NON-CONFORMANCE Region VIC1 Wednesday, 15 June 2016
NON-CONFORMANCE VIC1 Region Wednesday, 15 June 2016
AEMO declared a schedule generating unit non-conforming
Unit: HWPS2
Duration: 15/06/2016 09:20 to 15/06/2016 09:30
Amount: -11 MW
Constraint: NC-V_HWPS2
Auto-generated on behalf of Manager NEM Real Time Operations
NON-CONFORMANCE Region NSW1 Tuesday, 14 June 2016
NON-CONFORMANCE NSW1 Region Tuesday, 14 June 2016
AEMO declared a schedule generating unit non-conforming
Unit: MP2
Duration: 14/06/2016 18:25 to 14/06/2016 18:35
Amount: 82 MW
Constraint: NC-N_MP2
Auto-generated on behalf of Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Tuesday, 14 June 2016
NON-CONFORMANCE QLD1 Region Tuesday, 14 June 2016
AEMO declared a schedule generating unit non-conforming
Unit: YABULU2
Duration: 14/06/2016 15:30 to 14/06/2016 15:40
Amount: -14 MW
Constraint: NC-Q_YABULU2
Auto-generated on behalf of Manager NEM Real Time Operations
RESERVE NOTICE MT PASA PUBLICATION 14 JUNE 2016
The MT PASA RELIABILITY_LRC results published on 14 June 2016 forecast shows low reserve conditions (LRC) in South Australia for Summer 2016-17 and Summer 2017-18. AEMO will continue to monitor the situation and take appropriate actions, if necessary.
The MT PASA results for the next 12 months are summarised at:
http://www.aemo.com.au/Electricity/Data/Forecast-Supply-and-Demand/Medium-Term-Outlook
This notice supersedes Market Notice 53840 published on 10 June 2016.
Please find the following information on some key inputs used in MT PASA:
Static minimum reserve levels (MRLs) have been specified for QLD, NSW and TAS regions as follows:
QLD: 913 MW
NSW: -1564 MW
TAS: 144 MW
The following optimum shared minimum reserve levels between Victoria and South Australia regions have been specified:
VIC Reserve >= 205.00
5.88 * VIC Reserve + SA Reserve >= 1237.88
1.33 * VIC Reserve + SA Reserve >= 228.00
0.43 * VIC Reserve + SA Reserve >= -40.53
0.23 * VIC Reserve + SA Reserve >= -147.55
SA Reserve >= -368.00
In order to remain consistent with the calculation of the minimum reserve levels, the following interconnector headroom constraints (net import/export limit constraints) have also been applied in MT PASA:
QLD: 0 MW of maximum net import into QLD.
NSW: 330 MW of minimum net export from NSW.
VIC: 940MW of maximum net import into VIC.
SA: 0 MW of maximum net import into SA.
Demand Side Participation included in MT PASA are:
Summer: QLD 156 MW, NSW 422 MW, VIC 245 MW, SA 167 MW and TAS 73 MW
Winter: QLD 156 MW, NSW 422 MW, VIC 185 MW, SA 167 MW and TAS 73 MW
Supply Planning
AEMO
Cancellation - Reclassification of the loss of Wagga 132kV B bus, the No2 and the No3 330/132kV transformers in NSW region.
Cancellation - Reclassification of the loss of Wagga 132 kV B bus, the No 2 and the No 3 330/132 kV transformers in NSW region - 14/06/2016.
Refer to Electricity Market Notice 53874 and 53888
Based on advice from the asset owner the circumstances that existed in relation to the tripping of the Wagga substation 132 kV B bus, the No2 and the No3 330/132 kV transformers have now been addressed
Therefore AEMO no longer considers the simultaneous trip of the Wagga substation 132 kV B bus, the No2 and the No3 330/132 kV transformers to be a credible contingency event from 1055 hrs 14/06/2016 .
Manager NEM Real Time Operations
[EventId:201606140645_confirmed] Prices for interval 14-Jun-2016 06:45 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0641 hrs on 14 June 2016
PRICES ARE NOW CONFIRMED for dispatch interval 14-Jun-2016 06:45.
In accordance with Market Notice 53961 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:201606140640_confirmed] Prices for interval 14-Jun-2016 06:40 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0641 hrs on 14 June 2016
PRICES ARE NOW CONFIRMED for dispatch interval 14-Jun-2016 06:40.
In accordance with Market Notice 53960 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:201606140645_review] Prices for interval 14-Jun-2016 06:45 are subject to review
Issued by Australian Energy Market Operator Ltd at 0640 hrs on 14 June 2016
PRICES ARE SUBJECT TO REVIEW for dispatch interval 14-Jun-2016 06:45.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2(b) of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:201606140640_review] Prices for interval 14-Jun-2016 06:40 are subject to review
Issued by Australian Energy Market Operator Ltd at 0635 hrs on 14 June 2016
PRICES ARE SUBJECT TO REVIEW for dispatch interval 14-Jun-2016 06:40.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2(b) of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.