Filter by category
Filter by Date
[EventId:202506161055_confirmed] Prices for interval 16-Jun-2025 10:55 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1100 hrs on 16 June 2025
PRICES ARE NOW CONFIRMED for trading interval 16-Jun-2025 10:55.
In accordance with Market Notice 127586 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202506161050_confirmed] Prices for interval 16-Jun-2025 10:50 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1100 hrs on 16 June 2025
PRICES ARE NOW CONFIRMED for trading interval 16-Jun-2025 10:50.
In accordance with Market Notice 127585 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202506161045_confirmed] Prices for interval 16-Jun-2025 10:45 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1100 hrs on 16 June 2025
PRICES ARE NOW CONFIRMED for trading interval 16-Jun-2025 10:45.
In accordance with Market Notice 127583 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202506161035_confirmed] Prices for interval 16-Jun-2025 10:35 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1100 hrs on 16 June 2025
PRICES ARE NOW CONFIRMED for trading interval 16-Jun-2025 10:35.
In accordance with Market Notice 127580 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
Cancellation - Possible intervention to manage power system security in South Australia (SA) region 16/06/2025
Cancellation - Possible intervention to manage power system security in South Australia (SA) region 16/06/2025
Refer Market Notice 127570
AEMO no longer foresees a possible requirement for intervention to manage power system security in SA region. The advice of possible intervention is cancelled from 0840 hrs 16/06/2025.
Manager NEM Real Time Operations
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2230 hrs 16/06/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 15/06/2025
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 127555 is cancelled at 1800 hrs 15/06/2025.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 17/06/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:
[1.] From 1800 hrs 17/06/2025 to 2230 hrs 17/06/2025.
The forecast capacity reserve requirement is 644 MW.
The minimum capacity reserve available is 594 MW.
Manager NEM Real Time Operations
Direction - SA region to AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Direction - SA region to AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Refer to Market Notice 127557
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN at 1600 hrs 15/06/2025
Type of resource: generating unit
Required actions: Remain synchronised and follow dispatch targets at 2300 hrs 15/06/2025
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: The synchronous generating units currently expected to be synchronised in SA will be inadequate to maintain sufficient Voltage Control in SA. Intervention is required to maintain the power system in a secure operating state
Expected duration: 1500 hrs 16/06/2025.
AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations