Cancellation of a Non-Credible Contingency Event: Bannaby - Mt Piper 5A6 500kV line and Bannaby - Mt Piper 5A7 500kV line in NSW1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: NSW1
Lines: Bannaby - Mt Piper 5A6 500kV and Bannaby - Mt Piper 5A7 500kV
Cancellation time: 15/06/2025 17:59
Constraint set(s) revoked:
N-5A6+5A7_N-2 Constraint set contains the following interconnector(s) on the left hand side:
N-Q-MNSP1
NSW1-QLD1
VIC1-NSW1
Refer AEMO Electricity Market Notice 127562
Auto-generated on behalf of Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Bannaby - Mt Piper 5A6 500kV line and Bannaby - Mt Piper 5A7 500kV line in NSW1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: NSW1
Lines: Bannaby - Mt Piper 5A6 500kV and Bannaby - Mt Piper 5A7 500kV
Duration: 15/06/2025 16:57 until further notice
Constraint set(s) invoked:
N-5A6+5A7_N-2 Constraint set contains the following interconnector(s) on the left hand side:
N-Q-MNSP1
NSW1-QLD1
VIC1-NSW1
Auto-generated on behalf of Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 17/06/2025
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 127556 has been updated at 1415 hrs 15/06/2025 to the following:
[1.] From 1100 hrs 17/06/2025 to 1130 hrs 17/06/2025.
The forecast capacity reserve requirement is 765 MW.
The minimum capacity reserve available is 696 MW.
[2.] From 1400 hrs 17/06/2025 to 1430 hrs 17/06/2025.
The forecast capacity reserve requirement is 749 MW.
The minimum capacity reserve available is 629 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127546 has been updated at 1415 hrs 15/06/2025 to the following:
[1.] From 0730 hrs 17/06/2025 to 1030 hrs 17/06/2025.
The forecast capacity reserve requirement is 554 MW.
The minimum capacity reserve available is 414 MW.
[2.] From 1500 hrs 17/06/2025 to 1800 hrs 17/06/2025.
The forecast capacity reserve requirement is 418 MW.
The minimum capacity reserve available is 383 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 17/06/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127544 has been updated at 1315 hrs 15/06/2025 to the following:
[1.] From 1100 hrs 17/06/2025 to 1130 hrs 17/06/2025.
The forecast capacity reserve requirement is 737 MW.
The minimum capacity reserve available is 688 MW.
[2.] From 1400 hrs 17/06/2025 to 1430 hrs 17/06/2025.
The forecast capacity reserve requirement is 747 MW.
The minimum capacity reserve available is 620 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127545 has been updated at 2250 hrs 14/06/2025 to the following:
[1.] From 0600 hrs 17/06/2025 to 1800 hrs 17/06/2025.
The forecast capacity reserve requirement is 529 MW.
The minimum capacity reserve available is 392 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2025
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127541 has been updated at 2045 hrs 14/06/2025 to the following:
[1.] From 0600 hrs 17/06/2025 to 1000 hrs 17/06/2025.
The forecast capacity reserve requirement is 584 MW.
The minimum capacity reserve available is 503 MW.
[2.] From 1530 hrs 17/06/2025 to 1600 hrs 17/06/2025.
The forecast capacity reserve requirement is 535 MW.
The minimum capacity reserve available is 513 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 17/06/2025
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
[1.] From 1400 hrs 17/06/2025 to 1430 hrs 17/06/2025.
The forecast capacity reserve requirement is 801 MW.
The minimum capacity reserve available is 740 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the QLD region - 14/06/2025
Cancellation of Actual (LOR1) condition in the QLD region - 14/06/2025
The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.127542 is cancelled at 1808 hrs 14/06/2025.
Manager NEM Real Time Operations