any lightning activity in the vicinity of the Farrell - Sheffield No. 1 and No. 2 220 kV Lines.
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 1040 hrs.
Constraint Sets T-FASH_N-2_HM_C F-T-FASH_N-2 revoked @ 1050.
Manager NEM Real Time Operations
Cancellation of the Reclassification of a Non-Credible Contingency Event: Farrell - John Butters 220 kV Line and the Farrell - Rosebery Tee Queenstown - Newton 110 kV Line in Tasmania due to Lightning.
Cancellation of the Reclassification of a Non-Credible Contingency Event: Farrell - John Butters 220 kV Line and the Farrell - Rosebery Tee Queenstown - Newton 110 kV Line in Tasmania due to Lightning.
Refer AEMO Electricity Market Notice 53410
There is no longer any lightning activity in the vicinity of the Farrell - John Butters 220 kV Line and the Farrell - Rosebery Tee Queenstown - Newton 110 kV Line.
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 1040hrs.
Manager NEM Real Time Operations
Cancellation of the Reclassification of a Non-Credible Contingency Event: Farrell - Reece No. 1 and No. 2 220 kV Lines in Tasmania due to Lightning.
Cancellation of the Reclassification of a Non-Credible Contingency Event: Farrell - Reece No. 1 and No. 2 220 kV Lines in Tasmania due to Lightning.
Refer AEMO Electricity Market Notice 53411
There is no longer any lightning activity has ceased in the vicinity of the the Farrell - Reece No. 1 and No. 2 220 kV Lines.
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 1040 hrs.
Constraint Sets F-T-FARE_N-2 revoked.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Chapel Street - Liapootah No. 1 and No. 2 220 kV Lines in Tasmania due to Lightning.
Reclassification of a Non-Credible Contingency Event: Chapel Street - Liapootah No. 1 and No. 2 220 kV Lines in Tasmania due to Lightning.
Lightning is occurring near the Chapel Street - Liapootah No. 1 and No. 2 220 kV Lines.
AEMO considers the simultaneous trip of those circuits to now be more likely.
Therefore AEMO has reclassified this as a credible contingency event from 1040 hrs 19 May 2016 until further notice.
Constraint Set T-CSLI_N-2 invoked
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Farrell - Sheffield No. 1 and No. 2 220 kV Lines in Tasmania due to Lightning.
Reclassification of a Non-Credible Contingency Event: Farrell - Sheffield No. 1 and No. 2 220 kV Lines in Tasmania due to Lightning.
Lightning is occurring near the Farrell - Sheffield No. 1 and No. 2 220 kV Lines.
AEMO considers the simultaneous trip of those circuits to now be more likely.
Therefore AEMO has reclassified this as a credible contingency event from 1015 hrs 19 May 2016 until further notice.
Constraint Sets: F-T-FASH_N-2 T-FASH_N-2_HM_C invoked
These Constraint Sets contain equations with the following interconnector on the LHS.
T-V-MNSP1
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Farrell - Reece No. 1 and No. 2 220 kV Lines in Tasmania due to Lightning.
Reclassification of a Non-Credible Contingency Event: Farrell - Reece No. 1 and No. 2 220 kV Lines in Tasmania due to Lightning.
Lightning is occurring near the Farrell- Reece No. 1 and No. 2 220 kV Lines.
AEMO considers the simultaneous trip of those circuits to now be more likely.
Therefore AEMO has reclassified this as a credible contingency event from 1015 hrs 19 May 2016 until further notice.
Constraint Set F-T-FARE_N-2 invoked.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Farrell - John Butters 220 kV Line and the Farrell - Rosebery Tee Queenstown - Newton 110 kV Line in Tasmania due to Lightning.
Reclassification of a Non-Credible Contingency Event: Farrell - John Butters 220 kV Line and the Farrell - Rosebery Tee Queenstown - Newton 110 kV Line in Tasmania due to Lightning.
Lightning is occurring near the Farrell - John Butters 220 kV Line and the Farrell - Rosebery Tee Queenstown - Newton 110 kV Line.
AEMO considers the simultaneous trip of those circuits to now be more likely.
Therefore AEMO has reclassified this as a credible contingency event from 1010 hrs 19 MAY 2016 until further notice.
Manager NEM Real Time Operations
[EventId:201605190100_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 19 May 2016 01:00
Issued by Australian Energy Market Operator Ltd at 0100 hrs on 19 May 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 19 May 2016.
Refer to market notice: 53406
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.
The negative residue constraint NRM_SA1_VIC1 ceased operating at 0100 hrs on 19 May 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201605182340_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 18 May 2016 23:40
Issued by Australian Energy Market Operator Ltd at 2340 hrs on 18 May 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 18 May 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.
The negative residue constraint set NRM_SA1_VIC1 commenced operating from 2340 hrs on 18 May 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.