Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region.- 20/03/2017
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region.- 20/03/2017
An Actual LOR1 condition has been declared for the South Australia Region from 1255 hrs.
The Actual LOR1 condition is forecast to exist until 1700 hrs
The contingency capacity reserve required is 440 MW
The minimum reserve available is 250MW
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the South Australia region - 03/03/2017
Cancellation of Actual (LOR1) condition in the South Australia region - 03/03/2017
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No. 57820 is cancelled at 1835 hrs 03/03/2017
Manager NEM Real Time Operations
Cancellation of Actual (LOR2) condition in the South Australia region - 03/03/2017
Cancellation of Actual (LOR2) condition in the South Australia region - 03/03/2017
The Actual LOR2 Condition in the South Australia Region advised in AEMO Electricity Market Notice No. 57818 & 57819 is cancelled at 1730 hrs 03/03/2017
An Actual LOR1 condition exists and is forecast to exist until 1830 hrs.
The contingency capacity reserve required is 450 MW
The minimum reserve available is 281 MW
AEMO is seeking a market response.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the South Australia region - 01/03/2017
Cancellation of Actual (LOR1) condition in the South Australia region - 01/03/2017
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No. 57769 is cancelled at 1825 hrs 01/03/2017
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region.- 01/03/17
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region.- 01/03/17
An Actual LOR1 condition has been declared for the South Australia Region from 1530 hrs.
The Actual LOR1 condition is forecast to exist until 1830 hrs.
The contingency capacity reserve required is 570 MW
The minimum reserve available is 456 MW
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the South Australia region.
Cancellation of Actual (LOR1) condition in the South Australia region.
Refer to AEMO Electricity Market Notice No. 57752
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No. 57752 is cancelled at 1900 hrs Tuesday, 28 February 2017.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region.- 28/02/17
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region.- 28/02/17
An Actual LOR1 condition has been declared for the South Australia Region from 1530 hrs.
The Actual LOR1 condition is forecast to exist until 1900 hrs.
The contingency capacity reserve required is 570 MW
The minimum reserve available is 412 MW
Manager NEM Real Time Operations
Cancellation Actual Lack Of Reserve Level 1 (LOR1) in the Qld Region - 12/02/17
Cancellation Actual Lack Of Reserve Level 1 (LOR1) in the Qld Region - 12/02/17
Refer Electricity Market Notice 57472
The Actual LOR1 condition declared for the Qld region is cancelled at 2020 hrs 12/02/2017
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the Qld Region - 12/02/17
Actual Lack Of Reserve Level 1 (LOR1) in the Qld Region - 12/02/17
An Actual LOR1 condition has been declared for the Qld region from 1600 hrs.
The Actual LOR1 condition is forecast to exist until 1730 hrs
The contingency capacity reserve required is 1123 MW
The minimum reserve available is 978 MW
Manager NEM Real Time Operations