98229RESERVE NOTICE16/06/2022 06:58:18 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the VIC Region beginning on 17/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the VIC region advised in AEMO Electricity Market Notice No. 98225 has been updated at 1830 hrs to the following:

[1.] From 0730 hrs 17/06/2022 to 0830 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 128 MW at 0730 hrs.

[2.] From 0900 hrs 17/06/2022 to 0930 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 17 MW at 0900 hrs.

[3.] From 1600 hrs 17/06/2022 to 1630 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 435 MW at 1600 hrs.

[4.] From 1700 hrs 17/06/2022 to 0100 hrs 18/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1433 MW at 2000 hrs.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0700 hrs on 17/06/2022.

AEMO Operations
98228RESERVE NOTICE16/06/2022 06:59:07 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region beginning on 17/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the NSW region advised in AEMO Electricity Market Notice No. 98226 has been updated at 1830 hrs to the following:

[1.] From 0730 hrs 17/06/2022 to 0830 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 128 MW at 0730 hrs.

[2.] From 0900 hrs 17/06/2022 to 0930 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 17 MW at 0900 hrs.

[3.] From 1600 hrs 17/06/2022 to 1630 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 435 MW at 1600 hrs.

[4.] From 1700 hrs 17/06/2022 to 0230 hrs 18/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 3007 MW at 2000 hrs.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0700 hrs on 17/06/2022.

AEMO Operations
98227RESERVE NOTICE16/06/2022 06:57:19 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 17/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the SA region advised in AEMO Electricity Market Notice No. 98223 has been updated at 1830 hrs to the following:

[1.] From 0730 hrs 17/06/2022 to 0830 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 128 MW at 0730 hrs.

[2.] From 0900 hrs 17/06/2022 to 0930 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 17 MW at 0900 hrs.

[3.] From 1700 hrs 17/06/2022 to 2100 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 273 MW at 1800 hrs.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0700 hrs on 17/06/2022.

AEMO Operations
98226RESERVE NOTICE16/06/2022 06:33:56 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region beginning on 17/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the NSW region advised in AEMO Electricity Market Notice No. 98221 has been updated at 1800 hrs to the following:

[1.] From 0730 hrs 17/06/2022 to 0830 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 233 MW at 0730 hrs.

[2.] From 1530 hrs 17/06/2022 to 1630 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 428 MW at 1600 hrs.

[3.] From 1700 hrs 17/06/2022 to 0230 hrs 18/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 2995 MW at 2000 hrs.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0700 hrs on 17/06/2022.

AEMO Operations
98225RESERVE NOTICE16/06/2022 06:36:47 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the VIC Region beginning on 17/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the VIC region advised in AEMO Electricity Market Notice No. 98217 has been updated at 1800 hrs to the following:

[1.] From 0730 hrs 17/06/2022 to 0830 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 233 MW at 0730 hrs.

[2.] From 1530 hrs 17/06/2022 to 1630 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 428 MW at 1600 hrs.

[3.] From 1700 hrs 17/06/2022 to 0100 hrs 18/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1435 MW at 2000 hrs.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0700 hrs on 17/06/2022.

AEMO Operations
98223RESERVE NOTICE16/06/2022 06:37:53 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 17/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the SA region advised in AEMO Electricity Market Notice No. 98216 has been updated at 1800 hrs to the following:

[1.] From 0730 hrs 17/06/2022 to 0830 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 219 MW at 0730 hrs.

[2.] From 1700 hrs 17/06/2022 to 2100 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 278 MW at 1800 hrs.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0700 hrs on 17/06/2022.

AEMO Operations
98221RESERVE NOTICE16/06/2022 06:02:42 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region beginning on 17/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the NSW region advised in AEMO Electricity Market Notice No. 98213 has been updated at 1730 hrs to the following:

[1.] From 0730 hrs 17/06/2022 to 0830 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 477 MW at 0730 hrs.

[2.] From 0900 hrs 17/06/2022 to 0930 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 65 MW at 0900 hrs.

[3.] From 1530 hrs 17/06/2022 to 1630 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 451 MW at 1600 hrs.

[4.] From 1700 hrs 17/06/2022 to 0230 hrs 18/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 3026 MW at 2000 hrs.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0700 hrs on 17/06/2022.

AEMO Operations
98217RESERVE NOTICE16/06/2022 05:37:16 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the VIC Region beginning on 17/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the VIC region advised in AEMO Electricity Market Notice No. 98212 has been updated at 1700 hrs to the following:

[1.] From 0730 hrs 17/06/2022 to 0830 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 530 MW at 0730 hrs.

[2.] From 0900 hrs 17/06/2022 to 0930 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 116 MW at 0900 hrs.

[3.] From 1530 hrs 17/06/2022 to 1630 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 495 MW at 1600 hrs.

[4.] From 1700 hrs 17/06/2022 to 0100 hrs 18/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1707 MW at 2000 hrs.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0700 hrs on 17/06/2022.

AEMO Operations
98216RESERVE NOTICE16/06/2022 05:41:55 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region beginning on 17/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the SA region advised in AEMO Electricity Market Notice No. 98211 has been updated at 1700 hrs to the following:

[1.] From 0730 hrs 17/06/2022 to 0830 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 500 MW at 0730 hrs.

[2.] From 0900 hrs 17/06/2022 to 0930 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 116 MW at 0900 hrs.

[3.] From 1600 hrs 17/06/2022 to 1630 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 44 MW at 1600 hrs.

[4.] From 1700 hrs 17/06/2022 to 2300 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 553 MW at 1800 hrs.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0700 hrs on 17/06/2022.

AEMO Operations