Filter by category
Filter by Date
Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region - PDPASA - 7 Jul 2016
Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region - PDPASA - 7 Jul 2016
AEMO declares a Forecast LOR2 condition for the SA Region.
From 1800 hrs to 1930 hrs 7 July 2016
The contingency capacity reserve required is 200 MW
The minimum reserve available is 149 MW
AEMO is seeking a market response.
AEMO is not intending to intervene at this point in time.
Manager NEM Real Time Operations
Cancellation - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region - PDPASA - 7 Jul 2016
Cancellation - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region - PDPASA - 7 Jul 2016
The Forecast LOR2 condition in the SA Region advised in AEMO Electricity Market Notice No. 54264 is cancelled at 1205 hrs 7 Jul 2016.
Manager NEM Real Time Operations
Update - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region - PDPASA - 7 Jul 2016
Update - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region - PDPASA - 7 Jul 2016
Refer to MN 54252
AEMO declares a Forecast LOR2 condition for the SA Region.
From 1830 hrs to 1930 hrs 7 July 2016
The contingency capacity reserve required is 200 MW
The minimum reserve shortfall is up to 15 MW
AEMO is seeking a market response.
AEMO is not intending to intervene at this point in time.
Manager NEM Real Time Operations
[EventId:201607070955_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 07 July 2016 09:55
Issued by Australian Energy Market Operator Ltd at 0955 hrs on 7 July 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 7 July 2016.
Refer to market notice: 54257
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.
The negative residue constraint NRM_SA1_VIC1 ceased operating at 0955 hrs on 7 July 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201607070905_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 07 July 2016 09:05
Issued by Australian Energy Market Operator Ltd at 0905 hrs on 7 July 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 7 July 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.
The negative residue constraint set NRM_SA1_VIC1 commenced operating from 0905 hrs on 7 July 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region - PDPASA - 7 Jul 2016
Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region - PDPASA - 7 Jul 2016
AEMO declares a Forecast LOR2 condition for the SA Region.
From 1830 hrs to 1900 hrs 7 July 2016
The contingency capacity reserve required is 200 MW
The minimum reserve available is 195 MW
AEMO is seeking a market response.
Manager NEM Real Time Operations
Cancellation of the Forecast (LOR2) condition in the SA region - PDPASA - 07 July 2016
Cancellation of the Forecast (LOR2) condition in the SA region - PDPASA - 07 July 2016
The Forecast LOR2 condition in the SA Region advised in AEMO Electricity Market Notice No.54241 and 54232 is cancelled at 1715 hrs 07 July 2016
Manager NEM Real Time Operations
Update - Forecast Lack of Reserve Level 2 (LOR2) in the SA region - PDPASA - 07 July 2016
RE: AEMO Electricity Market Notice No. 54232
Update - Forecast Lack of Reserve Level 2 (LOR2) in the SA region - PDPASA - 07 July 2016
AEMO declares a Forecast LOR2 condition for the SA region.
From 1830 hrs to 1900 hrs 07 July 2016
The contingency capacity reserve required is 200 MW
The minimum reserve available is 192 MW
AEMO is seeking a market response.
Manager NEM Real Time Operations
Forecast Lack of Reserve Level 2 (LOR2) in the SA region - PDPASA - 07 July 2016
Forecast Lack of Reserve Level 2 (LOR2) in the SA region - PDPASA - 07 July 2016
AEMO declares a Forecast LOR2 condition for the SA region.
From 1830 hrs to 1930 hrs 07 July 2016
The contingency capacity reserve required is 220 MW
The minimum reserve available is 198 MW
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations