Reclassification of a Non-Credible Contingency Event: Norwood - Scottsdale - Derby 110 kV Line and Norwood - Scottsdale 110 kV Line in Tasmania due to Lightning.
Reclassification of a Non-Credible Contingency Event: Norwood - Scottsdale - Derby 110 kV Line and Norwood - Scottsdale 110 kV Line in Tasmania due to Lightning.
Lightning is occurring near the Norwood - Scottsdale - Derby 110 kV Line and Norwood - Scottsdale 110 kV Line.
AEMO considers the simultaneous trip of those circuits to now be more likely.
Therefore AEMO has reclassified this as a credible contingency event from 1730 hrs 12 July 2016 until further notice.
Manager NEM Real Time Operations
Cancellation of the Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No.1 and No.3 220 kV Lines in Victoria due to Lightning.
Cancellation of the Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No.1 and No.3 220 kV Lines in Victoria due to Lightning.
Refer AEMO Electricity Market Notice 54441
There is no longer any lightning activity in the vicinity of the Dederang - Glenrowan No.1 and No.3 220 kV Lines.
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 1650 hrs.
Constraint Set V-DDGN_N-2 revoked.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No. 1 and No. 3 220 kV Lines in Victoria due to Lightning.
Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No. 1 and No. 3 220 kV Lines in Victoria due to Lightning.
Lightning is occurring near the Dederang - Glenrowan No. 1 and No. 3 220 kV Lines.
AEMO considers the simultaneous trip of those circuits to now be more likely.
Therefore AEMO has reclassified this as a credible contingency event from 1450hrs 12 July 2016 until further notice.
Constraint Set V-DDGN_N-2 invoked.
This Constraint Set contains equations with the following interconnectors on the LHS.
V-S-MNSP1
V-SA
VIC1-NSW1
Manager NEM Real Time Operations
Cancellation of the Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No.1 and No.3 220 kV Lines in Victoria due to Lightning.
Cancellation of the Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No.1 and No.3 220 kV Lines in Victoria due to Lightning.
Refer AEMO Electricity Market Notice 54436
There is no longer any lightning activity in the vicinity of the Dederang - Glenrowan No.1 and No.3 220 kV Lines.
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 1415 hrs.
Constraint Set V-DDGN_N-2 revoked.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No. 1 and No. 3 220 kV Lines in Victoria due to Lightning.
Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No. 1 and No. 3 220 kV Lines in Victoria due to Lightning.
Lightning is occurring near the Dederang - Glenrowan No. 1 and No. 3 220 kV Lines.
AEMO considers the simultaneous trip of those circuits to now be more likely.
Therefore AEMO has reclassified this as a credible contingency event from 1330 hrs 12 July 2016 until further notice.
Constraint Set V-DDGN_N-2 invoked.
This Constraint Set contains equations with the following interconnectors on the LHS.
V-S-MNSP1
V-SA
VIC1-NSW1
Manager NEM Real Time Operations
Cancellation of the Reclassification of a Non-Credible Contingency Event: Farrell - Sheffield No. 1 and No. 2 220 kV Lines in Tasmania due to Lightning.
Cancellation of the Reclassification of a Non-Credible Contingency Event: Farrell - Sheffield No. 1 and No. 2 220 kV Lines in Tasmania due to Lightning.
Refer AEMO Electricity Market Notice 54416
There is no longer any lightning activity in the vicinity of the Farrell - Sheffield No. 1 and No. 2 220 kV Lines.
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 1025 hrs.
Constraint Sets
F-T-FASH_N-2
F-FASH_N-2_HM_C revoked.
Manager NEM Real Time Operations
Cancellation of the Reclassification of a Non-Credible Contingency Event: Burnie - Sheffield No.2 110 kV and Sheffield - Paloona - Ulverstone 110 kV Lines in Tasmania due to Lightning.
Cancellation of the Reclassification of a Non-Credible Contingency Event: Burnie - Sheffield No.2 110 kV and Sheffield - Paloona - Ulverstone 110 kV Lines in Tasmania due to Lightning.
Refer AEMO Electricity Market Notice 54415
There is no longer any lightning activity in the vicinity of the Burnie - Sheffield No.2 110 kV and Sheffield - Paloona - Ulverstone 110 kV Lines.
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 0930 hrs.
Manager NEM Real Time Operations
Lightning is occurring near the Farrell - Sheffield No. 1 and No. 2 220 kV Lines.
Reclassification of a Non-Credible Contingency Event: Farrell - Sheffield No. 1 and No. 2 220 kV Lines in Tasmania due to Lightning.
Lightning is occurring near the Farrell - Sheffield No. 1 and No. 2 220 kV Lines.
AEMO considers the simultaneous trip of those circuits to now be more likely.
Therefore AEMO has reclassified this as a credible contingency event from 0845 hrs 12 July 2016 until further notice.
Constraint Sets:
F-T-FASH_N-2
F-FASH_N-2_HM_C invoked
These Constraint Sets contain equations with the following interconnector on the LHS.
T-V-MNSP1
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Burnie - Sheffield No.2 110 kV and Sheffield - Paloona - Ulverstone 110 kV Lines in Tasmania due to Lightning.
Reclassification of a Non-Credible Contingency Event: Burnie - Sheffield No.2 110 kV and Sheffield - Paloona - Ulverstone 110 kV Lines in Tasmania due to Lightning.
Lightning is occurring near the Burnie - Sheffield No.2 110 kV and Sheffield - Paloona - Ulverstone 110 kV Lines.
AEMO considers the simultaneous trip of those circuits to now be more likely.
Therefore AEMO has reclassified this as a credible contingency event from 0805 hrs 12 July 2016 until further notice.
Manager NEM Real Time Operations