Actual Lack Of Reserve Level 2 (LOR2) in the Qld region - 25/05/2021
Actual Lack Of Reserve Level 2 (LOR2) in the Qld region - 25/05/2021
An Actual LOR2 condition has been declared for the Qld region from 1640 hrs.
The Actual LOR2 condition is forecast to exist until 2130 hrs.
The capacity reserve required is 863 MW
The minimum reserve available is -1043 MW
AEMO is seeking an immediate market response.
An insufficient market response may require AEMO to implement a AEMO intervention event.
Manager NEM Real Time Operations
Cancellation of Actual (LOR2) condition in the SA region - 12/03/2021
Cancellation of Actual (LOR2) condition in the SA region - 12/03/2021
The Actual LOR2 Condition in the SA Region advised in AEMO Electricity Market Notice No 83263 is cancelled at 2030 hrs 12/03/2021
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 2 (LOR2) in the SA region - 12/03/2021
Actual Lack Of Reserve Level 2 (LOR2) in the SA region - 12/03/2021
An Actual LOR2 condition has been declared for the SA region from 1930 hrs.
The Actual LOR2 condition is forecast to exist until 2030 hrs
The capacity reserve required is 228 MW
The minimum reserve available is 97 MW
AEMO is seeking an immediate market response.
An insufficient market response may require AEMO to implement a AEMO intervention event.
Cancellation of Actual (LOR2) condition in the SA region - 24 Jan 2021
Cancellation of Actual (LOR2) condition in the SA region - 24 Jan 2021
The Actual LOR2 Condition in the SA Region advised in AEMO Electricity Market Notice No.82349 is cancelled at 1910 hrs 24/01/2021
Manager NEM Real Time Operations
Cancellation of Actual (LOR2) condition in the NSW region - 17/12/2020
Cancellation of Actual (LOR2) condition in the NSW region - 17/12/2020
The Actual LOR2 Condition in the NSW Region advised in AEMO Electricity Market Notice No.81347 is cancelled at 1805 hrs 17/12/2020
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 2 (LOR2) in the NSW region - 17/12/2020
Actual Lack Of Reserve Level 2 (LOR2) in the NSW region - 17/12/2020
An Actual LOR2 condition has been declared for the NSW region from1710 hrs.
The Actual LOR2 condition [is forecast to exist until 1830 hrs.
The capacity reserve required is 680 MW
The minimum reserve available is 588 MW
An insufficient market response may require AEMO to implement a AEMO intervention event.
Manager NEM Real Time Operations
System Reconfiguration - QLD Region - 20/11/2020
System Reconfiguration - QLD Region - 20/11/2020
The following transmission equipment in the Queensland region has been returned to service at 275 kV - 20/11/2020
H13 Ross - H39 Woree No. 8966 275 kV Transmission line - previously operated as 132 kV feeders 7327, 7132 and 7301
The following transmission equipment in the Queensland region has been taken out of service - 20/11/2020
H32 Chalumbin - H39 Woree No. 877 275 kV Transmission line - due to risk of cable failure
The following transmission equipment in the Queensland region has been deenergised - 20/11/2020
H13 Ross - H32 Chalumbin No. 857 275 kV Transmission line - to free up a bay at H13 Ross for the 8966 275 kV line
Manager NEM Real Time Operations
Correction - Cancellation of Actual (LOR2) condition in the NSW region - 01/02/2020
Correction to MN 73375 - External Reference date
The Actual LOR2 Condition in the NSW Region advised in AEMO Electricity Market Notice No. 73367 is cancelled at 2000 hrs 1/02/2020.
Manager NEM Real Time Operations
Cancellation of Actual (LOR2) condition in the NSW region - 31/01/2020
The Actual LOR2 Condition in the NSW Region advised in AEMO Electricity Market Notice No. 73367 is cancelled at 2000 hrs 1/02/2020.
Manager NEM Real Time Operations