Actual Lack Of Reserve Level 2 (LOR2) in the Qld Region - 12/02/17
Actual Lack Of Reserve Level 2 (LOR2) in the Qld Region - 12/02/17
An Actual LOR2 condition has been declared for the Qld region from 1700 hrs.
The Actual LOR2 condition is forecast to exist until 1800 hrs
The contingency capacity reserve required is 680 MW
The minimum reserve available is 548 MW
AEMO is seeking a market response.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the Qld Region - 12/02/17
Actual Lack Of Reserve Level 1 (LOR1) in the Qld Region - 12/02/17
An Actual LOR1 condition has been declared for the Qld region from 1600 hrs.
The Actual LOR1 condition is forecast to exist until 1730 hrs
The contingency capacity reserve required is 1123 MW
The minimum reserve available is 978 MW
Manager NEM Real Time Operations
Cancellation - Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region - 11-02-2017
Cancellation - Actual Lack Of Reserve Level 1 (LOR1 in the NSW Region - 11-02-2017
Refer Electricity Market Notice 57412
The Actual LOR1 declared for the NSW region is cancelled from 1820 hrs.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region - 11-02-2017
Actual Lack Of Reserve Level 1 (LOR1 in the NSW Region - 11-02-2017
An Actual LOR1 condition has been declared for the NSW region from 1210 hrs.
The Actual LOR1 condition is forecast to exist until 1500 hrs
The contingency capacity reserve required is 1330 MW
The minimum reserve available is 803 MW
Manager NEM Real Time Operations
Cancellation - Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region - 10-02-2017
Cancellation - Actual Lack Of Reserve Level 1 (LOR1 in the NSW Region - 10-02-2017
Refer Electricity Market Notice 57402
The Actual LOR1 declared for the NSW region is cancelled from 1930 hrs.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region - 10-02-2017
Actual Lack Of Reserve Level 1 (LOR1 in the NSW Region - 10-02-2017
An Actual LOR1 condition has been declared for the NSW region from 1830 hrs.
The Actual LOR1 condition is forecast to exist until 1900 hrs
The contingency capacity reserve required is 1340 MW
The minimum reserve available is 843 MW
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 2 (LOR2) in the NSW Region - 10-02-2017
Actual Lack Of Reserve Level 2 (LOR2) in the NSW Region - 10-02-2017
An Actual LOR2 condition has been declared for the NSW region from 1635 hrs.
The Actual LOR2 condition is forecast to exist until 1730 hrs
The contingency capacity reserve required is 675 MW
The minimum reserve available is 570 MW
AEMO is seeking a market response.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region- 10-02-2017
Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region- 10-02-2017
An Actual LOR1 condition has been declared for the NSW Region from 1250 hrs.
The Actual LOR1 condition is forecast to exist until 2000 hrs
The contingency capacity reserve required is 1345 MW
The minimum LOR1 reserve available is 861 MW
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the South Australia region.
Cancellation of Actual (LOR1) condition in the South Australia region.
Refer to AEMO Electricity Market Notice No. 57349
The Actual LOR1 Condition in the South Australia Region is cancelled at 2000 hrs Thursday, 9 February 2017.
Manager NEM Real Time Operations