Actual Lack Of Reserve Level 1 (LOR1) in the Qld Region - 12/02/17
Actual Lack Of Reserve Level 1 (LOR1) in the Qld Region - 12/02/17
An Actual LOR1 condition has been declared for the Qld region from 1600 hrs.
The Actual LOR1 condition is forecast to exist until 1730 hrs
The contingency capacity reserve required is 1123 MW
The minimum reserve available is 978 MW
Manager NEM Real Time Operations
Non-credible contingency event - NSW region - Saturday, 11 February 2017
Non-credible contingency event - NSW region - Saturday, 11 February 2017
At 2122 hrs the Wagga 330 kV A Busbar and
the 051 Wagga - Lower Tumut 330 kV transmission line,
the 63 Wagga - Darlington Pt. 330 kV transmission line
the 64 LowerTumut - Upper Tumut 330 kV transmission line
the 66 Murray - LowerTumut 330 kV transmission line
tripped.
The X5 220 kV line and
07 Lower Tumut - Canberra 330 kV lines deloaded.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Cancellation - Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region - 11-02-2017
Cancellation - Actual Lack Of Reserve Level 1 (LOR1 in the NSW Region - 11-02-2017
Refer Electricity Market Notice 57412
The Actual LOR1 declared for the NSW region is cancelled from 1820 hrs.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region - 11-02-2017
Actual Lack Of Reserve Level 1 (LOR1 in the NSW Region - 11-02-2017
An Actual LOR1 condition has been declared for the NSW region from 1210 hrs.
The Actual LOR1 condition is forecast to exist until 1500 hrs
The contingency capacity reserve required is 1330 MW
The minimum reserve available is 803 MW
Manager NEM Real Time Operations
Cancellation - Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region - 10-02-2017
Cancellation - Actual Lack Of Reserve Level 1 (LOR1 in the NSW Region - 10-02-2017
Refer Electricity Market Notice 57402
The Actual LOR1 declared for the NSW region is cancelled from 1930 hrs.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region - 10-02-2017
Actual Lack Of Reserve Level 1 (LOR1 in the NSW Region - 10-02-2017
An Actual LOR1 condition has been declared for the NSW region from 1830 hrs.
The Actual LOR1 condition is forecast to exist until 1900 hrs
The contingency capacity reserve required is 1340 MW
The minimum reserve available is 843 MW
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region- 10-02-2017
Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region- 10-02-2017
An Actual LOR1 condition has been declared for the NSW Region from 1250 hrs.
The Actual LOR1 condition is forecast to exist until 2000 hrs
The contingency capacity reserve required is 1345 MW
The minimum LOR1 reserve available is 861 MW
Manager NEM Real Time Operations
Update - Non-credible contingency event - NSW region - Thursday, 9 February 2017
Update - Non-credible contingency event - NSW region - Thursday, 9 February 2017
Refer AEMO Electricity Market Notice 57351
At 1943 hrs the Munmorah 330 kV Main Busbar tripped and the Munmorah -Tuggerah 2M 330 kV transmission line opened at Munmorah.
The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this non credible contingency.
Manager NEM Real Time Operations
Non-credible contingency event - NSW region - Thursday, 9 February 2017
Non-credible contingency event - NSW region - Thursday, 9 February 2017
At 1943 hrs the Munmorah 330 kV Main Busbar tripped and the Munmorah -Tuggerah 2M 330 kV transmission line opened at Munmorah.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations