[EventId:201609291020_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 29 September 2016 10:20
Issued by Australian Energy Market Operator Ltd at 1020 hrs on 29 September 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 29 September 2016.
Refer to market notice: 55032
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1020 hrs on 29 September 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201609290900_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 29 September 2016 09:00
Issued by Australian Energy Market Operator Ltd at 0900 hrs on 29 September 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 29 September 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 0900 hrs on 29 September 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:201609282255_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 28 September 2016 22:55
Issued by Australian Energy Market Operator Ltd at 2255 hrs on 28 September 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 28 September 2016.
Refer to market notice: 55022
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 2255 hrs on 28 September 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201609282235_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 28 September 2016 22:35
Issued by Australian Energy Market Operator Ltd at 2235 hrs on 28 September 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 28 September 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 2235 hrs on 28 September 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:201609282055_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 28 September 2016 20:55
Issued by Australian Energy Market Operator Ltd at 2055 hrs on 28 September 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 28 September 2016.
Refer to market notice: 55018
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 2055 hrs on 28 September 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201609282035_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 28 September 2016 20:35
Issued by Australian Energy Market Operator Ltd at 2035 hrs on 28 September 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 28 September 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 2035 hrs on 28 September 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:201609222000_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 22 September 2016 20:00
Issued by Australian Energy Market Operator Ltd at 2000 hrs on 22 September 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 22 September 2016.
Refer to market notice: 54947
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.
The negative residue constraint NRM_QLD1_NSW1 ceased operating at 2000 hrs on 22 September 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201609221840_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 22 September 2016 18:40
Issued by Australian Energy Market Operator Ltd at 1840 hrs on 22 September 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 22 September 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.
The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 1840 hrs on 22 September 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region - 13, 14 and 16 Sep 2016
Refer to AEMO Market Notices: 54734, 54735 and 54864.
Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region for the following periods:
On 13/09/2016 from 0700 hrs to 1700 hrs;
On 14/09/2016 from 0700 hrs to 1700 hrs; and
On 16/09/2016 from 0700 hrs to 1700 hrs.
AEMO declares Forecast LOR2 conditions in the South Australia region for the above periods. During these periods, outages are scheduled for Moorabool to Mortlake No.2 500 kV transmission line in Victoria region.
On the occurrence of a credible contingency during these outages, South Australia region could separate from the rest of the NEM and is likely to result in interruptions to power supplies in South Australia.
There are sufficient capacity reserves in the South Australia region to meet electricity demand but following the next credible contingency it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing interruptions to power supplies in South Australia.
Harmohan Singh
Operations Planning